EM50
One Year Against Any Manufacturing Defects
12 Month
CE, ISO9001
Electric
Thermal Processing
Automatic
Candy, Cotton Candy
Customized
YINRICH
Wooden Case
China Mainland
84382000
Product Description
The EM50 processing(producing/production/making) line is a complete plant for continuously producing(making) various kinds of extruded cotton candy(confectionery/marshmallow) which comes in a variety of colors and shapes






WARRANTY:
The buyer guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts or send the technicians to go to the buyer's site for repairing and maintenance at the seller's cost(FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
Utilities:
The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.
Model | EM50 |
Production capacity kg/h | 50-100kg/hour |
Cutting length of the product mm | 20~160 |
Steam consumption kg/h Steam pressure MPa | 250 0.2~0.6 |
Electric power needed | 15kW/380V |
Compressed air consumption Compressed air pressure | 0.8mP 3 P /min 0.6-0.8MPa |
Conditions needed for the cooling system: 1. Room temperature(C) 2. Humidity (%) | 20~25 45~55 |
Gross weight kgs | 5000 |
Total length of the line m | 25 |






WARRANTY:
The buyer guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts or send the technicians to go to the buyer's site for repairing and maintenance at the seller's cost(FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
Utilities:
The buyer should prepare sufficient electric power, water, steam and compressed air supplies which are suitable to be connected to our machinery before the arrival of our machinery.