Glavanized Construction Metal Walk Board Plank with O Hook for Multidirectional Scaffolding
This kind of steel plank is for ringlock scaffolding, with special profile and classic design, o/U hooks are welded on each end, so to fit with the o ledgers horizontally.
Ringlock Scaffolding(Ring Lock Scaffolding )is the most flexible and efficient kind of system scaffolding, it is widely used in the world. There are 8 holes in the rosettes plates welded at 0.5m intervals along the standards. 8 different directions can be connected only in one plate. Just several blows of the hammer to the wedges inserted into the holes, so the components can be firmly connected and assembled.
1) Raw material: Q345 & Q235
2) Processing method: automatic welding
3) Finishing: hot dip galvanized
4) Package: steel pallet
5) Test Standard: AS/NZS 1576.2:3:2015
6) Processing capacity: 30*40HC per month
No | Picture | Name | Size | Surface Treatment | Unit Weight (KG/PC) |
1 | ![]() | Vertical Standard 48.3*3.2mm | 0.5m | HDG | 3.2 |
2 | 1.0m | 5.7 | |||
3 | 1.5m | 8.2 | |||
4 | 2.0m | 10.5 | |||
5 | 2.5m | 13.2 | |||
6 | 3.0m | 15.4 | |||
7 | ![]() | Starting Collar | 0.23m | HDG | 1.74 |
8 | 0.33m | 2.3 | |||
9 | ![]() | Ledger 48.3*3.0mm | 0.73m | HDG | 3.2 |
10 | 1.09m | 4.5 | |||
11 | 1.40m | 5.5 | |||
12 | 1.57m | 6.2 | |||
13 | 2.07m | 8.0 | |||
14 | 2.57m | 9.75 | |||
15 | 3.07m | 11.45 | |||
16 | ![]() | U type Side Bracket | 0.39m | HDG | 4.7 |
17 | 0.73m | 7.6 | |||
18 | ![]() | U Type/ O type Steel Plank 320*76*1.5mm | 3.07m | HDG | 23.87 |
19 | 2.57m | 19.55 | |||
20 | 2.07m | 15.44 | |||
21 | 1.57m | 12.17 | |||
22 | 1.09m | 8.82 | |||
23 | 0.73m | 6.16 | |||
24 | ![]() | Steel toe board 150*27*1.5mm | 0.73m | PRE- Galvanized | 2.16 |
25 | 1.09m | 3.04 | |||
26 | 1.4m | 3.80 | |||
27 | 1.57m | 4.22 | |||
28 | 2.07m | 4.45 | |||
29 | 2.57m | 6.68 | |||
30 | 3.07m | 7.91 | |||
31 | ![]() | Aluminu platform with ladder/door (polywood plank) | 3.07m*610mm | Alu-plywood | 28 |
32 | 2.57m*610mm | 24.5 | |||
33 | 2.07m*610mm | 21.5 | |||
34 | ![]() | Aluminum platform with ladder /door (Aluminum plank) | 2.07*610mm | Aluminium | 22.50 |
35 | 2.57*610mm | 25.10 | |||
36 | 3.07*610mm | 29.30 | |||
37 | ![]() | Aluminium Stairs | 3.07mx2.0m | Aluminium | 36 |
38 | 2.57mx2.0m | 30 | |||
39 | 2.07mx2.0m | 26 | |||
40 | ![]() | Aluminium Lattice Girder | 8.2m | Aluminium | 31 |
41 | 7.2m | 27.2 | |||
42 | 6.2m | 23.6 | |||
43 | 5.2m | 20 | |||
44 | 4.2m | 16.3 | |||
45 | 3.2m | 12.7 | |||
46 | ![]() | Jack Base | Ø38x4.0x600mm | EG | 3.4 |
47 | ![]() | Solid swivel jack base | φ34*650mm | EG | 7.3 |
48 | ![]() | Wall Tie | 1.1m | HDG | 4.4 |
49 | 1.5m | 5.65 |








Rizhao Weiye Tools is an China based scaffolding products manufacturer, located in Rizhao, Shandong, China.
Since WEIYE's inception in 1990, WEIYE produces a broad and comprehensive range of building materials products. All our products meet BS1139/EN74/AS1576 standard and sell to Europe, America, Australia,etc areas.
Currently, we have well-trained workers of more than 300, advanced forging lines of 10 and many other advanced equipment. We are also capable of tooling designing, performance testing, new products researching and developing. We have two factories taking up to 160000 square meters. With years of development, we can reach a production capacity of more than 20 containers per month. We are growing all the time.
We have our own zinc plating and powder coating workshops and cast steel/cast iron part processing workshop, which enable fastest delivery and most consistent quality of the products.
We are looking forward to establishing long term business relationship with you in the near future!
The main products are as follows:
--Scaffolding Couplers
--System Scaffoldings (Ringlock/Cuplock/Kwikstage/Haki scaffolding)
--Frame Scaffoldings (Pin-type Italian scaffolding/ European type frame/ Australia type, etc)
--Scaffolding Planks
--Shoring Props
--Formwork Accessories
Services offered and You can Find Us Anytime:

--- 10 sets of Automatic Robert Arm Welding Machines which makes welding process faster and safer.
--- 6 sets of High Speed Laser Cutting Machines which makes Production more efficient and qualified.
--- 2 Advanced Production Line which extends scaffolding products items and realizes fast delivery.
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
2. Q: What's your packing methods?
A: Packed in Steel Pallet (customed is accepted).
3. Q: What's your delivery time?
A: 20-25 days after received the advance payment .
4. Q: Are you manufacturer or trader?
A: We are a professional Scaffolding manufacturer Since WEIYE's inception in 1990.
5. Q: Where's your factory?
A: Our factory is in Rizhao city, Shandong Province, close to Qingdao Port
6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, will arrange the professional sales team to follow up.
7. Q: Can you supply other scaffolding Products?
A: Yes. All related construction materials.