2024 Gas Generator Set/Gasoline Accessories/Spare Parts for Example Sparking Plug, High-Tension Cable, Supercharger, Cylinder Liner, Mixer, Valve, Muffler etc.

Price $10.00 Compare
Min Order 5 Pieces
Shipping From Shandong, China
Popularity 308 people viewed
Quantity
+-
 

Shandong Lvhuan Power Equipment Co., Ltd.

VIP   Audited Supplier 11 years
Profile Certified by SGS/BV
lHpj20 - LHpj500
AC Three Phase
Air Cooled
Fixed
Gas Generator
LVHUAN
Standard Shipping
CE ISO
Shandong, China
8502200090
Product Description
 
Detailed Photos

Product Description

1) Application scope of the Accessories, such as 16v190,12v190, 8v190, 6190, 6135 and other engine types. 
2) All parts were from original factories or professional factories, complete in specification, keep good quality.
 

After Sales Service

1.pre-sale service:
We will send our engineer to prospect the site of power station free to charge.According to the situation of site we can supply you many drawings which can meet the requirement of design and construction,like power station floor plan,engineering flow sheet of circle cooling system,genset installation,genset foundation,electrical connection and some other techincal support etc.
2.Sale service:
we will send our engineer to the site to guide you the installation of generator set, subsystem and relative equipment.We will debug the generator set till it can generate power successfully.We will also supply a technical training to the operators.You also can send your staff to our company.We can train you till you can operate the generator set and during this time we can offer you board and lodging free of Charge.
3.After-sale service:
(1)in our company, different people is in charge of different area,we will response periodically and support you technical service free of charge,include equipment debugging,fault eliminating,technical advice,maintenance assistant,etc.
(2)For the quality problem, we will service for you free of charge during the guarantee period.
(3)One year guarantee period and lifetime service.
(4)Insisting on principle of "solving problems first,trying to recover the generator set as soon as possible and then analysis the reason",we solve quality problem in time when genset doesn't work,We insure to help our clients to gain the biggest economic profit.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA