DC EV Charging EV Fast Charger Two 60kw DC CCS1/2 120kw Connector Floor-Mounted Charging Stations with POS Payment

Price $24999.00 Compare
Min Order 1 Piece
Shipping From Zhejiang, China
Popularity 329 people viewed
Quantity
+-
 

Hangzhou Aoneng Power Supply Equipment Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
120kw
One Pile with Multiple Charges
Public Use
Floor Type
Quick Charge
3pH+N+PE(L1, L2, L3, N, PE)
CCS2*2
180kw
Nominal 5 Meters
7 Inch LCD Touch Screen
Green (Power), Red (Charging), Orange(Fault)
IEC 62196 (Combo CCS 2)
En 61851-23: 2014 & En 61851-1: 2010 IEC 61851-1:
IEC 61851-21-2: 2018
DIN 70121 / ISO 15118
Ocpp1.6
4G / Ethernet (Ethernet)
CE
750 (W)× 750 (D) × 1800 (H) mm
405kgs
Aoneng
Wooden Case Packing
750 (W)*750 (D) *1800 (H) mm
China
850440
Product Description
 
Product Description
 


Our Advantages

 



 

Product Parameters
Product NameDC EV Charging EV fast Charger two 60kw DC CCS1/2 120kw Connector floor-mounted charging stations with POS payment
Input power connection
3Ph + N + PE(L1, L2, L3, N, PE)
AC input voltage
400 VAC ± 10%
AC input frequency
50 / 60 Hz
Power factor
0.98 (full load)
Efficiency
95% (full load)
Rated power
90kW       120kW       150kW       180kW
Rated input current
130A        175A          220A          260A
Maximum output current
200A        200A          200A          200A
Output voltage
200 ~ 1000 VDC
Cable length
Nominal 5 meters
HMI
7 inch LCD Touch screen
Signal indicator
Green (power), Red (charging), Orange(fault)
Connector Standard
IEC 62196 (Combo CCS 2)
Safety standards
EN 61851-23: 2014 & EN 61851-1: 2010
IEC 61851-1: 2017
EMC standards
IEC 61851-21-2: 2018
EV Compliance
DIN 70121 / ISO 15118
Back-end Communication protocol
OCPP 1.6
RFID system
ISO 14443A, MIFARE DESFire Ev1
Internet connection
4G / Ethernet (Ethernet)
Certification
CE
Dimensions
750 (W)× 750 (D) × 1800 (H) mm
Weight
405kgs

 

Certifications


 

Case Show

FAQ

Q:   Are you the factory or trading company?
A:   We are factory with more than 24 years in the field of new energy. We warmly welcome you for the visit.

Q:   How is the delivery time?
A:   Generally, the delivery time between 7-30 days after getting client's payment. For accurate info depends on the products and the quantity, we can make further communication on this.

Q:  Do you have MOQ requirements?
A: MOQ 1 PC,besides,we have more than 100 technicans to fully meet with customized requirements.

Q:  How long to fully charge a car?
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.

Q:   Can you provide customized service?
A:    Yes. we have been getting involved with the OEM and ODM projects since 2004. So that we can provide professional customized service for our clients.

Q:   Do you have after sales service?
A:    Yes, We provide 2 years warranty for our clients.we have the after-sales service team. Our after-sales engineer Can give the support and instruction by video or phone call while needed.

Q:   Do you make the test after finishing production?
A:   Yes, our production engineer team will do the test while goods finished, and we will prvoide the test info to clients for reference before delivery.

 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA