Air Conditioner Industrial Machine Air Clean Vertical Horizontal Air Handling Unit Ahu/Ahu

Price $2000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 332 people viewed
Quantity
+-
 

Shandong Xuguang Tank Air Conditioning Equipment Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
ZKW(X)/ZKL(X)-30
Online
1 Years
Air Handling Unit
Galvanized Sheet
Ultrahigh
110V~380V
Ultra Low
Industrial, Office, Hospital, Exbition Hall
Floor Standing
>20 years
ISO, CE
New
Competitive Price
220
Provided
Provided
Motor
Cooling Ventilation Humidification Air Purifier
Air Handing Unit
30000m3/H
55dB
262.9~476.7kw
318.3~566.3kw
XUGUANG
Wooden Case
2160x2010x2100mm
China
8415830000
Product Description
                                       Vertical Type Air Handling Unit
Product Description

 

 
Product Parameters

 

Modle/ParametersAir volume m3/hFull external pressure/PaMotor Power/kwNumber of heat exchanger rowsCooling capacity/kwHeating capacity/kwcooling water flow m3/hHeating water flow/m3/hNoise dB(A)
ZKW(X)/ZKL(X)-033000800.55424.532.54.212.855
1500.75633.644.15.783.861
3000.75843.657.97.54.9868
ZKW(X)/ZKL(X)-044000800.75432.442.85.573.6857
1500.75643.758.77.515.0564
3001.1857.676.39.96.672
ZKW(X)/ZKL(X)-0550001000.8440.853.67.024.6159
2001.1655.773.49.586.3166
3501.8872.795.412.58.274
ZKW(X)/ZKL(X)-0660001501.144963.58.435.4662
3001.5666.987.911.57.5668
4001.8887.2113.3159.7475
ZKW(X)/ZKL(X)-0770001501.5457.274.59.846.4163
3002.2687.4117.313.510.170
40038102152.317.513.176
ZKW(X)/ZKL(X)-0880001502*08465.485.611.27.464
3002*1.5690.9117.315.610.166
40038116.3152.320.013.173
ZKW(X)/ZKL(X)-0990001502*1.1477.195.413.38.265
3502*1.56103.8131.417.811.367
45048137.1169.823.614.675
ZKW(X)/ZKL(X)-10100001502*1.1488.2107.215.29.265
3502*1.86112.2146.719.312.771
45048156.9190.727.016.478
ZKW(X)/ZKL(X)-15150001502*1.54134.2160.723.113.871
3502*2.26170.9220.129.418.973
4507.58238.7286.041.024.677
ZKW(X)/ZKL(X)-20200002002*34180.4211.731.018.271
4002*46244.2293.142.025.276
450118320.9376.755.232.478
ZKW(X)/ZKL(X)-25250002502*34226.8264.739.022.878
4502*46304.7366.352.431.580
550158403.5470.969.440.583
ZKW(X)/ZKL(X)-30300002502*44262.9218.345.227.479
4502*5.56366.3438.363.037.781
55018.58476.7566.382.048.783
ZKW(X)/ZKL(X)-40400003002*5.54357.1423.561.436.478
4002*7.56487.358483.850.280
60018.58635.4753.5109.364.884



Certifications

 


Packaging & Shipping
 
 


 

Installation Instructions
1. The Ceiling air handling unit should be installed inside the ceiling
Compartment, the side of the condensate pipe is allowed to be as
As five thousands, and the flip is not allowed to be high to ensure the
Smooth discharge of condensate. There should be sufficient space for                               
Installation and maintenance around the unit.
2.The condensate discharge connected to the unit must be sealed
With a sufficient height.
3.The condensing water connection pipe of the table is lower in and up,
and the globe vale and filter should be installed at
The inlet
4.The air duct connected to the unit should be flexibly connected ,
and the water pipe connected to the unit should adopt a flexible nozzle, and
The torque during the takeover should not to be too large, so as not to damage the heat exchanger , the
pipeline must have a separate bracket and the weight shall not be borne by the unit.
5.The power supply of the unit is 380V,50HZ. The power supply meets the requirements to connect
with the motor, after,The power supply is connected, it should be checked whether the fan steering is
correct, if reversed, it should be stopped to change the power supply phase sequence.
Notice:1,H=P/10+20(mm)
2,P is the maximum negative pressure of the unit(mmH2O)

Operation and Maintenance of the Units
1.The unit cooler and heat medium should be clean demineralized water, and its working pressure
should not exceed 1.5Mpa
2.During the normal operation of the unit, the temperature rise of the fan bearing does not exceed
40 degrees 3.The outlet pipe of the unit is equipped with an exhaust valve,before the first operation
and the conversion between hot and cold, the air valve should be opened to drain the air in the heat
exchanger and the pipeline so as not to affect the heat exchanger effect. The unit provides cold
water temperature of not less than 5 degrees is summer and no more than 80 degrees celsius in
winter.
4.In the cold areas of winter and the new fan unit, when the heating mechanism is opened, the
heater should
be opened for 5-10 minutes before the fan supply should be started, prevents large amounts of
cold air from forming an ice plug in the heat exchanger, when the machine is stopped, the fresh
air valve should be closed first, the heater should be closed, and finally the blower should be
closed.
5.When the unit is not used in winter, the water in the coil should be drained and dried a with
a compressor, if the stored water cannot be blown clean, antifreeze should be added to
the tube, if the unit is temporarily running in winter for a short time, it should ensure that
there is hot water circulation in the pipe to prevent rust and freeze , in addition to winter,
when the heat exchanger is deactivated in other seasons, the heat exchanger should also be
filled with water to reduce rust. 6.The filter should be cleaned regularly to ensure the use of
the unit effect, such as the air volume is found to be reduced, generally caused by too much filter
dust.
7.After one month of operation of the unit, it is necessary to check whether the hoisting fasteners
and fan tightening bolts are loose.After two to three years of operation, the unit should be fully
maintained to clear the scale in the heat exchanger tube. Wash the heat exchanger fins with
compressed air or water, Lubricating parts such as fans and motors should be filled with lubricating
oil regularly.
Company Profile

Shandong XUGUANG Tank Air Conditioning Equipment Co., Ltd. was established in 2008, It is the supplier of the overall product at the end of the central air conditioning system, set composite materials, fresh air equipment, fire smoke exhaust equipment and other products research and development, design, production, sales as one of the modern enterprises. Our products have been installed in many countries such as the Russian Federation, Southeast Asia, America,  and so on. The business scope includes a central air conditioning system, FCU, AHU, Fresh air ventilation, Water tanks etc.
The Company has the Fire Protection Product Certification of the Ministry of Emergency Management, CRAA China refrigeration and air conditioning industry authority product performance certification, The water tank molded products won the health license certification of the Shandong Provincial Health Department.  It has passed IS09001 International Quality Management System Certification, IS014001 International Environmental Management System Certification and OHSAS18001 Occupational health and Safety Management System Certification  

Our Advantages

FAQ

 

1 Are you a trading company or a manufacturer?
A: We are a manufacturer as you can see in our workshop as above.
2. What information of AHU do you need to provide to get a quotation? 
 Generally, for Air Handling Unit we need to know the following information:
 1) Cooling capacity;
2) Air volume, fresh air volume? 
3) Static pressure & Air filter etc; 
4) Chilled water type
or DX type with outdoor unit?
 5) Application of the air handling unit?
 6) Other special requirements?
3.  What is the warranty of products? 
 For 1 year warranty. Free to amend and change the parts due to quality reasons in warranty year.

  1.  What is your payment term?
    A:Normally T/T 30% in advance, balance to be paid before delivery.


 





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA