Vertex Bd Steel Frame House Building Light Guage Roll Forming Machine

Price $30000.00 Compare
Min Order 1 Set
Shipping From Fujian, China
Popularity 304 people viewed
Quantity
+-
 

XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO., LTD.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
Roll Forming Machine
1 Year Warranty
Rolling Machine
Tire Mold Forging
Hydraulic Pressure
Automation
ISO9001, CE, CE, ISO
1 Year Warranty, 12 Months
Customized
Easy to Maintenance
New
Colored Steel
Accessory
Motor Drive
0.4-0.8mm
350MPa
LIMING MACHINERY
40gp'x1+20gp'*1
11T
Fujian, China (Mainland)
Product Description
All details below could be customized
FunctionUsed to produce truss for villa
Size (L*W*H)about 11m*2.1m*1.5m
Weightabout 10T
Thickness of Coil0.8-2.0mm, other thickness make price different
Operating SystemLiming operating system in both Chinese and English
Main motor power--Forming60KW Frequency speed control
DrivenGear & Sprocket
Max. speed of roll forming30m/min (Higher speed available)
Electric Standard380V /50HZ/3PH or as the customer's requirements
Touch ScreenSiemens
PLCSiemens
InverterSchneider
EncoderOmron
ProfileCustomer's draw or our profiles
5T*1250mm Hydraulic De-coiler included; Safe Guard included
Pre punch & pre cutting, with 13 molds to punch & notch
 
Below Photos for reference:






 

After-Sale Service
 

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

 

Terms Of Trade
 

Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.




 
  •  
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA