Three-Phase Electricity Power Energy Meter for EV Charger with MID Certificate

Price $70.87 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 432 people viewed
Quantity
+-
 

Jiangsu Acrel Microgrid Institute Co., Ltd

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
ADL400
Digital
Direct Connected
Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter, Reactive Energy Meter, Multi-rate Watt-hour Meters, Maximum Demand Meter
Single-phase
Electronic Meter
Terminal
Continuous Wave
Energy Meter
RoHS, ISO, CE
Customized
Three Phase
0.5s Grade
RS485, Infrared
Modbus-RTU
MID, CE, Eac
Acrel
Carton
ADL400
China
9028301400
Product Description

Three-phase Electric Energy Power Meter
with MIC CE EA Certificates for EV Charger

Single-phase ADL200 & Three-phase ADL400 energy meter adopts DIN35mm din rail installation with LCD display, it can measure electric parameters and energy pulse output, RS485 communication, which has the advantages of small size, high precision, good reliability, and convenient installation.
 

Power Meter Parameter

Power Meter Installation

Three-phase Power Meter ADL400

3/10(80)A Current Input Directly
 

3*1(6)A Current Input via CT

 

Networking

Related Products

AC 1P Single-phase KWH MeterSingle-phase Power Meter with MIDThree-phase Power Meter with MID4G WIFI LORA LORAWAN Wireless Energy MeterDC Energy Meter

Installation Instructions

 

 

FAQ

Q: The power or energy count is inaccurate after the meter is powered on.
A: Switch the meter display to the power (active power P, power factor λ) interface, and check whether the power display is negative or not. And whether the power factor is between 0.9-0.95, and then check whether the incoming and outgoing wires of the current signal wire are connected reversely (that is, the current incoming wire must be the same as the incoming wire end of the instrument) and consistent with the wiring diagram on the instrument.


Q: The instrument cannot communicate with the host computer usually after powering on.
A:1. The voltage value between the communication output A and B of the measuring instrument should be between +(4.4-4.5)V;

    2. Check whether the communication wiring method is correctly wired in accordance with the wiring diagram requirements (that is, the communication terminal A/B of the corresponding to communication serial port A/B)

Certifications

MIDCE

 

Company Profile

Acrel Co., Ltd.[stock code: 300286.SZ] is a high-tech enterprise that integrates R&D, production, sales, and service, since its establishment, is committed to providing users with energy efficiency management and powerful security system solutions. Acrel Electric has a complete production line from cloud platform software to sensors.
Acrel energy efficiency management system including substation operations and maintenance cloud platform, electricity safety management cloud platform, Environmental equipment power consumption monitoring cloud platform, prepaid management (system) cloud platform, intelligent power distribution monitoring system, power quality management system, building energy consumption management system, industrial energy control platform, leakage power monitor and control system, fire-fighting device power monitoring system, fire-proof door monitoring system, emergency lighting and evacuation indicating system, EV charger management system, data center power&environment monitoring system, smart lighting control system, IT isolation power supply system and related products.
The company attaches great importance to product quality and innovation. By the end of 2018, the company has 5 trademarks, 18 invention patents, 72 utility model patents, 94 appearance patents, and 147 computer software Copyrights, and has participated in the formulation of national or industrial standards.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA