Tunnel Formwork

Tunnel formwork is a system of formwork that can be used during a normal cycle to cast the walls and formwork of a program. This system produces effective load-bearing structures that are widely used. It is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure.
Depending on the size of the structure, tunnel formwork system provides casting of a floor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production flaws and have reduced fine-structure labor costs.
Material | Q235 |
Surface Treatment | Spray finish |
Formwork Lifespan | 3-5 years |
Recycling Times | More than 600 times |
Recycling Speed | Daily |

Factory pre-assembled, easy to disassemble: Reduce on-site workload by providing pre-assembled modules that are easy to assemble and disassemble.
All-steel structure, strong and durable: Ensure stability and reliability, and the sturdy structure can withstand heavy use.
Fast pouring cycle: Depending on the size of the structure, the system can pour the slab in just one or two days.





Introduction

Till now, we have cooperated with lots of top formwork companies and construction companies, such as DOKA,PERI and etc. Our advanced production equipment and proficient front-line employees will guarantee you products with better quality and less time.
Besides, Lianggong has a professional technical department working together with sales department to ensure our customers' requirements are fully achieved. We offer one-stop service, you can choose products either off-the-shelf or customized.
What's more, our company has established a quality management system that meets the requirements of the international quality management system. Our products have strict quality control from the procurement of raw materials to the sale of finished products which have been used in many projects such as industrial civil engineering works, roads and bridges, hydroelectric dam and nuclear power station. We can accept O E M and O D M.
We sincerely welcome friends from all over the world to visit our company and cooperate with us on the basis of long-term mutual benefits.
For more information, feel free to contact us. We are looking forward to receiving your enquiry soon.



1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.


1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.



1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q1: Are you trading company or manufacturer?
A: We are manufacturer.
A: We design and manufacture formworkand scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings,towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to thebuilders.
A:Structural drawing and section drawing.
A: In general, it takes 5~7 days based on specific requirements of construction project.
