5L 10L 15L 20L HDPE Extrusion Blow Jerrycan Barrel Blowing Drum Canister Bottle Mould Aluminum Mold

Price $3000.00 Compare
Min Order 1 Set
Shipping From Zhejiang, China
Popularity 390 people viewed
Quantity
+-
 

Taizhou Xiongshi Plastic Mould Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
XS202405081
1 Year
Injection Mould
Texture
Multi Cavity
PE
Single-Process Mode
Commodity
Hot Runner
UG
Fixed
ISO
DME
Customized
1 Year
P20h, 718h, 2316, S136, 2738, Stc
Ejectors/Water Tips/Rings/Steal Rings/
STP/Step/X-T/Igs
1 Million Shots
Yudo, Sure, etc
customized
Wooden Case
mould steel: s136
Taizhou, China
8480719090
Product Description


Product Description
Product Parameters
 
Mould name 5L 10L 15L 20L HDPE Extrusion Blow Jerrycan Barrel Blowing Drum Canister Bottle Mould Aluminum Mold
Mould cavity numbersingle/multi cavity
Mould runner systermcold runner
Mould T1 Time40days
Mould packageexported wooden case
Mould Life1 million shots
Mould core&cavity steelP20,Aluminum
Mould base steel45#, P20
Product Description

We started making extrusion blow moulds since 2009. After decade years development , the jerrycan blow mould made by us always with high quality and mold efficient running.Clients speak highly of our jerrycan blow mould quality, fast production, shot cycle time 12s, no flash, and cap open and closing have good performance. 
 

§. plastic extrusion blowing canisters drawing description

The parts draft designs provide by clients. After received the initial part designs from client, we will check the detail, analysis the part design and its plastic raw material. For some complicated parts, we may need to make the DFM report to show the client the detail problems on the part designs.The DFM report sent to client with PDF file or PPT file, from the report, client can get know the detail problems on the part design, and also would know the conception of the mould design. After presented the DFM report to client, client will discuss and tell us if they will need us to make the improvement for the part designs. Most of client will require us to change the part designs for them. As we know better on how to design the parts to fit for making moulds. In this way, we can save lots of time, because parts designs modified by us is faster.

§. Plastic extrusion blowing canisters mould 3D design

Once the parts 3D designs confirmed, we can start the mould 3D design. Before the mould 3D design, we need to know the detail plastic raw material shrinkage rate, injection machine detail specification, and the detail requirement on the moulds standard parts.

Our mould designers are quite knowledgeable and 10+ years experiences,they are qualified to figue out completed and excellent mold design with detailed ejector system,cooling system and runner system.mould main structure already come into mind, only if there are some small details need to discuss with client and make change on the mould 3D design. Such as limit switch, shot counter, which we didn't make them in the first time submited moulds design.

§. plastic extrusion blowing canisters mould machining

  1. mould steel procurement
Once moulds design confirmed by client, we can go on the mould steel purchasing and cutting. Steel plates are cut by steel supplier. We just send the steel purchase order to the supplier. The steel detail sizes and detail tooling request already marked on the purchase order sheet. Steel cutting is the first step of the mould tooling. Steel cutting job were done by steel supplier factory. Before the steel plates delivered to our factory, we will check the steel hardness. Inspect the steel hardness can check the steel quality. As every different steel have their own hardness level. If hardness can match the steel which ordered, means that steel is exact what you order. 

 2. plastic extrusion blowing canisters mould rough tooling

For commodity mould, the main rough tooling machine is CNC milling tooling. But for some big parts mould, use tooling centre to tool the mould. As that machine tool big mould, much faster. After rough tooling,moulds will be going on with precise tooling, including cnc high speed milling tooling and cnc engraving tooling.

3. plastic extrusion blowing canisters mould precise tooling.

Precise tooling include cnc engraving tooling, high speed cnc milling tooling, EDM tooling, EDW tooling, etc.
CNC engraving tooling include high speed, middle speed and normal speed. The tooling precision high speed > middle speed > normal speed. So when parts require high precise, means tooling require high speed cnc engraving tooling. At the same time, the tooling cost high speed > middle speed > normal speed. So parts sizes tolerance request higher, the tooling cost higher.
Some sizes, like ribs, sizes are very small and narrow, can not be directly tooled by cnc engraving tooling. In this situation, we need to make electrode and tool the mold by EDM. Mainly electrode material include carbon and copper. Copper electrode cost is higher than carbon electrode. The advantage for copper electrode is that its life longer and not easy broken. So some very very small sizes EDM tooling will use copper electrode.

EDW tooling also used to tool small sizes, but which is 0° angle with straight direction. EDW tooling include slow speed and high speed. This tooling is different with cnc milling tooling and cnc engraving tooling. EDW tooling low speed sizes tooled more precise and cost higher.

4. Deep hole drilling tooling 

Normally cooling lines and ejector pins holes are tooled by deep hole drilling tooling. As normal drilling machine tooling, holes may not straight. Therefor, especially for ejector pins holes, not allowed to be tooled by normal drilling machine.

5. plastic extrusion blowing canisters mould polish

After precise tooling finish and cooling lines and ejector pins holes ready tooled, moulds can be assembled and polished. Some home appliances mould need high shinning finish on the part surface, mould polish request is very high. Therefore this mould can't be polished by polishing machine, they need to be polished by manual.

Mould Production Process
FAQ

Q1: Are you mould factory or mould trader?
Answer: We are speciallized plastic injection mould factory locacted in Taizhou, China Since 2009. We provide our clients plastic injection and blowing molds solution.

Q2: How to visit your company?
Answer: Our city is near Shanghai, When you arrive at Shanghai airport, you can by high speed train from Shanghai Hongqiao train station to Taizhou Station. We will pick you up from train station.

Q3: What's the payment term?
Answer: TT, 40% advance payment, balance amount be paid before mould shipment.

Q4: How can I achieve satisfied product design?
Answer: In the begining, you may only have a rough product idea or rough product drawing, we are capable to make initial design and  imporove the rough product drawing till to completed and satisfied drawing through effective mutual communication. Finally we will figure out the whole project secessfully.

Q5: How about delivery time?
Answer: The T1 trial time normally 25-70days depends on different mould. After trial samples are approved by client, moulds can be shipped within one week.

Q6: What are the services do you offer?
Answer: We offer lots of services to our clients,including product drawing improvement, mould 2D&3D design,prototype samples, mould flow analysis, DFM report,after-sale service,etc


 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA