UPVC Window Two Head Welding Machine for PVC Profile Processing

Price $3600.00 Compare
Min Order 1 set
Shipping From Shandong, China
Popularity 330 people viewed
Quantity
+-
 

Jinan Haijinna CNC Machinery Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
HJ2-150*3500
Most Issues Are Resolved Within 24 Hours
1 Year Warranty Since Delivery
New
Semi-Automatic
not CNC
220V
2.5kw
400-3500mm
20-150mm(or to Order)
120mm
110mm
0 to 399 Degree
900kg
Hisena Machinery
Plywood Package or Container
4300× 930× 1700mm
China
8515219900
Product Description

 
Product Description

Technical Parameters
ModelHJ2-150*3500
Power supplyAC 220v/50hz
Total Power2.5kw
Air pressure   0.5-0.8Mpa 
Air consumption 200L /min   
Welding length400-3500mm
Welding height20-150mm(or to order)
Welding width ≤120mm
Welding mullion width≤110mm
Welding Temperature 0-399ºC
Size4300×930×1700mm
Weight900Kg

HJ2-150*3500 is a double head welding machine for making pvc windows and doors,

Standard features:
  1. Double heads for welding two corners at a time.
  2. Welding for both 90 degree and V-shaped corners.
  3. Automated welding process.
  4. 3mm welding seam restriction.
  5. Movable right head can be locked by manual or pneumatic braking.  
Detailed Photos

 

Certifications

Packaging & Shipping


Company Profile

FAQ

1. Are you factory or trading company?

We are a factory with more than 10 years experience in manufacturing door and window equipment.

2. What kind of payment methods do you have?

We support T/T and L/C payment.

3.Do you have customized service?

Yes, we can do customized order.

4. How long is the delivery time? What is your delivery method?

The delivery time of our regular stock machines is 10-15 days, and the shipping method is mainly by sea. Small machines, tools and accessories can be shipped by air.

5. How long is the service life of machine, and warranty period?

The designed service life of our machines can be more than ten years, and all machines have one year warranty except consumables.

6. How to install and use the machine after arrival?

Our equipment has been debugged before leaving factory to meet production standard requirements. We can provide engineers on-site installation training, remote videophone installation guidance, installation and commissioning videos, user manuals and variety methods.

7. How to do the maintenance for machine?


Please carry out daily maintenance, monthly and annual maintenance and inspection for the machine according to the requirements in product instruction manual.

After Sales Service

1. Answer support requests inside a two-hour time frame
2. Most issues are resolved within 24 hours.
3. When needed, a technician is usually sent the next day
4. Most parts are kept in our inventory to reduce idle time


Warranty Policy
Service life of our equipment is more than 10 years. All products are with 1 year warranty.
 

Installation Instructions

Our equipment has been debugged before leaving factory to meet production standard requirements. We can provide engineers on-site installation training, remote videophone installation guidance, installation and commissioning videos, user manuals and variety methods.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA