500L 1000L 1500L Stainless Steel Three Vessel Semiauto Brewing System for Restaurant

Price $20000.00 Compare
Min Order 1 Set
Shipping From Shandong, China
Popularity 214 people viewed
Quantity
+-
 

Shandong Meto Intelligent Equipment Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
300L-2000L
5 Years
3 Years for Tank
Natural Ingredients, Water Malt Yeast Hops
Beer
Customized
CE, ISO9001
Steam , Electric , Fire
Semi-Automatic
New
220V, 380V
Full Stainless Steel SUS304
Arc Argon Protection
Restaurant Electric Heating 300L Beer Brewing Equi
Offer Auto CAD and 3D Design Drawing
Inner Wallet 3mm Outer Wallet 2mm
Steam Jacket , Electric Tube, Direct Fire
Double Wallet with Dimple Cooling Jacket
Chiller with Glycol Tank
Temp. Controller, HMI , PLC or Touching Screen
Polyurethane Foam
0.4-0.6um
Brushed , Mirror , Pickled SUS304 or Copper
METO
Plywood Case by LCL or Container by FCL
Customized
Jinan, China
8438400000
Product Description
 

1. Introduction of Hotel / Barbecue / Restaurant / Ginshop Beer Brewing Equipment

300L/500L/1000L/2000L beer brewery equipment is a good choice for ginshop, barbecue, restaurant who brew beer for customer at scene.
Small floor coverage makes it possible to show constomers the whole process of beer brewing.
The luxury and sanitary process comforts the constomers and give them impressed experience.



2. Configuration list of 300L Beer brewery equipment
300L brewery equipment
SystemComponentsCapacity Specification 
Grinding SystemMiller 100-150KG/HDouble Roller,Noise<60db
Heating SystemBoiler50KG/HElectric,Gas with CE certification
Brewhouse System Mash/Lauter tun300LMaterial: SUS304/Red copper
Interior thickness:3-4mm
Exterior thickness:2-3mm
Insulation: Polyurethane thickness: 80mm
Brew Kettle/
Whirlpool Tank
300L
Hot Water Tank 500L
plate exchanger3M2SUS304
Yeast adding tank3LSUS304
Wort Pump Food grade centrifugal pump.
 
Working platform SUS304
Fermenter SystemFermentation Tank 300L/600LTop manway/Side manway
Drying hop port
Double wallet with dimple cooling jacket
Carbonation port to fill CO2
Cooling System Glycol Water tank 800LWith PU level indicator
Chiller 3HP 
Pump  
Cleaning System Disinfection Tank50LSUS304
Alkali Tank50L
Pump 
Control System Control Cabinet PID/PLC/HMIManual/Semi-automatic/Automatic
Optional Auger System
Grain Case
Customized 
 

Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

FAQ
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the operator.  It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. 
should
be installed separately. If needed, cost calculate additionally.

6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA