Rapid Assembly Plastic Ventilation Formwork for Heavy Loads

Price $10.00 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 413 people viewed
Quantity
+-
 

Suzhou Topo New Material Co., Ltd.

VIP   Audited Supplier 5 years
Profile Certified by SGS/BV
Plastic Construction Formwork
Online
2 Years
ISO
Plastic
Slab Formwork
Online Technical Support
Customized
Construction
TOPO NEW
Customized
58*58*15cm
China
3925900000
Product Description
For sloped or flat ventilated floors 
Product nameDisposable Formwork for the construction of ventilated foundations
ColorCustomized Color
Product advantages

1. Solved the problems of radon and humidity;

2. Compared with traditional construction methods, the installation speed is increased by 80 (compared to traditional concrete pouring);   

3. Compared with the use of traditional building materials, the system can save money, especially in transportation and installation;

4. The height and size of the template in the TPDVF system can be adjusted as required to suit your design;

5. Allows easy installation of pipes and other facilities within the created void space.  

ApplicationsBuilding Construction
Product size

Our general specifications are 50cm*50cm, height (3, 6, 9, 13, 15, 17, 20, 25, 27, 30, 35, 40, 45, 50, 55, 60, 65, 70) cm, we can also be customized according to customer requirements.

Product Materialpp
 
Typical technical data of TPDVF system:

Advantages of Revak System:

The air cavity formed by the Revak System modules must be connected to the outside with simple pipes. This creates a natural airflow that crosses the cavity and eliminates moisture and Radon gas (if present).

1. Reduction of manpower requirements by up to 80% in comparison to traditional systems.

2. Drastic reduction in the use of concrete and aggregates as the arch form permits maximum resistance with a minimum thickness.

3. Possibility to implement, in a single solution, foundation beams and the slab with the help of the L-Plast accessories.

4. Adaptable to non-standard spaces as the modules can be cut without underpinning.

5. Ease of positioning due to lightness and simple linking of the modules.

6. Simple adaptation to various perimeters.

7. Quick and immediate cutting and shaping of the modules.

8. Passage of the underground systems in every direction.

9. Creation of a barrier against humidity.

10. Tightness against rising humidity.

11. Effective ventilation in all directions.

12. Disposal of any RADON gas.

13.No points of contact between the concrete and the ground.

14. Perfect transpiration of the perimeter wall.



Are you a trading company or manufacturer?

We are manufacturer.

 

About Sample?

Few samples can be offered per your request.

 

About Material Color?

We can make the material to your appointed color according to Pantone/RAL#.


How does your factory control the quality?
Quality is the Priority, we always pay great importance to quality from beginning to end, and we have professional QC for item quality from spare parts to finished goods.

 

 How many days for mass production?

20 days after all artwork and 30% deposit are confirmed.
 

 How can I get the samples? Is the sample free? 

7-10 days to send free samples by DHL, TNT, and UPS.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA