Scaffolding Props, Adjustable Steel Shoring Formwork Scaffold Prop, Light and Heavy Duty Adjustable Scaffolding Shoring

Price $8.90 Compare
Min Order 500 Pieces
Shipping From Jiangsu, China
Popularity 374 people viewed
Quantity
+-
 

Wuxi Metec Metal Co., Ltd.

VIP   Audited Supplier 14 years
Profile Certified by SGS/BV
scaffolding prop
Customer Service
Steel
Mobile
Multi-Pole Scaffolding
Combined Scaffolding
Projecting Scaffolding
Double Scaffolding
External Scaffolding
Horizontal mobile Scaffolding
Scaffolding Props
Building Scaffold
Painted, Electrogalvanized, HDG
Heavy Duty, Light Duty
Scaffolding and Formwork
1.6-4.0mm
Square/Flower/U-Type
40mm/48.3mm/56mm/60.3mm
METEC
Bundle
400-3900mm, 2000-3500mm, 3000-5500mm
Wuxi
73084000
Product Description
Adjustable steel prop is frequently used in formwork and construction to support the floors, ceilings, bridges and beams. With its high load-bearing capacity, it is popular on temporary supports during building repair or alteration work. The advantages are easy to use and time-effective to install, also lower cost. In construction, steel props is used as vertical support in scaffolding as below situation, such as: removing walls, making holes, temporary support for ceiling, beams and so on.
 
AdjustableOuter pipeinner pipeTheoretical 20 ft Container
 length(m)tube(mm)tube(mm)Weight(kgs)can load(pcs/bulk)
0.8-1.448×1.6×76540×1.8×8354.743500
1.6-3.048×1.6×160040×1.8×16007.572200
2.0-3.548×1.6×171040×1.8×20008.452000
2.2-4.048×1.6×200040×1.8×22009.321750
     
1.6-2.956×1.6×151048×1.8×16008.952200
1.8-3.156×1.6×151048×1.8×18009.362100
2.0-3.656×1.6×175048×1.8×200010.292000
2.2-4.056×1.6×201048×1.8×220011.261750
     
1.4-2.760×2.0×134048×2.0×14009.452300
2.0-3.560×2.0×154048×2.0×200011.382000
2.2-4.060×2.0×184048×2.0×220012.71750
3.0-5.560×2.0×254048×2.0×300016.511500(40ft/in bulk)

PACKAGING&DELIVERY
1. Package: Normally in bulk can be loaded 22-24tons in one 20ft container
2. In bundle: Normally 40-50PCS/bundle, the total loading quantity will be little less than in bulk.
3. Delivery: Normally 25-30days after your order confirmation, we can contact in detail.
We are specialized in producing steel scaffolding items for many years which has gained reputation domestically and internationally, with the main export destinations of Europe, America and Middle East. We are pleased to receive customers from all over the world. We can arrange car pickup or hotel booking whenever you want to visit our factory.
Any questions, please feel free to contact us.

 



Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA