0.5-20MW Biomass Gasification Power Plant Using Woody Biomass & Agricultural Waste as Fuel

Price $3000000.00 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 311 people viewed
Quantity
+-
 

Wuxi Powermax Renewable Energy Technology Co., Ltd

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Biomass Gasification Power Plant
1 Year
0.5-20MW
CE
Other
Other
powermax
ISO Containers
20-20000kw
Jiangsu, China
Product Description
Condition:NewWarranty:1 Year, 1 Year
Applicable Industries:Manufacturing Plant, Energy & Mining, OtherShowroom Location:Philippines, Indonesia, Russia, Thailand
Machinery Test Report:CEMarketing Type:Ordinary Product
Warranty of core components:2 years
Core Components:OtherPlace of Origin:Jiangsu, China
Brand Name:PowermaxModel Number:
20-20000kw
Type:PlantElectricity Generator Type:Biomass Gasification
Output Voltage (V):400Key Selling Points:Famous brand PLC
Name:Biomass Power PlantApplication:Industry Electricity Generation
Frequency:50/60HZVoltage:220V 380V 400V 440V
Type of Gas Cleaning:Gas Cleaning SystemHeat Value of Gas:1200-1400Kcal/Nm3
Certificate:CE ISO
Design:UniqueMaterial:Carbon Steel
The basic principle of POWERMAX's biomass gasification system/abbreviated as BGPS) is to convert aariculture andforestry products and wood processing remains(including rice husk, wood powder,branches, offcuts, cron straws,ricestraws,wheat straws,cotton straws,fruit shells,coconut shels,palm shells,bagasse,corn cobs and etc.)into combustiblegas.
it is then used as fuel in gas engine to generate electricity.Biomass gasification successfully conquers the disadvantaqes of biomass,such as low flammability and wide diversityBiomass gasification system is characteristic of small landrequirement and environment friendly.lt's one of the most effective way of biomass utilization.Our biomass aasification proces includes three steps. The First step is biomass gasifcation. which convert biomas.into svngas.The Second step is svnaas purification.The producer gas coming from gasifier usually contains contaminants includina dust coke.tar and etc. The contaminants wil be removed by the purification system to ensure normaloperation of gas engine.
The Third step is power generating in gas engine. The high temperature exhaust gas may be reused by waste heatboiler to generate steam or hot water for civil or industrial use.Steam turbine may also be considered to make agas-steam combined cycle power plant, which will increase the total efficiency.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA