Our company has large-scale mechanical production capacity, with 5-meter vertical lathe, 2*10-meter horizontal lathe, 2.5x6.5 CNC gantry milling machine and other large-scale mechanical equipment, using advanced strand technology, cold stability, long life. Guarantee isostatic pressure.
At present, cold isostatic press has been widely used in industrial ceramics pressure forming, high temperature refractories, cemented carbides, permanent magnets, rare metal powder forming and other fields, occupying a considerable market share. Up to now, we have provided more than 500 sets of isostatic presses to the Chinese and international markets. All our products have passed the CE certification with PED clause issued by the European Union. Export countries or regions include Brazil, Russia, Europe, India, Taiwan and etc..



1 | Equipment Name: | Cold Isostatic Press |
2 | Equipment type: | CIP200/300-300 |
3 | Maximum pressure: | 300MPa |
4 | The effective inner diameter of suppress cylinder vessel: | Ø 200mm |
5 | The effective inner height of suppress cylinder vessel: | 300mm |
6 | Pressing system Working medium : | emulsion |
7 | Pressing system driving medium : | L-HM32 anti-wear hydraulic oil |
8 | No working parts pressure rising time: | 0~300MPa,t≤ 3min |
9 | Assistant time: upper plug close+ frame move in: | t≤ 1.5min |
Assistant time: upper plug open+frame remove : | t≤ 1.5min | |
10 | pressure hold time : | 0~9999s Setting freely |
11 | pressure falls during pressure holding : | hold 30min,falls≤2% (pressure setable self-compensation automatically ) |
12 | Control mode: | PLC(Siemens)+HMI(MCGS) / Automatic and Manual mode |
13 | Supercharging mode: | one - time supercharger , gradable pause |
14 | Pressure relief mode: | Automatic pressure relief, gradable pause |
15 | Loading mode: | the upper plug drives the feeding cage to move |
16 | Certificate: | By CE Certificated with PED directive |
17 | Install Way: | on floor |
18 | Power Supply system: | 50Hz, 380V, Three-phase five wire system |
19 | Working condition: |
|
20 | Install Power : | ≈ 15 kw |
21 | Install area: | ≈ 6-8 square meter |
22 | Running noise: | ≤ 75dB |
S.NO. | Type | Diameter of Pressure Vessel | Height of Pressure Vessel | Maximum Isostatic Pressure |
1 | CIP 200/300-300 | 200mm | 300mm | 300Mpa |
2 | CIP 200/1000-300 | 200 mm | 1000mm | 300Mpa |
3 | CIP 420/4000-320 | 420mm | 4000mm | 320Mpa |
4 | CIP 500/1200-400 | 500mm | 1200mm | 400Mpa |
5 | CIP 500/1500-300 | 500mm | 1500mm | 300Mpa |
6 | CIP 710/2000-250 | 710mm | 2000mm | 250Mpa |
7 | CIP 1000/3500-200 | 1000mm | 3500mm | 200Mpa |
b.Whole procedure of the cold isostatic pressing (CIP) machine, increasing, holding and releasing pressure is controlled by PLC and also there is a decompression system to protect the system over pressure to keep the machine in safety running.
The equipment consists of four parts: Suppression system, hydraulic system, filling and pumping system and electrical control system.
acceptance method
5.1. after finish the manufacturing of the press machine, the test production to be proceeded in the Seller's workshop.
5.2. During test production, The Buyer have the right to send people to the Seller for on-site supervision, inspection, verifying all issues including inspection records, debugging records, final inspection reports or other necessary documents for examination and approval to carry out the pre-acceptance.
5.3 After the seller complete the installation and commissioning at the designated location, the final acceptance approved.


1.Within the warranty period, we shall immediately reply and guide troubleshooting within 1 hour after receiving the buyer's equipment failure notice. If it cannot be solved, we shall arrive at the buyer's production site for maintenance and troubleshooting within 24 hours.
2.We shall provide major and medium-sized equipment repair services, spare parts and wearing parts services in a long-term preferential manner. Provide technical support and quality tracking for the use of equipment for life.
3.Be responsible for equipment installation and debugging until it passes the acceptance.
4.We shall train the buyer's maintenance workers and operators free of charge.The training is divided into two parts: theoretical training and practical training.
The training shall be conducted in two times. The first time, theoretical and practical training shall be conducted during the general assembly, debugging and pre-acceptance at our production site for one week; For the second time, the maintenance and operation training shall be conducted from the whole process of hoisting, installation, debugging and acceptance at the buyer's installation site.
2 ~ 3 equipment operators shall be trained free of charge. The training content includes: equipment operation, use, daily maintenance, etc., so that the trainees can operate the equipment independently.
5.We shall be responsible for the effect and quality of the training. If the training provided cannot meet the requirements, the buyer has the right to require retraining or extend the training time by itself.
9.Time Schedule |
9.1.Within 15 days after this agreement comes into force, party B shall submit to party A the outline drawing of the equipment and the basic drawing of installation;
9.2.it is total Four months for equipment design, outsourcing procurement, manufacturing, assembly and in-plant commissioning;
9.3.According to the requirements of the contract, the supplier shall complete the installation and debugging of the equipment within 5 days after the arrival of the goods.