50L-200L
5 Years
3 Years
Water,Malt,Hops,Yeast
Beer
Customized
CE, ISO9001
Electric
Semi-Automatic
SUS304 Stainless Steel
Dimple Plate Jacket
PLC/Himi/Touch Screen
Inner:3-4mm, Exteior:2mm
220V/380V/Adjustable
300L
Depending on Capacity
Depending on Capacity
Bothe Sides TIG Welding
METO
Plastic Film, Plywood Case; Container;
User Requirements
Shandong, China
84384000
Product Description
50L 100L 200L Craft Beer Making Machine Micro Brewery Equipment For Sale

2 Vessel Brewhouse | 3 Vessel Brewhouse |
Mash/Lauter tun+Brew kettle/whirlpool tank | 1.Lauter&storage tank+brew kettle/whirlpool tank 2.Lauter&whirlpool tank ,+brew kettle 3.Lauter&HLT +brewkettle/whirlpool tank |
Combined 3 Vessel Brewhouse | 4 Vessel Brewhouse |
1.Mash/lauter tun+ brew kettle +whirlpool tank 2.Mash tun+ lauter tank + brewkettle/whirlpool tank | Mash tun +lauter tank + brew kettle+whirlpool tank |

UNit | Components | Capacity | Specification |
Malt mill | Miller | 100KG/H | Double Roller,Noise<60db |
Brewhouse | Mash/Lauter tun | 300L | Mashing Process:Decoction.Infusion.Multi-step infusion |
Brew Kettle/Whirlpool Tank | 300L | Heating source:Steam,Electric,direct fire SUS304/Red copper | |
Fermentation tank | Fermentation Tank (The number according to customer requirements) | 300L or 600L | Top manway/Side manway Drying hop port to brew IPA Dimple Plate Cooling jacket Carbonation port to fill CO2 |
Cooling System | Glycol Water tank | 800L | Equiped with PU level indicator |
Chiller | 3p | UL/CE certified electric elements,Copeland compressor | |
Pump | 3T/H | ||
Cleaning System | Disinfection Tank | 50-100L | SUS304 full welded |
Alkali Tank | 50-100L | ||
Pump | 3T/H | ||
Control System | Control Cabinet | PID or PLC | |
Optional | Auger System Grain Case |
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.