High Quality Gray Cast Iron Mining Parts Customized for Durability

Price $1500.00 Compare
Min Order 1 Ton
Shipping From Henan, China
Popularity 466 people viewed
Quantity
+-
 

Yuzhou Jingyan Machinery Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
ductile cast iron
Clay Wet Sand
Thermal Gravity Casting
Clay Sand Core
Electronic Accessories
Machining Center
Iron
Sand Blast
Ra6.3
GB
1kg~100kg
Carton Box
Provided
1 PC
7-10 Days Depending on Qty
jing yan
FIBC
1KG~100KG
Yu Zhou
Product Description
Product Description

Sand Core TypeClay Sand Core
MachiningMachining Center
Surface TreatmentSand Blast
StandardGB
Transport PackageFIBC
Trademarkjing yan
Production Capacity2000ton/Year
Yuzhou Jingyan Machinery Co., Ltd, a renowned titan in the realm of mechanical processing, exudes success and excellence. Evolving from its roots as a casting production enterprise, the company has catapulted itself into the forefront of the industry by embracing advanced equipment and optimizing its industrial framework. With a robust capability to swiftly develop innovative products and mold designs, Yuzhou Jingyan Machinery stands out in the market. Here are some prominent highlights that set the company apart:
1. Geographical Location: Strategically nestled in the Yazhuang Industrial Zone, Yuzhou Jingyan Machinery enjoys proximity to the S325 provincial highway, ensuring seamless and efficient logistical operations.
1. How can I get the quotation?
To receive a detailed quote, please provide us with the following: detailed drawings, material specifications, weight, quantity, and any special requests or requirements you have in mind.

2. If we don't have a drawing, can you make a drawing for me?
Absolutely, we can craft highly accurate drawings based on your sample and replicate the sample to perfection.

3. When can I get the sample?
Sample: Expect to receive your sample within 15-20 days after mold production commences. The precise timing depends on the complexity and specifications of your product.

4. What is your main order time?
Order time: Anticipate a lead time of 20-25 days post-payment. The exact duration may vary depending on the specifics and demands of your product.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA