Hydraulic Press CIP200/300-300 with Maximum Pressure 300MPa

Price Negotiable Compare
Min Order 1 set
Shipping From Jiangsu, China
Popularity 212 people viewed
Quantity
+-
 

Chinasun International Industry Co., Ltd.

VIP   Audited Supplier 17 years
Profile Certified by SGS/BV
CIP200/300-300
24 Months
Automation, Precision, High Efficiency
Customized
New
2 Years
Cold Isostatic Press (CIP)
CIP200/300-300
300MPa
200mm
300mm
Emulsion
L-Hm32 Anti-Wear Hydraulic Oil
0-300 MPa, Within 3 Min
Within 1.5min
0-9999s Setting Freely
Hold 30min, Falls Not More Than 2%
Automatic and Manual Mode
One - Time Supercharger, Gradable Pause
Automatic Pressure Relief, Gradable Pause
The Upper Plug Drives The Feeding Cage to Move
Gantry Hydraulic Press
CCC, ISO9001, CE, PED
SHUOHAIPU
Pallet Package
CIP D200MM/H300MM-P300MPA
China
8479899951
Product Description
1.Company profile

 

Sichuan Sohaipu Isostatic Press Technology Equipment Co., Ltd. was founded in 2005. It is a leading manufacturer dedicated to research, development and manufacture of cold isostatic presses. We are famous for its efficient R&D and technological breakthroughs.
Our 
company has large-scale mechanical production capacity, with 5-meter vertical lathe, 2*10-meter horizontal lathe, 2.5x6.5 CNC gantry milling machine and other large-scale mechanical equipment, using advanced strand technology, cold stability, long life. Guarantee isostatic pressure.
2.Product Description

At present, cold isostatic press has been widely used in industrial ceramics pressure forming, high temperature refractories, cemented carbides, permanent magnets, rare metal powder forming and other fields, occupying a considerable market share. Up to now, we have provided more than 500 sets of isostatic presses to the Chinese and international markets. All our products have passed the CE certification with PED clause issued by the European Union. Export countries or regions include Brazil, Russia, Europe, India, Taiwan and etc..
 



 

 
3.Product Parameters

 

1Equipment Name:Cold  Isostatic Press
2Equipment type: CIP200/300-300
 
3Maximum pressure: 300MPa
4The effective inner diameter of   suppress cylinder vessel:Ø 200mm
 
5The effective inner height of   suppress cylinder vessel: 300mm
6Pressing system Working medium :
emulsion
7Pressing system driving medium : L-HM32 anti-wear hydraulic oil
8No working parts pressure rising time:0~300MPa,t≤ 3min
 
9Assistant time: upper plug close+ frame move in:t≤ 1.5min
 Assistant time: upper plug open+frame remove : t≤ 1.5min
10pressure hold time  :  0~9999s Setting freely

11
pressure falls during pressure holding   :hold  30min,falls2%
(pressure setable   self-compensation automatically )
12Control mode: PLC(Siemens)+HMI(MCGS) / Automatic and Manual mode
13Supercharging mode: one - time supercharger , gradable pause
14Pressure relief mode: Automatic pressure relief, gradable pause
15Loading mode: the upper plug drives the feeding cage to move
16Certificate:By CE Certificated with PED directive
17Install Way:on floor
18Power Supply system: 50Hz, 380V, Three-phase five wire system
19Working condition:
  1.  0 ºC~ 45 ºC, Relative Humidity not more than 90%
20Install Power : 15 kw
21 Install  area:   6-8 square meter
22Running noise:≤ 75dB
 
S.NO.TypeDiameter of Pressure 
Vessel
Height of Pressure
 Vessel
Maximum Isostatic 
Pressure
1CIP 200/300-300200mm300mm300Mpa
2CIP 200/1000-300200 mm1000mm 300Mpa  
3CIP 420/4000-320420mm4000mm320Mpa 
4CIP 500/1200-400500mm1200mm400Mpa
5CIP 500/1500-300500mm1500mm300Mpa
6CIP 710/2000-250710mm2000mm250Mpa
7CIP 1000/3500-2001000mm3500mm200Mpa
a. The vessel inner materials is 34CrNi3MoV alloy whole parts forged and then The forged vessel be wire wounded by alloy of wire(65Mn steel 1.5mm x 6mm size) as per the designed.
b.Whole procedure of the cold isostatic pressing (CIP) machine, increasing, holding and releasing pressure is controlled by PLC and also there is a decompression system to protect the system over pressure to keep the machine in safety running.
4.Equipment Composition

 

The equipment consists of four parts: Suppression system, hydraulic system, filling and pumping system and electrical control system.

5.About Acceptance

acceptance method

5.1.  after finish the manufacturing of the press machine, the test production to be proceeded in the Seller's workshop.

5.2.  During test production, The Buyer have the right to send people to the Seller for on-site supervision, inspection, verifying all issues including inspection records, debugging records, final inspection reports or other necessary documents for examination and approval to carry out the pre-acceptance.

5.3 After the seller complete the installation and commissioning at the designated location, the final acceptance approved.

6.We and Our Customers

 

7.After Sales Service

1.Within the warranty period, we shall immediately reply and guide troubleshooting within 1 hour after receiving the buyer's equipment failure notice. If it cannot be solved, we shall arrive at the buyer's  production site for maintenance and troubleshooting within 24 hours.


2.We shall provide major and medium-sized equipment repair services, spare parts and wearing parts services in a long-term preferential manner. Provide technical support and quality tracking for the use of equipment for life.

3.
Be responsible for equipment installation and debugging  until it passes the acceptance.

4.We shall train the buyer's maintenance workers and operators free of charge.The training is divided into two parts: theoretical training and practical training.
The training shall be conducted in two times. The first time, theoretical and practical training shall be conducted during the general assembly, debugging and pre-acceptance at our production site for one week; For the second time, the maintenance and operation training shall be conducted from the whole process of hoisting, installation, debugging and acceptance  at the buyer's installation site.
2 ~ 3 equipment operators shall be trained free of charge. The training content includes: equipment operation, use, daily maintenance, etc., so that the trainees can operate the equipment independently.

5.We
 shall be responsible for the effect and quality of the training. If the training provided cannot meet the requirements, the buyer has the right to require retraining or extend the training time by itself.
8.Our Certification

9.Time Schedule

9.1.Within 15 days after this agreement comes into force, party B shall submit to party A the outline drawing of the equipment and the basic drawing of installation;

9.2.it is total Four months for equipment design, outsourcing procurement, manufacturing, assembly and in-plant commissioning;

9.3.According to the requirements of the contract, the supplier shall complete the installation and debugging of the equipment within 5 days after the arrival of the goods.




Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA