32 Cavity 30/25 Mineral Water Cap Mold with Slider System

Price $1500.00 Compare
Min Order 4 CAVITY
Shipping From Zhejiang, China
Popularity 372 people viewed
Quantity
+-
 

TAIZHOU HUANGYAN DAELONG MOLD CO., LTD.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
DAE-32C
2 Million Shots
Injection Mould
Polishing
Multi Cavity
PE
Muti-Process Treatment
Water Package
Hot Runner
UG
Fixed
CE
Injection Mold
Customized
Best After Sales Service
Hot Runner
Injection Mold
DAELONG
Standard Export Package
0.65CBM
China
84807190
Product Description
Taizhou Huangyan Daelong Mold Co., Ltd ( Taizhou Huangyan Hengyuan Mold & Plastic factory) early from the establishment, is devoted to all kinds of Preform mould, Cap mould and other kinds of plastic mould.

We continually works on development and improvement for holding the management tenets of integrity, Quality first and Credit Tops. By far, We are in possession of one lot advanced equipment and one excellent team. Our Products have already been setup good relationship with many domestic and oversea clients, We serve for customers with advanced technology, good quality, reasonable price and considerate after sale service, Our products are famous and get good reputation in both domestic market and oversea market.

Welcome you to our factory for further negotiation.

THE MATERIAL OF THE MOLD
Mould cavityS136 from Sweden ASSAB with HRC 50-52
Mould coreS136 from Sweden ASSAB with or M310 from Austria with HRC 52-55
Mould core sleeveDC11 from Japan or W302 from Austria with 60-62HRC
Core Central EjectorBeryllium Copper + Chroming treatment with HRC 62-64 HRC
Ejector wayEjector plate+ Ejector sleeve
Mould Manifold plateH13 from America for hot runner mold.
Mould other plateP20
Hot runner systemhot runner
Free spare parts of mouldCore set : 1set/ cavity: 1 Piece/ hot runner system:1set/PID controller system: 1Set/ other easy broken spare parts for each 8 cavities cap mould.  
Gurantee of the mould1 year or 1 million shot times(in this period, if the mold have problem, we will offer the parts or service by free, but not include the problems cased by wrong operation)
The life of the mould5-6 years, Even in 10 years in good maintenance 
Installation & CommissionOur technician can be the buyer's factory to install and run the mould. But the buyer should bear all the cost for the technician's trip(include the air ticket, the cost of the accommodation and the salary)
Remark: Our mould different part will used different material. All the material was important and special for making cap mould. The mould material choice can make sure the mould action and mould running life








Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA