Cop Power 100kw Cummins CNG LNG Natural Gas Generator

Price $32000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 383 people viewed
Quantity
+-
 

Weifang Yidaneng Power Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
YDNC-150
Three Years or 3000 Running Hours
150/187.5
240/415
Gta8.3
270
2650*1200*1650
2760
Water-Cooling
<30@100%Load
24V DC
1500
50Hz
CE ISO Saso
Woodward
YDNPOWER
Customized
open type
China
8502200000
Product Description
cop power 100kW YDN cng lng natural gas generator

COP power 100kW YDN NATURAL GAS GENERATOR TECHNICAL PARAMETERS
ModelYDNC-100
COP power (kW/KVA)100/125
Rated power (kW/KVA)150/187.5
Rated current (A)180
Size (mm)2650*1200*1650
Weight (kg)2760
EngineModelYDNT 8.3
TypeFour-stroke, Water-cooling          Direct Injection, V12-type
Rated Power(kW)165
Rated Speed(rpm)1500
Cylinder No.12
Bore*Stroke(mm)140×152
Cooling MethodWater-cooling
Oil Consumption(g/KWH)1
Gas Consumption(m³/kw)≤0.28@100%Load
Starting method24V DC
AlternatorBrandFARRAND
ModelFLD-150
Rated Power(kW/KVA)150/187.5
Efficiency94.5%
Voltage Regulation<=±1
Excitation modeBrushless, Self Excitation
Insulation ClassH
Control SystemModelSmartgen 9510
Working VoltageDC8.0V - DC35.0V
Overall Dimensions266 mm x 182 mm x 45 mm
Panel Cutout214mm x 160mm
Working ConditionTemperature:(-25~+70)°C Humidity:(20~93)%
Weight0.95kg

GENERATOR SET REQUIMENTS FOR NATURAL GAS:
(1) Methane should be at least 85%
(2) The Natural gas temperature should be between 0-60 ºC.
(3) No impurity should be in the gas. Water in the gas should be less than 20g/Nm3.
(4) Heat value should be at least 8500kcal/m3, if less than this value, the power of the engine
  will be declined.
(5) Gas pressure should be 15-100KPa, if the pressure is less than 15KPa, booster required
(6) The gas should be dehydrated and desulfurated. Make sure that there is no liquid in the
  gas. H2S<200mg/Nm3.
Original Cummins gas generator OEM certificate

RFQ
(1) Price and payment method:
  30% of the total price by T/T as deposit, 70% T/T balance before shipment. The payment  
  will prevail.

(2) Delivery time: deposit within 30 working days
(3) Warranty period: 3 year from the date of delivery of the product or 3000 hours of normal
  operation of the unit, whichever comes first.

(4) Packing: Stretch film or plywood packaging
(5) Port of loading: QINGDAO, CHINA

Company Profile

Shandong Ecome Power Equipment Co., Ltd. Is Weifang Yidaneng Power Co., Ltd. sales company.Founded in 2009, Weifang Yidaneng Power Co., Ltd. is located in Weifang City, Shandong Province, which is known as the "China Power City". It is mainly engaged in the research and development and production of diesel engines, gas engines, diesel generator sets and gas generator sets.The factory covers an area of 36,000 square meters, including the production department, technical department, and international trade department. More than 50 employees.




The company has passed ISO9001 quality management system certification, ISO14001 environmental management system certification, OHSAS18001 occupational health and safety system certification, Saudi SASO certification, EU CE certification.
The company has self-support import and export rights, and the products are exported to foreign countries, especially the Southeast Asia, Middle East and Central Asian countries along the Belt and Road. At present, the company has established long-term and stable cooperative relations with more than 20 countries including Asia, Africa and America.





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA