

A cracking furnace tube is a crucial component in the petrochemical and related industries, especially in processes like steam cracking.
The main function of a cracking furnace tube is to provide a reaction environment for the thermal cracking of hydrocarbons. In steam cracking, for example, feedstocks such as naphtha, ethane, propane, or butane are heated to very high temperatures (usually in the range of 750 - 900 degrees Celsius or even higher in some cases) within these tubes. Under such extreme heat conditions and in the presence of steam (which helps with heat transfer and moderates coking), the large hydrocarbon molecules break down into smaller, more valuable unsaturated hydrocarbons like ethylene, propylene, and butadiene, which are key building blocks for the production of plastics, synthetic rubbers, and many other chemical products.

Product range:
Petrochemical
→ Cracking furnace
→ Reformer tube
→ Tube sheets
Steel Industry
→ Furnace roller
→ Radiant tube
→ DRI reformer tube
→ Combustion system/burner
Glass Industry
→ Lift-out roller
→ Lehr roller (Steel roller)
→ Metal donut rollers (Steel ring rollers)
→ Composite/resin ring roller
→ Tenmat Asbestos-free FF800 roller
Product parameters:
Working condition: 850-1050ºC(max1100ºCºC)
Outer diameter:50-200mm
(Pipe section) length: <6400mm
Inner wall finish: Ras3.2μm (internal control 1.óum)
Bayberry particle layer: ≤0.8mm

Less decoking
Longer furnace run times
Lower carburisation
Higher cracking efficiency
Lower energy consumption
Longer furnace lifetime





Q1. Are you a Manufacturer?
A: Yes, our factory is in Qingdao, Shandong province. We also have strong cooperating relationships with other manufacturers for other related products.
Q2. Can we visit your factory?
A: Sure, warmly welcome at any time. Seeing is believing.
Q3. Can you accept OEM or ODM?
A: Yes, customization is also welcome.
Q4. What's the MOQ of the trial order?
A: No limit. We can offer the best suggestions and solutions to meet your requirements.
Q5. What are your payment methods?
A: T/T, L/C, and other payment terms are also available for us.
Q6. How long is the delivery time?
A: Normally, it takes around 30-60 days. It also depends on the quantity of the order size.
Q7. How about your company's certification?
A: CE, ISO9001, and test report. We also could apply for other necessary certifications.
Q8. How can you control your quality?
A: For each production processing, we have a complete QC system to control the quality during production.