Frame Bladder Type Compression Molding Machine/Timing Belt Machine

Price $20000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 368 people viewed
Quantity
+-
 

Qingdao Maoyuanfeng Industry and Trade Co., Ltd.

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
MJLN-810X10
1 Year
1 Year
CE, ISO, BV
New
Customized
Semiautomatic
Horizontal
380V/415V/450V/220V
Material Processing Machine
5~200kg/H
10~100kw
<50t
Maoyuanfeng
Wooden Case
BV, SGS, CE, ISO9001
China, Qingdao
8477800000
Product Description
Motorcycle Tire Rubber Curing Press with BV, SGS, CE Certification
Product Description:
This press can realize tire loading, shaping, vulcanizing and unloading automatically. Tire can be cooled automatically with post cure inflator. It can adopt two-half mould and segmented mould.

Structure characteristics:

The machine consists of frame, mould opening/closing device, mould adjusting device, center mechanism, curing chamber, loading device, tire unloading device, hydraulic system, electrical system, pipeline system and post cure inflator etc.
Electrical Control system:It adopts PLC as control center, which has touch screen for display unit. The touch screen can display curing state, we can realize the man-machine conversation, such as technology choosing and parameters modification etc.

Our Machine Advantage:
  Hydraulic pressure drives the mould opening/closing and center mechanism.
  Multi-cylinder provide pressure to make even force and small deformation on platens
  The safety lock can make sure the safety for maintenance
  The mould height can be adjusted automatically
  The hydraulic system adopts Yuken, Rexroth, Parke world famous brand which can work safely, reliably and without any leakage
  Low energy consumption
  Advanced control system can finish the setting of vulcanizing and parameter changing rapidly.

Technical Specification of Motorcycle Tyre Vulcanizing Press:
Tire typeMotorcycle TireMotorcycle Tire
Specification8-  214-  12
Mould quantity2-42-4
Total pressure(each mould)(Mpa)10060
Hydraulic system pressure setting value (Mpa)<=21<=21
Hydraulic working pressure setting value(Mpa)<=19.5<=19.5
Hot plate diameter(mm)950650
Insulation cover inner diameter(mm)975700
Max distance between hot plates(mm)10001000
Applicable mould height(mm)120-300120-300
Green tire thickness(mm)450450
Demoulding force,(KN)750750
Max jacking tire height(mm)200200
Open(close) mould speed(mm/s)6060
Heating steam pressure of hot plate(Mpa)Max 1.0Max 1.0
Pressure of inner pressure or compressed air(Mpa)1.5-2.31.5-2.3
Pressure of shaping pressure or compressed air(Mpa)0.1-0.20.1-0.2
Pressure for water(gas) cylinder(Mpa)1.5-2.01.5-2.0
Compressed air pressure for controlling (Mpa)0.350.35
Vacuum(Mpa)0.013-0.0260.013-0.026

FAQ-Problems of customer concern:
About machine performance quality
1.       Q: How to guarantee the quality of outsourcing parts?
         A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q: Which brand of electric part?
         A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3.       Q: Which PLC?
         A: Siemens, Omron, Mitsubishi
4.       Q: How to control the quality?
         A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q: When the guide engineer arrive at customer's factory?
          A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q: What is the warranty time?
          A: 2 years after machine arrived at factory
2.        Q: How to solve the problem?
          A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.


 

Company Profile

 

Qingdao MaoYuanFeng Machinery is a dedicated company to provide high quality rubber machinery to worldwide customers.

Our solutions:
Tire plant solution
Tube plant solution
Conveyor belt plant solution
Rubber mat plant solution
Waste tire recycling plant solution
Reclaimed rubber plant solution
Rubber product plant solution
We are manufacturer and dealer of various kind of rubber machines including rubber processing machines, rubber product making machines.

Our products:
Tire making machines:

Rubber anbury mixer, internal mixer, dispersion kneader, two roll mill, TSR, batch off machine, extruder, calender, building machine, curing press machine.

Conveyor belt making machines:
Vulcanizing press.

Rubber mat making machines
Inner tube making machines

 

FAQ

About machine performance quality
1.       Q:  How to guarantee the quality of outsourcing parts?
         A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q:  Which brand of electric part?
         A:  Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3.       Q:  Which PLC:
         A:   Siemens, Omron, Mitsubishi
4.       Q:   How to control the quality?
         A:   There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q:  When the guide engineer arrive at customer's factory?
          A:   If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q: What is the warranty time?
          A:  2 years after machine arrived at factory
2.        Q:  How to solve the problem?
          A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

 

After Sales Service

Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.

Service
Plant engineering                    - We provide FREE layout design for new plant.
Supplier Integrity                    - 24/7 working machines, extremely reliable.
Plant Installation Support      - Installation&commissioning service.
Spare Parts                              - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization     - Overseas engineers available.
Training                                    - We provide FREE training for new plant.
Raw Materials                          - Raw material support exported from China.

You May Like

Will Gao
Sales manager
Qingdao Maoyuanfeng Industry & Trade Co.,Ltd
A:Shijidadao Road, Huangdao District, Qingdao, Shandong, China
W:+86-188-6397-9388

 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA