Lianggong China Column Pier Bridge Steel Formwork for Concrete Construction

Price $1200.00 Compare
Min Order 100 Tons
Shipping From Jiangsu, China
Popularity 475 people viewed
Quantity
+-
 

YANCHENG LIANGGONG FORMWORK CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
Steel Formwork
Remote Service
1 Year
ISO, CE
Steel
Column Formwork
Project Drawing
Bridge Column Construction
Remote or on-Site Instruction
3-4.5mm
Red,Blue, or Customized
LIANGGONG
Standard Packing
Customized
China
7308400000
Product Description

Steel Formwork for Bridge and Construction

Steel formwork is strong and durable, therefore can be reused many times in construction. It is easy to assemble and erect. With fixed shape and structure, it is extremely suitable to apply to the construction for which much quantity of same-shaped structure is required, e.g. high rise building,road, bridge etc.

 
 
Quality Custom Bridge Steel Column Pier Formwork System
The Pier Formwork is very important in the construction of highway bridge, overpass bridge, railway bridge, pedestrian bridge,
ramp bridge etc. It is used for concrete Colunm Pier Casting in situ, common shapes are: top round pier, cone pier, Y shape pier,
hyperbola pier, vase shape pier, linear shape pier, V shape pier, rectangle pier and other speacial shape etc.

According to the shape of Pier Formwork, these formworks are always devided into two types: 
1.General type (Cross Section Shape: Circle, Square, rectangle, Oval) 
2.Special type (Cross Section Shape: Curved, Parabolic, other special design)

Features of General Type and Special Type:
Gerneral Type: Nice Universality, Good economic benefit, High reusable rate, Short lead time.
Special Type: Attractive Appearance, Specially Designed for Certain Application, Longer lead time with higher costs.
For the Pier Fromwork of special type, there are 3 common shapes widely applied in the bridge constructions:
A.Hyperbolic Pier Formwork: Used in road bridge, railway bridge, flyover, ramps, etc. 
B.Portal Pier Formwork: Used in road  bridges, railway bridges, such as: Double-Pier, Triple-Pier, Multi-Pier. 
C.Corbel Pier Formwork: Used in freight railway bridges, including pier body and pier cap forms.

Products Show
 
 

Characteristic
 
Bridge Formwork
ItemPart nameBridge Formwork
1MaterialQ235B,Q345,Q355 Steel
2Design timeThe time of design the fabrication drawings is 5 days.
3FabricationThe normally time is about 40 days.
4PaintingEach formwork paint three times,a primer,a middle paint,a top paint.Prevent rust corrosion of formwork.
5DeliveryLIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port.LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port.
6Installation on project siteLIANGGONG can arrange 1-2 enginner to provide technical support to the project site.

Application
Wall Formwork

Steel formwork are primarily applied in wall formwork, especially in construction with high intensity and repetitive tasks. It offers durability, high load-bearing capacity, and precision, which boosts construction efficiency and shortens project time.

Compared to traditional wooden formwork, steel formwork reduce material waste and can be reused multiple times, lowering costs.

Additionally, the smooth surface of steel formwork improves the quality of concrete finishes. Ultimately, steel formwork enhance stability and safety in construction.

Column Formwork

The advantages of steel formwork on-site mainly lie in its high strength, durability, and precision, especially for complex structures like columns. Columns require high-forming standards, and steel formwork offers stable support to prevent deformation, ensuring smooth surfaces and precise dimensions.

Additionally, the ease of assembly and disassembly accelerates the construction process. The professionalism in steel formwork production is reflected in its precise design and high manufacturing standards, ensuring its effectiveness in complex structures.
 
Packing&Delivery
 
Packing Details:Package Box, Steel Pallet, Steel Frame, Container.

Delivery Details:Generally it is 5-30 days, it is according to quantity.

Port: Shanghai
 


Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company

Customer Photos


FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA