Premium Quality Victor Journeyman Gas Complete Kit/Welding and Cutting Outfit

Price $140.00 Compare
Min Order 50 Sets
Shipping From Zhejiang, China
Popularity 468 people viewed
Quantity
+-
 

NINGBO STAREX INDUSTRY & TRADING CO., LTD.

VIP   Audited Supplier 5 years
Profile Certified by SGS/BV
VHCW-21TB
CE, ISO9001
200mm
Hand
LPG, Propane, Acetylene
Multiple Flame
Portable
Jet Suction Type
Copper
Cutting, Welding, Heating
16 Kg
8 Inches
3 Inches
Starex
Stainless Steel Toolbox
Brass
China
8468100000
Product Description

Product Description

JOURNEYMAN Elite, Victor model

OXY-ACETYLENE KIT | GAS COMPLETE KIT

CAPACITY : Heavy Duty
Cuts up to 8" (203.2mm)
Welds up to 3" (76.2mm)
Net Weight: 16 kg

FEATURES:
Brass and stainless steel construction.
Torch handle w/two stainless steel needle valves for accurate flame adjustment and durability.
Complete accessory package with hose, spark lighter, goggles, tip cleaners, and replacement O-rings.
O-ring seal design for easy assembling and disassembling, and better for preventing leakage.
Forged and extruded brass for excellent durability.
With reverse flow check valves.

Detailed Photos

Product Parameters

 

ContentsModel
Oxygen RegulatorSR450-540
Acetylene RegulatorSR450-510
Cutting AttachmentCA2460
Torch Handle315FC
Cutting tip1-101-1
Welding NozzleVH-W(1,3,5)
Heating Nozzle8-MFA
Welding GoggleF-1005 Shade #7
Tip CleanerTC5402
Spark StrikerFS5503
SpannerCS5706
Twin Rubber Hose 20Ft W/Fitting 9/16"T Grade
Stainless steel box

 

Packaging & Shipping

 

FAQ
Q1: Can I get samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount
you want. For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the part?
A: Yes, this can be made according to your requirements, but should send us the trademark
authorization letter.
Q3: How about packages?
A: We have our own professional designers to meet any of packing requirements,
accept custom design. 
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your
confirmation.You will be requested to do the deposit before we starting production. After we get the payment, we will process the order. It usually takes 35-45 days if we do not have the items in stock.

 


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA