ZZPY
12 Months
Zhengzhuo
China
Product Description
The panel welding process is the bottleneck of membrane panel production, therefore we would commonly see 2 panel welders operating in the same production line. At the end of first welding pass, the flipping and transverse device will transfer the panel to the second panel welder to begin the back side welding.

Consist of

Consist of
- The base, made of steel and guide rail, fixed by expansion bolts
- The lifting part, powered by the air cylinder
The base | The lifting part | |
Size | 4000x500x300 | 300x1350x850 |
Weight | 200KG | 250KG |
Power | 4KW |