Heavy-Duty Durable Cast Iron Components with Custom Packing Solutions

Price $1500.00 Compare
Min Order 1 Ton
Shipping From Henan, China
Popularity 376 people viewed
Quantity
+-
 

Yuzhou Jingyan Machinery Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
ductile cast iron
Clay Wet Sand
Thermal Gravity Casting
Clay Sand Core
Electronic Accessories
Machining Center
Iron
Sand Blast
Ra6.3
GB
1kg~100kg
Carton Box
Provided
1 PC
7-10 Days Depending on Qty
jing yan
FIBC
1KG~100KG
Yu Zhou
Product Description
Sand Core TypeClay Sand Core
MachiningMachining Center
Surface TreatmentSand Blast
StandardGB
Transport PackageFIBC
Trademarkjing yan
Production Capacity2000ton/Year


Yuzhou Jingyan Machinery Co., Ltd. shines brightly as a paragon of excellence in the mechanical processing sector. With an impressive journey transitioning from a casting production entity into a sophisticated, deep processing powerhouse, we have strategically invested in state-of-the-art equipment and refined our industrial framework. This transformation has endowed us with unparalleled capabilities in the swift development of new products and precise mold creation. Here are some of the remarkable highlights that underscore our position as an industry leader:
1. Geographical Location: Ideally located in the Yazhuang Industrial Zone, we enjoy seamless logistical advantages, thanks to our proximity to the S325 provincial highway, ensuring superior connectivity for all your needs.


1. How can I obtain a quotation?
To receive an accurate and comprehensive quote, kindly provide us with the following details: design drawing, material specifications, weight, order quantity, and any specific requirements you might have.

2. If we lack a drawing, can you create one for us?
Certainly! We have the capability to design a precise drawing based on your sample and accurately reproduce the sample with meticulous attention to detail.

3. When can I expect to receive the sample?
You can anticipate receiving the sample within 15-20 days following the initiation of mold creation. The exact timeline will be contingent upon the intricacies of your specific product.

4. What is the typical lead time for orders?
Our standard order completion timeframe is 20-25 days post payment. However, the exact timeline may vary based on the unique requirements of your product.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA