Building Material Flying Saw Omega Profile Gypsum Board Hat Furring Channel Ceiling Roll Forming Machine

Price $36000.00 Compare
Min Order 1 Set
Shipping From Fujian, China
Popularity 336 people viewed
Quantity
+-
 

XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
C Purlin Rolling Machine
1 Year Warranty
1 Year
CE, ISO9001
Customized
New
PLC Control System
Manual
Yx24-45
0.3-0.6mm
75mm
7.5kw
Xiamen Liming
40hq*1+20gp*1
8T
Fujian, China (Mainland)
Product Description
Building Material Flying Saw Omega Profile Gypsum Board Hat Furring Channel Ceiling Roll Forming Machine

Type

Roll former for Furring Channel

Shearing Thickness

Up to Max. 0.6mm

Thickness

0.3-0.6mm

Frame Design

Wall-plate-frame-design /New-stand-frame-design

Roll Stages

18+2 stages

Material Of Forming Roller

Cr12,  Heat Treatment, Hard Chrome Coated
Shafts Diameter Φ75mm

Main Motor Power

 15KW

Max. Line Speed of Roll Former

 15m/min (Higher speed is available, depends on the specification required by the buyer)

Hydraulic Group Power

 7.5 KW

Material of Cutting Blade

 Cr12, hear treatment

Electric Standard

380V /50Hz/3PH or as per customer's requirements

Machine Dimensions

8350mm×1560mm×1650mm

Major Color of Machine Painted

 RAL 5015 (Blue) or as per customer's requirements




 



 

After-Sale Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

 

Terms Of Trade

Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA