1MW 1MW 3MW 4MW 5MW 6MW 7MW 10MW Hfo Heavy Fuel Oil Hfo Generator Set Power Plant with Lloyd Register Lrqa of Cssc / Man

Price $150000.00 Compare
Min Order 1 Piece
Shipping From Fujian, China
Popularity 427 people viewed
Quantity
+-
 

Kanpor Electrical Machinery Co., Ltd.

VIP   Audited Supplier 9 years
Profile Certified by SGS/BV
KPH
Basic Diesel Generator
Fixed
Four Stroke
Water Cooling
AC Three Phase
Speed
Land Use
Common Units, Standby Unit, Emergency Crew
Low Noise Automation Type
AC Rotating Exciter
Ce ISO SGS Soncap TUV
380V/220V 400V/230V 415V/240V 480V/277V
50Hz/60Hz
220V/127V 230V/132V
Kanpor
Plywood&Plastic with Foam
diesel engine W/C alterantor with controller
Original of China
8502110000
Product Description


1MW 1MW 3MW 4MW 5MW 6MW 7MW 10MW HFO HEAVY FUEL OIL HFO GENERATOR SET Power Plant WITH Lloyd register LRQA of CSSC / MAN

/No./Item/Q'ty/specification/Scope
CMP Customer
1./Genset  
  1.1diesel engine3CMP-MAN 7L27/38  
   One (1) set of diesel engine including following items
1.1.1/Turbocharger1/ With air inlet bend  
1.1.2/Charger Air Cooler1Fin and tube type  
1.1.3/Governor1   
1.1.4/Flywheel1   
1.1.5/ Common base1   
1.1.6/ Turning device1/manual operating  
1.1.7/ Starter1/Pneumatic  
1.1.8/Lub. oil cooler1/Plate type  
1.1.9/Duplex filter1   
1.1.10/centrifugal  by-pass filter1   
1.1.11/ pump for Lub.oil1/Engine driven  
1.1.12/Pre-lub. oil pump1/electrical pump  
1.1.13/Lub. oil  thermostatic valve1set/wax type  
1.1.14/HT water pump1/Engine driven  
1.1.15/ HT thermostatic valve1set/wax type  
1.1.16/Fuel oil leakage alarm1   
1.1.17/duplex safety filter for fuel1   
1.1.18/Resilient mountiung /selected according to alculation  
1.1.19/flexible hoses  for engine all connection1lot   
1.1.20Service platform1   
  1.2 /Generator
1.2/Generator3:2217.6kW/rating output from generator terminal is 2217.6kW
,
  
  - /Capacity  2772kVA  / 750 rpm at ISO condition  
  - /No. of phase and wire 3 phase / 4 wire / PF 0.8  
  - /Voltage and frequency  11V / 50 Hz  
   - Insulation Class/Temp.Rise  F/F  
   - /IP Class IP23  
   - /Electric system parts /Maker's standard   
 / One(1) set of Generator including following items ;  
1.2.1/AVR    
1.2.2/ Space heater    
1.2.3/Bearing sensor    
1.2.4/Winding sensor    
 
2. fuel oil system
2.1/ HFO treatment process unit1xxxcSt/50ºC/design according toxxxcSt/50ºC HFO  
   One (1) set of HFO treatment process unit including following items    
2.1.1/HFO purifier unit1+1,1500L/h /one use and the other reserve,effective separating amount approx850L/h  
      
2.2/Diesel oil supply process unit1   
   One (1) set of Diesel oil supply process unit including following items    
2.2.1/Do supply pump1+1,2.5m3/h/one use and the other reserve,rate of flow is approx2.5m3/h  
2.2.2/press. regulatuiong valve1   
2.2.3/press. regulatuiong valve1   
2.2.4/ DO cooler115kW/approx 15kW  
      
2.3/HFO supply unit1xxxcSt/50ºC/design according toxxxcSt/50ºC HFO  
   One (1) set of Diesel oil supply process unit including following items  
2.3.1/HFO supply pump1+1,1.2m3/h/one use and the other reserve,rate of flow is approx 1.2m3/h  
2.3.2/filter1   
2.3.3/junction box1   
2.3.4, base frame, support and pipe1lot   
      
2.4/HFO booster unit1xxxcSt/50ºC/design according toxxxcSt/50ºC HFO  
   One (1) set of Diesel oil supply process unit including following items  
2.4.1/auto back flushing filter1   
2.4.2/return oil tank witth deaerating valve1   
2.4.3/recycling  oil pump1+1,3.5m3/h/one use and the other reserve,rate of flow is approx 3.5m3/h  
2.4.4/heater 1   
2.4.5/viscosity control unit1   
2.4.6/change-over valve for HFO /DO1   
2.4.7,,,/pipe, supprort,flange and base frame1   
2.4.8/ cooler1   
2.4.9/press. regulatuiong valve 1   
      
2.5/ fuel oil discharging process  
2.5.1/leakage fuel oil collecting tank3100L/approx 100L  
2.5.2/fuel oil drain pump3/pneumatic dredge pump  
 
3. Lubricating oil system
3.1/Lubricating oil treatment  process  
3.1.1/ Lub. oil separator unit3,760L/h/ steam heater,effective separating amount approx 230L/h  
3.2/lube pump system1   
4. Cooling water system
4.1()  Engine cooling water system(one-string system)  
4.1.1/Expansion tank11.5m3/approx 1.5m3  
4.1.2/LT water pump3/electrical driven  
4.1.3/air radiator3   
4.1.4/ Preheater Unit1   
      
4.2/Cooling water supply system  
4.2.1/Water treatment unit1   
4.2.2/Water tank and perssurised system1   
 
5. Compressed air system
5.1/air compressor1   
 / One(1) set of air compressor unit including following items ;  
5.1.1/air conpressor211/air conpressor one use and the other reserve  
5.1.2/  comperssed air vessel2,1.5m3/one use and the other reserve approx 1.5m3  
5.1.3/Reduce pressure unit130bar8bar    
5.1.4/air dryer1   
6. , Intake and exhaust gas system
6.1/Intake air system    
6.1.1/Intake air filter 3   
6.1.2/Intake air silencer3   
6.1.3/expansion joint forT/C inlet3   
      
6.2/Exhaust gas system    
6.2.1/exhaust gas silencer3   
6.2.2/Expansion joint for T/C outlet3   
6.2.3/Expansion joint for exhaust gas silencer in/out3   
6.2.4/Exhaust gas stack    
      
6.3/exhaust gas boiler system    
6.3.1/Exhaust gas boiler3set   
6.3.2/Hot well tank1   
6.3.3/Temp. control valve for Hot well tank1   
6.3.4/condensator radiator1   
6.3.5/steam distribution head1   
6.3.6/Blow down tank1   
6.3.7/feed water pump unit1set2,/every set include two pumps,one use and the other reserve  
6.3.8/chemical dosing unit1   
7. Sludge oil treatment system
7.1/waste oil discharge pump1+1   
7.2/engine room pit pump1+1   
7.3/pump room pit pump1+1   
8. Tank farm
8.1/tanks    
8.1.1/HFO storage tank1700M3  
8.1.2/ heater for HFO outlet the tank1   
8.1.3 1100m3  
8.1.4/HFO service tank1100m3  
8.1.5/DO storage tank1100m3  
8.1.6/DO service tank1100m3  
8.1.7/New lub. oil storage tank1100m3  
8.1.8/Used lub. oil storage tank150m3  
8.1.9/Oily Water Pond1   
8.1.10/sludge tank150m3  
8.2/Raw water supply system  
9. Electrical System
9.1/Engine control cabinet3   
9.2/outgoing cabinet1   
9.3/insulate cabinet1   
9.4/auxiliaries equipment cabinet3   
9.5/Common auxiliaries equipment cabinet1   
9.6/transform incoming cabinet 1   
9.7/transform outgoing cabinet 1   
9.8/plant transform1   
9.9/PT cabinet1   
9.10/Black start genset1   
9.11/Black start engine cabinet1   
9.12/central control1   
9.14/DC system1   
10. Spare parts
10.1/Engine spare parts    
10.1.1/Standard spare parts for engine1set/plant   
10.1.2/commissioning spare parts for engine1set/plant   
10.2/Plant spare parts    
10.2.1/spare parts for generator1set/plant   
10.2.2/spare parts for auxiliaries1set/plant   
10.3/engine tools    
10.3.1/Standard tools for engine1set/plant   
10.4/plant tools    
10.4.1/tools for mechnical equipment1set/plant   
10.4.2/tools for electrical  panel1set/plant   
11. , piping and electrical  material & work
11.1/Material    
11.1.1/Materials for civil and foundation items    
11.1.2/Materials for mechnical items    
11.1.3/Materials for electrical items    
11.2/ guide installation work    
11.2.1/installation/erection works for mechnical items    
11.2.2/installation/erection waorks for electrical items    
12. , civil & building material & work
12.1/civil work    
12.1.1/site survey    
12.1.2/site grading and leveling    
12.1.3/Temporary faclity    
12.1.4/road and paving    
12.1.5/foundation and structure    
12.1.6,/Drainage and sewage work    
12.1.7/fence and gate    
12.2/building work    
12.2.1/power house(engine hall)     
12.2.2/power house (control room)    
12.2.3/workhouse and warehouse    
12.2.4/pump house    
12.2.5/Administration bulilding    
12.2.6/ guard house    
12.3/building service    
12.3.1/sanitary system    
12.3.2/overhead crane for power house    
12.3.3/chain block hoist for pump house    
12.4/fire detection and fighting system    
13. /first filling and consumables
13.1/first filling of system    
13.1.1/lube oil for genset    
13.1.2/lube oil for black starter    
13.1.3/chemicals for cooling and boiler water treatment    
13.2/consumables for commissioning    
13.2.1/Fuel    
13.2.2/lube oil for genset    
14. /engineering
14.1/system engineering    
14.1.1/system engineering    
14.2/mechnical engineering    
14.2.1/equipment layout drawing in&out door    
14.2.2/piping arrangement drawing    
14.3/electrical engineering    
14.3.1/electrical engineering for diesel power plant    
14.3.2/power and electrical protect coordination engineering    
14.4/civil engineering    
15. /site activities
15.1/supervision    
15.1.1/civil engineer for civil work    
15.1.2/mech. engineer for installation    
15.1.3/elec. Engineer for installation    
15.2/commissioning    
15.2.1()/mech. Engineer for commissioning    
15.2.2()/elec. Engineer for commissioning    
15.2.3(PLC)/PLC engineer for commissioning    
15.2.4()/Auxiliaries mech. Engineer for commissioning    
15.2.5()/Auxiliaries elec. Engineer for commissioning    
15.3Extra required supervision, commissioning service by purchaser    
16. /factory test and training service
16.1/shop test    
16.1.1/engine and generator test at factory    
16.1.2()3   
16.2/training    
16.2.1/training at site    
17. /transportation
17.1/packing of equipment for transportation    
17.1.1/packing of engine and aux.equipment    
17.2/transportation of equipment    
17.2.1/domestic transportation    
17.2.2/ transportation to local port    
17.2.3/local transportation to site    
/No./Item/Q'ty/specification/Scope
CMP Customer
1./Genset  
  1.1diesel engine3CMP-MAN 7L27/38  
   One (1) set of diesel engine including following items
1.1.1/Turbocharger1/ With air inlet bend  
1.1.2/Charger Air Cooler1Fin and tube type  
1.1.3/Governor1   
1.1.4/Flywheel1   
1.1.5/ Common base1   
1.1.6/ Turning device1/manual operating  
1.1.7/ Starter1/Pneumatic  
1.1.8/Lub. oil cooler1/Plate type  
1.1.9/Duplex filter1   
1.1.10/centrifugal  by-pass filter1   
1.1.11/ pump for Lub.oil1/Engine driven  
1.1.12/Pre-lub. oil pump1/electrical pump  
1.1.13/Lub. oil  thermostatic valve1set/wax type  
1.1.14/HT water pump1/Engine driven  
1.1.15/ HT thermostatic valve1set/wax type  
1.1.16/Fuel oil leakage alarm1   
1.1.17/duplex safety filter for fuel1   
1.1.18/Resilient mountiung /selected according to alculation  
1.1.19/flexible hoses  for engine all connection1lot   
1.1.20Service platform1   
  1.2 /Generator
1.2/Generator3:2217.6kW/rating output from generator terminal is 2217.6kW
,
  
  - /Capacity  2772kVA  / 750 rpm at ISO condition  
  - /No. of phase and wire 3 phase / 4 wire / PF 0.8  
  - /Voltage and frequency  11V / 50 Hz  
   - Insulation Class/Temp.Rise  F/F  
   - /IP Class IP23  
   - /Electric system parts /Maker's standard   
 / One(1) set of Generator including following items ;  
1.2.1/AVR    
1.2.2/ Space heater    
1.2.3/Bearing sensor    
1.2.4/Winding sensor    
 
2. fuel oil system
2.1/ HFO treatment process unit1xxxcSt/50ºC/design according toxxxcSt/50ºC HFO  
   One (1) set of HFO treatment process unit including following items    
2.1.1/HFO purifier unit1+1,1500L/h /one use and the other reserve,effective separating amount approx850L/h  
      
2.2/Diesel oil supply process unit1   
   One (1) set of Diesel oil supply process unit including following items    
2.2.1/Do supply pump1+1,2.5m3/h/one use and the other reserve,rate of flow is approx2.5m3/h  
2.2.2/press. regulatuiong valve1   
2.2.3/press. regulatuiong valve1   
2.2.4/ DO cooler115kW/approx 15kW  
      
2.3/HFO supply unit1xxxcSt/50ºC/design according toxxxcSt/50ºC HFO  
   One (1) set of Diesel oil supply process unit including following items  
2.3.1/HFO supply pump1+1,1.2m3/h/one use and the other reserve,rate of flow is approx 1.2m3/h  
2.3.2/filter1   
2.3.3/junction box1   
2.3.4, base frame, support and pipe1lot   
      
2.4/HFO booster unit1xxxcSt/50ºC/design according toxxxcSt/50ºC HFO  
   One (1) set of Diesel oil supply process unit including following items  
2.4.1/auto back flushing filter1   
2.4.2/return oil tank witth deaerating valve1   
2.4.3/recycling  oil pump1+1,3.5m3/h/one use and the other reserve,rate of flow is approx 3.5m3/h  
2.4.4/heater 1   
2.4.5/viscosity control unit1   
2.4.6/change-over valve for HFO /DO1   
2.4.7,,,/pipe, supprort,flange and base frame1   
2.4.8/ cooler1   
2.4.9/press. regulatuiong valve 1   
      
2.5/ fuel oil discharging process  
2.5.1/leakage fuel oil collecting tank3100L/approx 100L  
2.5.2/fuel oil drain pump3/pneumatic dredge pump  
 
3. Lubricating oil system
3.1/Lubricating oil treatment  process  
3.1.1/ Lub. oil separator unit3,760L/h/ steam heater,effective separating amount approx 230L/h  
3.2/lube pump system1   
4. Cooling water system
4.1()  Engine cooling water system(one-string system)  
4.1.1/Expansion tank11.5m3/approx 1.5m3  
4.1.2/LT water pump3/electrical driven  
4.1.3/air radiator3   
4.1.4/ Preheater Unit1   
      
4.2/Cooling water supply system  
4.2.1/Water treatment unit1   
4.2.2/Water tank and perssurised system1   
 
5. Compressed air system
5.1/air compressor1   
 / One(1) set of air compressor unit including following items ;  
5.1.1/air conpressor211/air conpressor one use and the other reserve  
5.1.2/  comperssed air vessel2,1.5m3/one use and the other reserve approx 1.5m3  
5.1.3/Reduce pressure unit130bar8bar    
5.1.4/air dryer1   
6. , Intake and exhaust gas system
6.1/Intake air system    
6.1.1/Intake air filter 3   
6.1.2/Intake air silencer3   
6.1.3/expansion joint forT/C inlet3   
      
6.2/Exhaust gas system    
6.2.1/exhaust gas silencer3   
6.2.2/Expansion joint for T/C outlet3   
6.2.3/Expansion joint for exhaust gas silencer in/out3   
6.2.4/Exhaust gas stack    
      
6.3/exhaust gas boiler system    
6.3.1/Exhaust gas boiler3set   
6.3.2/Hot well tank1   
6.3.3/Temp. control valve for Hot well tank1   
6.3.4/condensator radiator1   
6.3.5/steam distribution head1   
6.3.6/Blow down tank1   
6.3.7/feed water pump unit1set2,/every set include two pumps,one use and the other reserve  
6.3.8/chemical dosing unit1   
7. Sludge oil treatment system
7.1/waste oil discharge pump1+1   
7.2/engine room pit pump1+1   
7.3/pump room pit pump1+1   
8. Tank farm
8.1/tanks    
8.1.1/HFO storage tank1700M3  
8.1.2/ heater for HFO outlet the tank1   
8.1.3 1100m3  
8.1.4/HFO service tank1100m3  
8.1.5/DO storage tank1100m3  
8.1.6/DO service tank1100m3  
8.1.7/New lub. oil storage tank1100m3  
8.1.8/Used lub. oil storage tank150m3  
8.1.9/Oily Water Pond1   
8.1.10/sludge tank150m3  
8.2/Raw water supply system  
9. Electrical System
9.1/Engine control cabinet3   
9.2/outgoing cabinet1   
9.3/insulate cabinet1   
9.4/auxiliaries equipment cabinet3   
9.5/Common auxiliaries equipment cabinet1   
9.6/transform incoming cabinet 1   
9.7/transform outgoing cabinet 1   
9.8/plant transform1   
9.9/PT cabinet1   
9.10/Black start genset1   
9.11/Black start engine cabinet1   
9.12/central control1   
9.14/DC system1   
10. Spare parts
10.1/Engine spare parts    
10.1.1/Standard spare parts for engine1set/plant   
10.1.2/commissioning spare parts for engine1set/plant   
10.2/Plant spare parts    
10.2.1/spare parts for generator1set/plant   
10.2.2/spare parts for auxiliaries1set/plant   
10.3/engine tools    
10.3.1/Standard tools for engine1set/plant   
10.4/plant tools    
10.4.1/tools for mechnical equipment1set/plant   
10.4.2/tools for electrical  panel1set/plant   
11. , piping and electrical  material & work
11.1/Material    
11.1.1/Materials for civil and foundation items    
11.1.2/Materials for mechnical items    
11.1.3/Materials for electrical items    
11.2/ guide installation work    
11.2.1/installation/erection works for mechnical items    
11.2.2/installation/erection waorks for electrical items    
12. , civil & building material & work
12.1/civil work    
12.1.1/site survey    
12.1.2/site grading and leveling    
12.1.3/Temporary faclity    
12.1.4/road and paving    
12.1.5/foundation and structure    
12.1.6,/Drainage and sewage work    
12.1.7/fence and gate    
12.2/building work    
12.2.1/power house(engine hall)     
12.2.2/power house (control room)    
12.2.3/workhouse and warehouse    
12.2.4/pump house    
12.2.5/Administration bulilding    
12.2.6/ guard house    
12.3/building service    
12.3.1/sanitary system    
12.3.2/overhead crane for power house    
12.3.3/chain block hoist for pump house    
12.4/fire detection and fighting system    
13. /first filling and consumables
13.1/first filling of system    
13.1.1/lube oil for genset    
13.1.2/lube oil for black starter    
13.1.3/chemicals for cooling and boiler water treatment    
13.2/consumables for commissioning    
13.2.1/Fuel    
13.2.2/lube oil for genset    
14. /engineering
14.1/system engineering    
14.1.1/system engineering    
14.2/mechnical engineering    
14.2.1/equipment layout drawing in&out door    
14.2.2/piping arrangement drawing    
14.3/electrical engineering    
14.3.1/electrical engineering for diesel power plant    
14.3.2/power and electrical protect coordination engineering    
14.4/civil engineering    
15. /site activities
15.1/supervision    
15.1.1/civil engineer for civil work    
15.1.2/mech. engineer for installation    
15.1.3/elec. Engineer for installation    
15.2/commissioning    
15.2.1()/mech. Engineer for commissioning    
15.2.2()/elec. Engineer for commissioning    
15.2.3(PLC)/PLC engineer for commissioning    
15.2.4()/Auxiliaries mech. Engineer for commissioning    
15.2.5()/Auxiliaries elec. Engineer for commissioning    
15.3Extra required supervision, commissioning service by purchaser    
16. /factory test and training service
16.1/shop test    
16.1.1/engine and generator test at factory    
16.1.2()3   
16.2/training    
16.2.1/training at site    
17. /transportation
17.1/packing of equipment for transportation    
17.1.1/packing of engine and aux.equipment    
17.2/transportation of equipment    
17.2.1/domestic transportation    
17.2.2/ transportation to local port    
17.2.3/local transportation to site   
 





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA