50/100/150/200/300ton/Hour Bucket Chain Dredger for Alluvial Gold/Diamond Dredging/Mining Sand/Soil From River/Lake with Trommel/Jigger/Shaking Table/Sluice Box

Price $750000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 429 people viewed
Quantity
+-
 

Weifang Shenghe Environmental Protection Machinery Manufacturing Co., Ltd

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
BCM-1
Bucket Chain River Mining Dredger
380V
>10T
Carbon Steel
Corrosion Resistance
ISO9001:2008, ISO9001:2000, CE
Energy Saving
2 Years
Multi Color
Customized
New
Long Time
Gold . Daimond . Tin . Iron Powder
Generator Sets
SHENG HE
Container
10-400t/h
Qingzhou City Shandong Province China
8905100000
Product Description
Diesel Engine Pontoon Type Bucket Chain Dredger For Alluvial Gold/Diamond Dredging/Mining Sand/Soil
From River/Lake With Trommel/Jigger/Shaking table/Sluice box

 
1. Chain bucket mining dredger overview:
 
Bucket chain mining dredger is suitable for the gold.diamond .tin so on .it adpots the marine steel plate to made the box instructure to convinence for assemble and disassemble .according to the different mining material to choose the different extraction equipment . such as gold agitation chute with fix gold carpet . jigger equipment . centrifuge equipment and magnetic seperator so on . so far , this bucket chain river mining dredger is the best way for the mining . it is welcomed by the all parts of the world 

2.  Bucket chain river mining dredger basic component:




3. River mining dredger advantage :
Bucket Chain Gold Dredger is advanced mining joint equipment. It has many advantages, such as, advanced technology, reasonable structure, reliable performance and easy to operation and maintain and so on. As the result of many years test, that's proving: Using this series gold dredger has advantages of high degree of mechanization, large output, less investment and more profit.

4. Working principle :

The dredger is used for dredging sand and gold mining in river. It dredges sand in the river bottom by digging bucket, transported to the trommel for screening, big stone is drain away, fine gold placer is transported to gold chute that distributed in both side of the hull gold mining.
The future of gold dredger: Set dredging, screening, mining, and tailing carriage as a whole, easy operation, low power consumption, low maintenance, suitable for a variety of river environmental gold mining operations, the recovery rate is high for gold particles.

 

5. Bucket chain river mining dredger pictures:
6. Basic parameter :

Model

SH-150

SH-200

SH-300

Parameters

Capacity

150tph

200 tph

300 tph

Power

150 kw

200 kw

300kw

Bucket size/ cubic

0.04

0.04

0.12

Clay Scrubber /mm

φ1000*2000

φ1200*3000

φ1500*3000

Trommel Screen /mm

φ1200*3000

φ1500*3500

φ1800*4000

Sluice Box

2 sets

3 sets

4 sets

Water Supply /m³

120 m³

240 m³

370 m³

Concentrators

1

2

4

Recovery Rate

98%

98%

98%


7. Shenghe Service :
1professional technology team for the reasonable and science desgin 
2provide the proferssion engineer to aborad for guiding installation 
3offer visa for customers to come to our factory .
4long warranty and long time after sales service 

8. Extraction machinery :
agitation chute : this machinery is for gold . it normally combins with fixed gold carpet to improve the extraction rate 
Centrifuge : it is for gold and diamond . it particular for the diamond 

9.Questions for customer answer :
1How many meter is maximum digging depth ?
2How many cubic meter is processing capacity ?
 
3River mining dredger for gold . diamond or others ?
 

10. FAQ:
1 What's your main product?Cutter suction dredger . aquotatic plant harvester . bucket chain river minging dredger . land mining equipment . working service boat so on 
2Are you factory or trading company?We are direct factory,support customer visit and video talk to check factory.
3How will you guarantee the quality?1 year guarantee for the main accessorises,and we support 24hrs*365 days online         service for technical guidance.
4How long is time of production? Smalle type normally around 15 days,larger type 30-60 days will garantee the quality first,and try best speed.

11.SHENGHE FACTOR SHOW AND CERTIFICATION :
 
        Shenghe Environmental and dredging mining factory is found more than 15 days . we have dependence reserching development team . foreign service team and installation team . we have more than 50 workers . our factory has 100000 square meter and advanced manufactuer equipment . our mining equipment is sold more than 40 countries


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA