Hoister/Hoist/Elevator/Lift
Oneline Technical Support
1year
TUV, CNAS, GOST, GB, ISO, CE, CCC
New
630KG
Electric
Steel
Elevator Installation Suspended Platform
380V
9-11m/Min
6m
1.5kw
Yes
Durable
Tian Jing Qing feng Shun
Plastic Film/Wooden Case
ZLP630 Spare Part
Tianjing, Zhongguo
8428909090
Product Description
Product Description
Name | Suspended Platform Models and Main Parameters | |||||||
ZLP1000 | ZLP800 | ZLP630 | ZLP500 | ZLP260 | ||||
Rated Load Capacity | 1000kg | 800kg | 630kg | 500kg | 260kg | |||
Lifting and Descending Speed | 9~11m/min | |||||||
Size of Suspended Platform (Length × Width) | (2.0m×4)×0.7m | (2.5m×3)×0.7m | (1.5m+2m+2.5m)×0.7m | (2.5m×2)×0.7m | Hanging - chair - style | |||
Steel Wire Rope | Structure: 4 × 31SW - PP - 9.1, Minimum Breaking Force: 65 KN | Structure: 4 × 31SW + FC - 8.3, Minimum Breaking Force: 53 KN | Structure: 4 × 31SW + NF - 8.3, Minimum Breaking Force: 53 KN | |||||
hoist | Model | LTD1000 | LTD800 | LTD630 | LTD50 | LTD26 | ||
Winding Mechanism Form |
| |||||||
Rated Lifting Force | 10KN | 8KN | 6.3KN | 5KN | 26KN | |||
electric motor | Model | YEJ100L1-4 | YEJ90L-4 | YEJ90L-4 | YEJ90S-4 | YEJ80-4 | ||
Power | 2.2KW | 1.8KW | 1.5KW | 1.1KW | 0.8KW | |||
Voltage | AC380V | AC220V | ||||||
Braking Torque | 15.2Nm | |||||||
Safety Lock | Type | Swing - arm - type Anti - tilt | ||||||
Model | LS30 | LS30 | LS30 | LS30 | LS30 | |||
suspension mechanism | Quantity | Two sets | One set | |||||
Adjustment Height | 1.00-1.70m | |||||||
Front Beam Extension Length | 0.7~1.7 | |||||||
Quality | Suspended Platform (including Hoist, Safety Lock, Electrical Control Box) | 475kg (steel) 337kg (aluminum) | 435kg (steel) | 380kg (steel) | 325kg (steel) | 50kg (steel) | ||
Suspension Mechanism | 2×175kg | 175kg | ||||||
Counterweight | 1000kg | 1000kg | 750kg | 350kg | ||||
Complete Machine | 1000kg (steel), 862kg (aluminum basket) | 950kg (steel) |
|
| 400kg (steel) | |||
| ||||||||
Ambient relative humidity ≤ 90% (at 25°C) | ||||||||
Power supply voltage deviation from rated value ± 5% | ||||||||
Working wind speed ≤ 8.3m/s (equivalent to Beaufort scale 5) |

A: We are a manufacturer with our own factory. We have more than 25 year's experiences in producing suspended platforms H frame scaffolding,Ringlock scaffolding and self-climbing scaffolding.
Q: How long is your delivery time?
A: Generally, within 3-7 days after receiving payment or depends on the quantity of your order.
Q: Does the platform size can be customized?
A: Yes, OEM service is available here. We can adjust it according to your requirement.
Q: What materials do you use when producing suspended platforms?
A: The materials we use are aluminum alloy; hot-dip galvanized steel and painted steel.
Q: Do you have relevant certificate?
A: We have CE, ISO9001 certificate, and we can assist you with any certificate application you need.
Q: Do you have inspection procedures for the manufacture line?
A: We have 100% self-inspection quality management system during production and before packing.
Q: Can I have a visit to your factory before the order?
A: Why not? Welcome to my factory. You may contact us before you visit, our sales personnel will provide you a full assistance.