5-10 Tons Per Hour Small Scale Gold Ore Beneficiation Plant Complete Activated Carbon Leaching Cil/ CIP Gold Processing Plant

Price $12600.00 Compare
Min Order 1 Set
Shipping From Jiangxi, China
Popularity 363 people viewed
Quantity
+-
 

Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.

VIP   Audited Supplier 9 years
Profile Certified by SGS/BV
SJ4.0X4.5
Leaching Tank
7.5kw
Gold
AC Motor
Double Impeller
CE, ISO
Automatic
12 Months
Customized
New
Provide
7569kg
Engineers Available to Service Machinery Overseas
Jiangxi Hengchang
FCL
SJ4.0X4.5
Jiangxi, China (Mainland)
8474100000
Product Description
Afica Gold Mining Machine Cyanide Equipment Gold Cil Processing Plant Double Impeller CIL Leaching Tank

1.Intruduction of Gold Leaching CIL processing Plant:
Gold CIL leaching process is an efficient method for extracting and recovering gold from rock gold and gold tailings. By adding activated carbon to the slurry and simultaneously leaching and adsorbing gold, it include leaching pulp preparation, cyanide leaching, activated carbon adsorption, the electric shock to get gold mud, to take off the gold charcoal recirculation, leaching slurry processing etc. other operation stage. It is a good choice for gold beneficiation plant.
 
2.Work principle of Leaching Tank:

A. Crushing and grinding system

Raw gold ores→Vibrating feeder→Primary crusher→Secondary crusher→Vibrating screen→Ball mill→Spiral classifier→Gravity separation→Ball mill→Hydrocyclone group→Thickener

B. Leaching and adsorption system

The thickened materials will enter into 8 sets of double impeller leaching tank; well-mixed sodium cyanide agents are added to the first tank; active carbon is added to the tanks from the second to the eighth; active carbon from the second agitator is lifted to carbon screen to get gold-loaded carbon, and after cleaning, the gold-loaded carbon enters into the desorption and electrolysis system. The slurry left goes back to the second tank; active carbon is lifted by air lifter from the tank next to the tank before against the current; the tailing goes through safety screen to recycle fine-size gold-loaded carbon, and then goes to tail water treatment stage.

C. Tailings and wastewater treatment

The tailings and wastewater are lifted to the filter to process, and the tailings also named filter cake are transported to the yard, while filter liquor go to circulating water tank for recycling.

D. Desorption electrolysis and smelting system

Desorption electrolysis system implements high-temperature desorption electrolysis on gold in the gold-loaded carbon through the mixed liquor of sodium cyanide and sodium hydroxide. After wood chips and other sundries are removed by washing machine, and the gold desorption is carried out by high-temperature and high-pressure desorption method (150 degrees and 0.5Mpa), which can resolve 99% of gold within 2-6 hours. After getting the gold mud from desorption electrolysis system, the gold mud will go to gold melting furnace and turns to the gold bar.


3. Structure of Leaching Tank:


4.Main Technical of Leaching Tank:
Model
Tank Spec.
(mm)
 Effective Volume
(m3)
Impeller revolution
(r/min)
Motor power
(kw)
Weight
(kg)
SJ2.0X2.5
2000X2500
7.07
52
2.2
2144
SJ2.5X2.5
2500X2500
10.8
43
4
2729
SJ2.5X3.15
2500X3150
13.92
52
2.2
3095
SJ3.0X3.0
3000X3000
19
43
4
4583
SJ3X3.15
3000X3150
20
43
4
4160.6
SJ3X3.5
3000X3500
22.97
43
4
4334.6
SJ3.15X3.55
3150X3550
25.73
43
4
4322.8
SJ3.5X3.5
3500X3500
31.3
52
5.5
5025
SJ3.5X4
3500X4000
35.6
52
5.5
5429
SJ3.55X4.0
3550X4000
36.8
43
4
5025
SJ3.7X4.2
3700X4200
42
42
4
6153
SJ4.0X4.5
4000 X4500
52.78
35
7.5
7569
SJ4.0X6
4000 X6000
71
33
11
9200
SJ4.5X5.0
4500 X5000
74.75
35
7.5
10864
SJ5.0X5.6
5000X5600
104.5
31
11
14291
SJ5.5X6.0
5500X6000
135.42
31
11
18745
SJ6.5X7.0
6500X7000
215
21
22
25978
SJ7.0X7.5
7000 X7500
269
21
22
29030
SJ7.5X8.0
7500 X8000
331
23
22
32796
SJ8.0X8.5
8000X8500
402
18.5
30
42467.3
SJ8.5X9.0
8500X9000
480
18.5
30
46623

5.Features of Leaching Tank:
1. It lowers the gold processing plant operation cost.
2. It increases gold recovery rate to a degree of 99%.
3. It is suitable for the treatment of oxidized gold ore with low sulfur content and mud content.
4. It ensures the gold and silver dissolution and the adsorption of activated carbon synchronously.


6.Leaching tank of working site:

7.Packing & Delivery:


8.About our factory:
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd. is located in No.3 Chuangye Road. Guzhang In dustrial Park. Shicheng County. Ganzhou City. Jiangxi Province. China.Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table. Flotation equipment. Crushing equipment. Magnetic separator. Screening equipment. Classifying equipment. Agitation tank, Feeding equipment. Gravity separation equipment. Wet separation equipment. Spiral chute. Saw-tooth wave jig and Diaphragm Jig. Grinding equipment. Ball mill. Slurry pump. Centrifugal pump, Conveying equipment.

We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten,lead. zinc. tin. molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile,diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal,precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil. India. Indonesia.South Africa. Somalia, Philippines. Malaysia. Sudan, Nigeria. Iran, Russia, Ghana. Kazakhstan Kyrgyzstan.Cambodia,Vietnam,Korea,Mongolia and other countries.





9.Our service:

 1.Pre-sale services:
  (1)Select equipment model;
  (2) Design and manufactLire products according to clients' special requirement;
  (3)Train technical personnel for dients.

2.Services during the sale:
(1) Pre-check and accept products ahead of delivery;
(2)help clients to draft solving plans.

3. After-sale services:
(1) Assist dients to prepare for the first construction scheme;
(2)Install and debug the equipment;
(3) Train the first-line operators on site;
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA