SG-S050
Light&Dark Green, Customized
Mixture
Cement Base
PE, PP
Grid
8000-16800stitches/Sqm
45-60mm
3/4inch, 5/8inch
International Class
6500-13500 Dtex
for Sport
Monofilament
Straight Cut
Long
Arc Type
PP+Net+SBR
Soccor, Football, Rugby, Futsal Feild
UV Stabilized, Fire-Retardant, Waterproof
Rubber and Sand
6-8 Years
7-15 Days
Free
Sungo
Packing in Roll
2m/4m*25m
China
5703300000
Product Description
Sungo Highly Durable UV stabilized Customized Artificial Grass For Football/soccer, baseball, rugby, hockey, mutl-purpose sports field







1. Parceling of the football pitch;
2. Ground correction with infrastructure works;
3. Drainage system installation;
4. Laying the artificial grass rolls on the ground, gluing the joints;
5. Drawing the white lines of the football field;
6. Sandblasting of synthetic turf ground, rubber granule filling;
7. Placing all necessary accessories such as a goal for the football field.




Item No | SG-S050 |
Pile Height | 45-60mm |
Dtex | 6500-13500 |
Gauge | 3/4inch, 5/8inch |
Density | 8000-16800 |
Backing | PP+Net+SBR Latex |
Colour | Light&Dark Green, Red, Blue, Bespoke |
Production Method | Tufted |
Features | Good UV stability; Good water permeability; Easy installation and maintenance |
Loading | 1*20GP: 4,000-4,500sqm; 1*40HQ: 7,000-11,000sqm |
Lead Time | 7-20 Working Days |
Warranty | 6-8 Years |
Application | Football/soccer, rugby, baseball, mutl-purpose sports field |




Fiber is with great resilience , being UV stabilized
Great result in fire resistance and water resistance


Suitable for high performance playing needs
TOP Pro competition court use

In the application of artificial turf to football fields are used felt, helmet (sewing tape), turf adhesive, silica sand (grass-carpet weight on the ground), SBR granule filling material (soft ground and keeps the fibers upright). Artificial turf football field installation consists of step-by-step stages. Artificial turf construction details are given below in items.
1. Parceling of the football pitch;
2. Ground correction with infrastructure works;
3. Drainage system installation;
4. Laying the artificial grass rolls on the ground, gluing the joints;
5. Drawing the white lines of the football field;
6. Sandblasting of synthetic turf ground, rubber granule filling;
7. Placing all necessary accessories such as a goal for the football field.




