JS-TGSG6000
3 Years
50 Years
PP Board
Single Plate
Single-screw
Automatic
Computerized
CE, ISO9001:2008
Customized
New
JUNSHENG
Plastic Film
6000mm
China
84778000
Product Description
6m plastic PE PP stretched geogrid production line
Controlled by PLC, Junsheng geogrid line realizes the remote control, convenient, accurate, and reliable.
Longitudinal stretching part adopts hot stretching rollers, Transversal stretching part is heated by hot air generat-
ed from the heat exchanger heated by the hot oil.
So, the final single-direction geogrid and bi-direction geogrid is uniformity and high quality.
Geogrid is widely used in fields of water-conservancy, highway, railway, coal mining, and architecture, etc.
It is used to build and protect the dam and reinforce the roadbed of the expressway and railway.




Controlled by PLC, Junsheng geogrid line realizes the remote control, convenient, accurate, and reliable.
Longitudinal stretching part adopts hot stretching rollers, Transversal stretching part is heated by hot air generat-
ed from the heat exchanger heated by the hot oil.
So, the final single-direction geogrid and bi-direction geogrid is uniformity and high quality.
Geogrid is widely used in fields of water-conservancy, highway, railway, coal mining, and architecture, etc.
It is used to build and protect the dam and reinforce the roadbed of the expressway and railway.
Also used as the flood prevention net, dust-block and wall-protection net, and the mine top net, etc.





