Our MPP power pipe, crafted from superior modified polypropylene, revolutionizes the way you lay pipelines and cables. Experience the ease of installation in special sections, including roads, railways, buildings, and river beds, all without the need to dredge, dig up, or destroy the road surface.
Unlike traditional methods that involve extensive digging and cause issues like dust and traffic congestion, our trenchless pipe engineering aligns seamlessly with environmental protection requirements. This advanced technology enables pipeline installation in areas where excavation is not possible, such as Heritage Conservation Districts, bustling downtown areas, protected farmlands, highways, and rivers.
Boasting high strength, excellent high-temperature resistance, and effortless installation, our MPP power pipe stands out for its convenience and cost-effectiveness, making construction projects smoother and more efficient.



MPP Cable Conduit Pipe's Parameter Datas | ||||
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) | ||
Ring Stiffness (3%) Grade (Normal Temperature) | ||||
SN24 | SN32 | SN40 | ||
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 | |
150 | 10 | 12 | 14 | |
175 | 12 | 14 | 16 | |
200 | 14 | 16 | 18 | |
225 | 16 | 18 | 20 | |
250 | 18 | 20 | 20 |








During the installation of the MPP power cable protection tube, selecting the correct connection method is crucial. Proper connection ensures the reliable operation of the power piping system. This section introduces several common methods to help you understand their characteristics and suitable application scenarios.

02. Remove dirt from both pipe ends. Place the pipe into the frame clamp ensuring equal extension lengths at both ends. Support the parts outside the pipe rack. Align the pipe with the centerline of the frame, secure the slip, and insert a milling cutter to mill the pipe.
03. Mill the pipe until continuous cutting occurs at both ends. Then, release the pressure and let the milling cutter idle for two or three rotations before retracting the movable frame and turning off the milling cutter switch.
05. Once the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe end circumference flips and the minimum curling reaches the specified height. Reduce the pressure so the pipe end contacts the heating plate, continuing to heat for the specified duration.
06.After reaching the specified heat absorption time, retract the movable frame quickly and remove the heating plate. Close the pipe ends swiftly, keeping the switching time minimal and within the specified limit. Ensure the closing pressure is not too high to prevent molten material from being squeezed out, which could lower the welding quality.
07.Increase the pressure to the specified value for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.

Our extensive product range includes premier HDPE, PVC, PP-R, MPP, and various other series, impeccably designed to meet the demands of construction engineering, municipal projects, agricultural irrigation and drainage, gas transportation, home decoration, and power cable sheathing. With nearly 3000 distinctive varieties and specifications, our offerings encompass pipes, fittings, and valve products, ensuring top-notch quality and unmatched reliability in every application.

Our Advantages
With a steadfast commitment to international trade, we provide a tailored experience for pipeline dealers worldwide. Our investment in state-of-the-art mechanical equipment reflects our dedication to building a modern factory. With an impressive annual output of 30,000 tons, our products can efficiently fill up to 3000 containers, demonstrating our substantial production capacity and global reach.
By integrating cutting-edge machinery and an exceptional management system, we effectively reduce costs, minimize delivery times, and ensure the superior quality of every product we produce, setting industry benchmarks for excellence.
Are you a trading company or a factory?
We are a distinguished manufacturer, warmly inviting you to visit our state-of-the-art factory at your convenience.
What is your delivery time? For smaller quantities, we use international couriers like DHL, FedEx, and TNT, ensuring delivery within 3-5 days. For bulk orders, shipments are sent by sea and the duration may vary from days to weeks, depending on the destination port.
Can you provide samples?
Absolutely! Standard product samples are complimentary, with only freight charges applicable. For premium items, both product cost and freight charges apply. Regular customers and VIP clients enjoy complimentary samples as a token of our appreciation.
Do you provide OEM services?
Yes, we offer bespoke OEM services tailored to your needs, including custom logos, packaging, and more.
What are your payment terms?
We accept TT or L/C at sight, with T/T requiring a 30% advance payment and the balance settled before shipment or via L/C.
What is your Minimum Order Quantity (MOQ)?
Our MOQ is flexible and can be customized to meet your specific requirements.
Can I use my own label or packaging?
Certainly. We are happy to comply with your labeling or packaging preferences.
How do you ensure the quality of your products?
Integrity and accountability are our core values. We guarantee the quality of all our products, conducting thorough testing and providing a Certificate of Analysis (COA) before delivery.