Model No. | GYT 48-60 | Customization | Available |
Surface Treatment | Galvanized, Powder Coated, Painted | Usage | Building, Industrial |
Specification | 48-60mm | Erection Position | External Scaffolding |
Adjustable Length | 1.8-4m | MOQ | 800 |
Diameter | 48/56/60mm | Scaffolding Part Type | Scaffolding Props |
Color | Yellow, Red, Blue, Green | Transport Package | Bundle |
Material Grade | Q235 | Trademark | GYT |
Prop Type | Cup Nut, Cast Nut | HS Code | 7308400000 |

GYT Adjustable scaffold acrow painted building halloween shoring Jack scaffolding steel prop
(1) The steel prop is mainly composed of inner pipe, outer pipe, pillar nut, jack roof and bottom plate. Its structure is simple and flexible.
(2) Easy steel disassembly; it can be adjusted to any length within its range.
(3) steel prop is used for internal concrete plate support, more stable and reliable.
(4) steel props have long life and reusable. Materials can be recycled even if they are no longer working. The steel props are connected by CO2 arc welding, which has good crack resistance and deformation resistance
(5) The steel props can be adjusted according to the different heights of the building. steel prop, scaffolding steel prop, steel prop for construction, adjustable steel prop, steel support scaffolding, adjustable steel prop, steel support scaffolding, formwork steel props.
Application scenarios:
1. New construction, renovation and decoration of buildings.
2. Aviation and railway.
3. Support all kinds of formwork, flat plates, beams and walls.
4. Buildings of different heights shall serve as temporary support, or villa projects.
Compared with other formwork support systems, steel support is the most economical and convenient construction method, with a wide range of application. Extensive flexible design and production, steel props can be customized for different diameters, thickness, adjustable lengths, etc. steel props can replace tubular scaffolding system, cup lock scaffolding system and wooden support.
Middle East Type Prop | ||||
Adjustable Length | Prop weight | Inner Tube Diameter | Outer Tube Diameter | Tube Thickness |
1.8-3.2m | 12kg | 48mm | 60mm | 2.0mm(in general); 2.5mm (can be optional) |
2.0-3.5m | ||||
2.2-4.0m | ||||
Spanish Type Prop | ||||
Adjustable Length | Prop weight | Inner Tube Diameter | Outer Tube Diameter | Tube Thickness |
1.8-3.2m | 12kg | 48mm | 56mm | 2.0mm(in general); 2.5mm (can be optional) |
2.0-3.5m | ||||
2.2-4.0m | ||||
Plate Type | Thickness | Size | Full name | |
Flower | 4mm | 120mm*120mm | Flower Base Plate | |
Square | 4mm | 120mm*120mm | Square Base Plate |





In order to better protect the safety of your goods, we will provide bundle-based professional, environmentally friendly, convenient and efficient packaging services.









ABOUT US
GuangYiTong Heavy Industry Machinery Co., Ltd is located in the national pilot Free Trade Zone in Fuzhou, China. It is a comprehensive company, that integrates design, production, sales, and leasing. As a professional manufacturer of construction elevators for more than 20 years, it covers an area of nearly 20000 square meters. The production workshops cover 19, 980 square meters. The company has more than 80 employees, including 28 engineering technical personnel, including 15 technicians with intermediate and senior titles. The company′s product quality is stable, cost-effective, applicable, and high-quality after-sales service, has won a wide range of reputation and has become one high-quality supplier of many well-known construction companies such as MCC, CRCC, CREC, and CSCEC in China and some companies in South America, South Asia, and Europ. In the new coming journey, our company will take "creating high-quality machinery, creating a great enterprise brand "as our goal, advocating the culture of quality management in the whole process of production line of high-quality machinery.




How to buy your ideal products?
You can provide us your drawing, and we will produce as your drawing.
Or we can design as your requirements if you do not have a clear plan.
How to pay?
TT ,L/C and WEST UNION are acceptable .
What is the delivery time?
It depends on order quantity.
Generally, the delivery time will be within 15 to 30 days.
How about our product quality?
Our steel prop piles are manufactured with first quality materials
What is steel quality?
This system is built from Q235 steel conical pipe with welded blades,
and can be applied in a wide variety of different geological locations.
How to order from GYT?
Buyer Send Enquiry →Get Zhiyi Quotation → Order Confirmation
→ Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit