Fully Automatic Square Bottom Paper Bag Making Machine with Twisted Handle Inline

Price $80000.00 Compare
Min Order 1 set
Shipping From Zhejiang, China
Popularity 278 people viewed
Quantity
+-
 

Wenzhou Yibo Machinery Co., Ltd

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
YB
Online
One Year
Bag Forming Machine
Shopping Bag
Automatic Glue
Computerized
High
80-540mm
4100×1900×1600
20-100
4200
Paper
Shopping Bag, Bread Bags, Fruit Bag
270-530mm
225-470mm
60-150mm
60-160G/M2
30-160PCS/Min
3phase, 380V, 12kw
YIBO
Film Wooden Box
220-540mm
China
8441200000
Product Description

Product Parameters

Properties and uses:

    Machine use roller paper, from primary color paper or printed web paper to square bottom paper bag one times production.The machine can be used in various paper bags with high speed and efficiency. It is an ideal equipment for paper bag production.
This machine is composed of roll unwinding (hydraulic feeding, automatic web guide, constant tension), side gluing, printing electric eye tracking, base paper into cylinder, fixed-length traction cutting, bag bottom indentation opening, bag bottom gluing, bag bottom molding, bag sending etc.The whole machine is controlled centrally by PLC touch screen and servo motor controls the length of paper bag.
It can pretend 2 color  printing group, bag surface window lamination device and handgrip hole device according to your need.
 ModelYB-330 
Paper Roll Length270-530mm(C)
Paper bag length225-470mm (L)
Paper bag width150-330mm (W)
Paper bag bottom width60-150mm (H)
Paper thickness60-160g/m2
Machine Speed30-160pcs/min
Paper roll width450-1050mm
Roll paper diameter1200mm
Diameter of paper core76mm(3")
Machine power3phase,380v ,12kw
Machine weight8000kg
Machine size10500x3700x1900mm

Detailed Photos

Certifications

 

Packaging & Shipping

Client

FAQ

--How to install the equipment?
--Due the corona breakout in global, the seller would not arrange engineer outside to install, all the service would change to online service.

--If the corona finished,how to install? And how long it will last?
--The seller will send 1 engineer to install, test the machine and train customers' workers in buyers' factory.It will take about 1 week for the entire installation and training.

--What are the additional costs of installation?

--The buyer should cover engineers' salary, visa cost, Round air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.

--What are the product warranty service terms?
--Warranty period for the delivered equipment will be 12month after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.


Welcome to contact us if you like our machine. thank you ! 

 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA