50L 100L 200L Craft Beer Making Machine Micro Brewery Equipment for Sale

Price $28000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 249 people viewed
Quantity
+-
 

Shandong Meto Intelligent Equipment Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
50L-200L
5 Years
3 Years
Water,Malt,Hops,Yeast
Beer
Customized
CE, ISO9001
Electric
Semi-Automatic
SUS304 Stainless Steel
Dimple Plate Jacket
PLC/Himi/Touch Screen
Inner:3-4mm, Exteior:2mm
220V/380V/Adjustable
300L
Depending on Capacity
Depending on Capacity
Bothe Sides TIG Welding
METO
Plastic Film, Plywood Case; Container;
User Requirements
Shandong, China
84384000
Product Description



50L 100L 200L  Craft Beer Making Machine Micro Brewery Equipment For Sale

2 Vessel Brewhouse 3 Vessel Brewhouse 

Mash/Lauter tun+Brew kettle/whirlpool tank

1.Lauter&storage tank+brew kettle/whirlpool tank

2.Lauter&whirlpool tank ,+brew kettle

3.Lauter&HLT +brewkettle/whirlpool tank

Combined 3 Vessel Brewhouse 4 Vessel Brewhouse
1.Mash/lauter tun+ brew kettle +whirlpool tank

2.Mash tun+ lauter tank + brewkettle/whirlpool tank

 Mash tun +lauter tank + brew kettle+whirlpool tank

 
UNitComponentsCapacity Specification 
Malt mill Miller 100KG/HDouble Roller,Noise<60db
Brewhouse Mash/Lauter tun300LMashing Process:Decoction.Infusion.Multi-step infusion 
 Brew Kettle/Whirlpool Tank 300LHeating source:Steam,Electric,direct fire
SUS304/Red copper
 Fermentation tank  Fermentation Tank 
(The number according to customer requirements)
 300L or 600LTop manway/Side manway
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
 Cooling System   Glycol Water tank 800L Equiped with PU level indicator
 Chiller  3p UL/CE certified electric elements,Copeland compressor
Pump3T/H 
Cleaning SystemDisinfection Tank50-100LSUS304 full welded
Alkali Tank50-100L
Pump3T/H
Control System Control Cabinet PID or PLC 
Optional

Auger System

Grain Case
Grist Hydrator 
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller 
Steam Boiler Customized 

...

 

Packaging Details

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

Our Advantages

 

1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer

3. The installation period is about 15 days including assembling brewing tanks and training the operator.  It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.

4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.

5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. 
should
be installed separately. If needed, cost calculate additionally.

6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.

 




 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA