3lpe Gas Water Pipe Three-Layer Polyethylene External Pipe Coating Production Line

Price $250000.00 Compare
Min Order 1 SET
Shipping From Shandong, China
Popularity 247 people viewed
Quantity
+-
 

Qingdao Huashida Machinery Co., Ltd.

VIP   Audited Supplier 14 years
Profile Certified by SGS/BV
HSD
Technical Service with Free,Training The Workers
12 Months
Coating Production Line
Powder Coating
Steel
CE, ISO, RoHS, REACH
New
HSD
Standard Package
3pe 2pe
Qingdao China
8468800000
Product Description

Product Description

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line

Description
3PE Anticorrosion coating processing line is to make 3-layer anti-corrosion coating for kinds of steel pipes.
3 layer coatings, first FBE coating, middle is adhesive layer, outside polyethylene layer.

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


3PE can strengthen the pipeline's mechanical properties, high electrical resistance, waterproof, wearable, anti-aging.
3PE coating/coated steel pipes are widely used in pipeline systems for the transmission of oil, gas, water and other fluids. They have highly resistance to corrosive from chemicals, moisture, harmful environment etc.
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


The line includes systems of steel pipe transportation, surface disposal, dust catching, pipe heating, electrostatic spraying, coating, water cooling, edge cutting, hydraulic and pneumatic device, detecting and electric controlling system. 




.
Technological processes
Upload pipespipes screw conveyorrust removal of intermediate frequency heatingEpoxy powder coatingouter layer soli quid & polyethylene coatingcooling spraypipes screw conveyorgrinding pipes, sendunload pipes

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line




Main Equipment of 3PE anticorrosion processing
Configuration List

No.NameSet
A. Derusting Equipment                                         
1Pipe-converying Equipment1
2Shot Blast Cleaning Machine1
3Cyclone Dust Collector1
4Pulse dust collector1
5Centrifugal exhaust fan1
6Rust removal equipment PLC1
B. Coating equipment
1Coating transfer equipment1
2IF heating device1
3Powder spraying device1
4 Automatic loading dryer2
5SJ-65/30 Extruder1
6SJ-180/30 Extruder1
7Hot melt adhesive extruder die1
8PE sheet extruder head mold1
9Hot melt adhesive/PE sheet coating device1
10Environmental Protection Ventilation equipment1
11Cooling Spray equipment1
C.Platform Equipment
1Steel pipe platform1
2Post-rust removal transition platform1
3Product tube storage platform1
4Hydraulic Equipment3
D.Groove Equipment
1PE Beveling Machine2
2Hydraulic Lifting and Turning Machinery1
3Hydraulic Equipment1
4PLC1
E.Compressed air Equipment
1Screw Air Compressor1
2Cold dry machine1
3Precision filters3
4Gas tanks1

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line




Question & Answer:
Q1. What is the range of pipe diameter the equipment can produce?
A: Diameter of steel Pipe: 48-219mm,219-1220mm,800-1600mm,1000-2400mm
Q2. What is the sand blasting grade?
A:SA2.5
Q3. What is your anti-corrosion coating standard?
A: It can meet  SY/T0413-2002 ,GB/T23257-2009, German DIN 30670 , DIN 30678 and  coating specification requirements from American Corrosion Association, and DNV . The product pipe fully complies with  SY/T0315-2005 ,CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and Canada, American Corrosion Association standards.
Q4. What is Delivery Time?
A: 2-3 months after deposit.
Q5. Production output 
A: It has different output capabilities as different pipe diameters, the Max. is 3 to 8 km/day, and the annual processing capacity is 2 million square meters (Φ508 mm).
Q6. Coating thickness: 
A: 80~800um
Q7. To which country did you sell your 3PE equipment?
A. We have produced nearly 50 sets of 3PE processing lines at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.
Q8. After-sales service: 
A:  Warranty period:
Before delivery, all the equipment must be trial-operated to confirm the quantity perfectly.
The warranty period is 12 months from the date of pick-up for the mechanical part and 6 months for the electrical part.
Service:
We provide technical services and provide training and guidance to buyer operators.

Our factory
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Our team
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Workshop

3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Delivery
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line


Exhibition
3PE Three-Layer Polyethylene Polypropylene External Pipe Coating Production Line



 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA