1.Rubber tyres
2.Rubber product for automobile (oil seal, body seal, gasket, belt, hose, tube and etc)
3.Electric wires (rubber, plastic and wire harness and etc)
4.Belt (power transmission belt, conveyor belt and etc)
5.Roll (rubber, plastic, printing, copying machine and etc)
6.Rubber product for medical (plug, cap, glove, dental and etc)
7.Sporting goods (golf ball, athletic balls and etc)
8.Food (chewing gum)
Features:
1. An Automatic temperature and time control system to provide 100% mixing effect.
2. Easy to clean chamber and easy color changing.
3. In 6-10 minutes/batch output equivalent to 2/3 units if mixing roller.
4. Pressurized and sealed mixing chamber to provide high mixing performance and prevent environmental pollution.
5. Easy installation, operation and maintenance to lower the running cost.
Mian Technical parameter:
X(S)N Dispersion mixer for rubber and plastics
Modle Item | X(S)N-3×32 | X(S)N-5×32 | X(S)N-10×32 | X(S)N-20×32 | X(S)N-25×32 | X(S)N-35×30 | X(S)N-55×30 | X(S)N-75×30 | X(S)N-110×30 | X(S)N-150×30 | ||
Total volume of mixing chamber | L | 8 | 15 | 25 | 45 | 55 | 75 | 125 | 170 | 250 | 325 | |
Working volume of mixing chamber | L | 3 | 5 | 10 | 20 | 25 | 35 | 55 | 75 | 110 | 150 | |
Driving motor power | kW | 5.5 | 11 | 22 | 37 | 37 | 55 | 75 | 110 | 185 | 220 | |
Tilting motor power | kW | 0.55 | 1.1 | 1.1 | 1.5 | 1.5 | 2.2 | 2.2 | 3 | 5.5 | 11 | |
Tilting angle | Degree | 140 | 140 | 140 | 140 | 140 | 140 | 140 | 140 | 140 | 135 | |
Rotational speed of the rotor (front /rear) | r/min | 32/24.5 | 32/23.5 | 32/25 | 32/27 | 32/27 | 30/24.5 | 30/24.5 | 30/24.5 | 30/24.5 | 30/24.5 | |
Pressure of compressed air | MPa | 0.5~0.8 | 0.6~0.8 | 0.5~0.8 | 0.6~0.8 | 0.6~0.8 | 0.5~0.8 | 0.6~0.8 | 0.6~0.8 | 0.6~0.8 | 0.6~0.8 | |
Capacity of compressed air | m3/min | ≥0.3 | ≥0.5 | ≥0.5 | ≥0.7 | ≥0.7 | ≥0.9 | ≥1.0 | ≥1.0 | ≥1.5 | ≥1.0 | |
Pressure of cooling water (rubber mixing ) | MPa | 0.2~0.4 | 0.2~0.4 | 0.2~0.4 | 0.2~0.4 | 0.2~0.4 | 0.3~0.4 | 0.3~0.4 | 0.3~0.4 | 0.3~0.4 | 0.2~0.4 | |
Pressure of heating steam (plastics mixing ) | MPa | 0.5~0.8 | 0.5~0.8 | 0.5~0.8 | 0.5~0.8 | 0.5~0.8 | 0.5~0.8 | 0.5~0.8 | 0.5~0.8 | 0.5~0.8 | 0.4~0.8 | |
Dimensions | L | mm | 2000 | 1850 | 2640 | 2675 | 2675 | 3200 | 3230 | 3325 | 4075 | 4250 |
W | Mm | 1000 | 1200 | 1650 | 1650 | 1650 | 1900 | 1927 | 2615 | 2712 | 2750 | |
H | Mm | 2220 | 2580 | 2350 | 2560 | 2560 | 2950 | 2958 | 3105 | 3580 | 4106 | |
Gross weight | T | ~2 | ~2.1 | ~3.3 | ~4 | ~4.5 | ~6.3 | ~7.1 | ~9.5 | ~14.9 | ~19.5 |
Our solutions:
Tire plant solution
Tube plant solution
Conveyor belt plant solution
Rubber mat plant solution
Waste tire recycling plant solution
Reclaimed rubber plant solution
Rubber product plant solution

Our products:
Tire making machines:
Rubber anbury mixer, internal mixer, dispersion kneader, two roll mill, TSR, batch off machine, extruder, calender, building machine, curing press machine.
Conveyor belt making machines:
Vulcanizing press.
Rubber mat making machines
Inner tube making machines

Global headquarter: Qingdao, China
Branches: Thailand, Sri Lanka.
Service
Plant engineering - We provide FREE layout design for new plant.
Supplier Integrity - 24/7 working machines, extremely reliable.
Plant Installation Support - Installation&commissioning service.
Spare Parts - Long lasting parts are manufactured by us, always available.
Maintenance/Optimization - Overseas engineers available.
Training - We provide FREE training for new plant.
Raw Materials - Raw material support exported from China.



1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, ABB
Customer can specify the brand.
3. Q: Which PLC:
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.
Foreign Customers Visit Factory:
Will Gao
Sales manager
Qingdao Maoyuanfeng Industry & Trade Co.,Ltd
A:Shijidadao Road, Huangdao District, Qingdao, Shandong, China