

Model | CGF14125 | CGF18186 | CGF24248 | CGF323210 | CGF404012 |
Number of washing, filling and capping heads | 14-12-5 | 18-18-6 | 24-24-8 | 32-32-10 | 40-40-12 |
Production capacity(600ml) (B/H) | 4000-5000 | 5000-6000 | 8000-12000 | 12000-15000 | 16000-20000 |
suitable bottle specification(mm) | φ=50-110 H=170 volume=330-2250ml | ||||
Washing pressure(kg/cm2 ) | 2~3 | ||||
Motor power(kw) | Main motor 2.2kw | Main motor 3kw | Main motor 3.8kw | Main motor 5.5kw | Main motor 7.5kw |
Overall dimensions (mm) | 2400×1650 ×2500 | 2400×1830 ×2400 | 3100×2200 ×2400 | 3800×2800 ×2900 | 4600×2800 ×2900 |
Weight (kg) | 2500 | 3500 | 4000 | 6500 | 8500 |
Machine Details

Washing Parts.
- The entry system uses an air conveyor directly linked with the bottle dial for seamless operation.
- Crafted with all 304/316 stainless steel rinse heads, the water spray inject design significantly reduces water usage while ensuring pristine cleanliness.
- The 304/316 stainless steel gripper, equipped with a plastic pad, minimizes bottle collisions during the washing process, ensuring a smoother operation.
- The 304/316 stainless steel washing pump enhances the machine's longevity, promising durability and robustness.
- Filling volumes can be finely adjusted, maintaining an even liquid level post-filling for optimal product presentation.
- All contact parts and the liquid tank are made of 304/316 stainless steel with a fine polish and no dead corners, making cleaning effortless and effective.
- Durable 304/316 stainless steel filling pumps ensure reliable performance in all conditions.
- Efficient spray nozzles provide thorough rinsing while conserving water during the flushing process.


- Constructed entirely from 304/316 stainless steel, ensuring robustness and durability.
- The no bottle, no capping feature maintains efficiency and reduces waste.
- The machine halts automatically when bottles are absent, ensuring seamless operation and preventing any mishaps.
- Capping is executed with stability and reliability, boasting a defective rate of ≤0.2%, ensuring high-quality output every time.
Machinery Capacity
Application
Introducing the Automatic Small Mango Grape Fresh Juice Beverage Bottling Filling Capping Machine: Revolutionizing the way bottling is done, this state-of-the-art machine seamlessly integrates the processes of bottling, filling, and capping to ensure exceptional quality and efficiency for mango, grape, and other fresh juice beverages.
1. Our premium packaging utilizes a combination of robust film and sturdy wooden materials, meticulously designed to provide the utmost protection and secure handling of your valued products during transit.






Q: How long is your delivery cycle after you order the machinery? A: Generally it is 40 working days.
Q: Do you have a relevant after-sales system? A: We have a Perfect after-sales system. 1: 12 months warranty. 2: Many-to-one service, we will solve basic problems through phone, email, whatsapp, WeChat and video calls. The operation manual will be sent with the machine or via e-mail. 3: If conditions permit, the engineer will go to the buyer's factory to install and test the machine, and train the buyer's staff on how to operate and maintain the machine.
Q: If I want to buy a machine, what information do I need to tell you? A: 1: What liquid do you want to fill? 2: What is the capacity and height of the bottle? 3: What is the output in one hour? 4: Related water quality analysis reports, etc. 5: Required mechanical voltage
Q:How to ensure that you deliver goods on time and ensure the safety of my funds? 1:We guarantee the on-time delivery and quality of the equipment you purchase through the credit insurance service. 2:With the letter of credit, you can easily lock in the delivery time. 3:After visiting the factory/video watching the factory, you can ensure the authenticity of our bank account.
Q:How do you ensure the quality of the machine? 1:To ensure the accuracy of parts. We are equipped with a variety of professional processing equipment, plus professional processing methods accumulated over the years. 2:Before the machine is assembled, each part is inspected by the inspector. 3:Assemble machines, all with masters with more than 5 years of work experience to operate. 4:After all the equipment is completed, we will connect all the machines and allow at least 12 hours for a complete production line to test its stability.
