Versatile Mpp Electric Power Pipe

Price $0.33 Compare
Min Order 100 Meters
Shipping From Jiangsu, China
Popularity 294 people viewed
Quantity
+-
 

Yangzhou Huawei Pipe Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
DN100mm-250mm
Online After-Sales Service
1 Year
PP
<0.01%
<0.4%
Sn24, Sn32, Sn40
0.90-0.94
When The Deformation in The Vertical Direction of
≥36 MPa
to Be Agreed Upon by Supply and Demand
It Is Connected by Hot Melt Butt
Wilvida
Customized According to Customer Requirements
According to the customer can be customized
Jiangsu, China
3917210000
Product Description
Product Description
 

Our MPP Power Pipe, crafted from superior modified polypropylene, revolutionizes the way you approach pipeline and cabling projects. Forget the mess and hassle of traditional excavation methods! Our advanced pipe system allows seamless installation across complex terrains, including roads, railways, buildings, and riverbeds, without tearing up the ground.

Unlike conventional digging methods, our trenchless pipe engineering is the ultimate solution for environmentally-conscious construction. Traditional methods generate dust, create traffic congestion, and disrupt daily life-our innovative technology eliminates these disturbances. Ideal for sensitive areas like heritage conservation districts, bustling downtowns, protected farmland, highways, and rivers, our trenchless approach keeps the environment intact and projects running smoothly.

Experience unmatched performance with our MPP Power Pipe. Boasting high strength and superior resistance to high temperatures, it ensures durability and reliability. Enjoy effortless installation, convenient construction processes, and reduced costs-making it the smart choice for all your infrastructural needs.

Detailed Photos
 
 
Product Parameters
 
 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm)Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24SN32SN40
10088106000/9000
12581012
150101214
175121416
200141618
225161820
250182020
 
Certifications
 
 
 
Packaging & Shipping
 
 
Installation Instructions
 

In the installation process of MPP power cable protection tube, the connection method is a very important part. The correct selection of the appropriate connection method can ensure the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.

01,Before installation, check whether the power supply, hydraulic oil, and heating plate of the welding machine meet the welding requirements; Conduct an empty car test run on the milling cutter oil pump switch, etc; Install the slips that match the specifications of the pipe into the rack; Set the temperature of the heating plate to the welding temperature, and before heating, wipe the surface of the heating plate with clean soft paper or alcohol to clean its oil stains.

02,Remove dirt from both ends of the pipe. Place the pipe into the frame clamp so that the length of the extension at both ends is equal. The parts outside the pipe rack should be supported by supports. Place the pipe at the same height as the centerline of the frame, and then secure the slip. Insert a milling cutter and mill the pipe.

03,After milling the pipe until continuous cutting occurs at both ends of the pipe, remove the pressure and let the milling cutter idle for two or three weeks before retracting the movable frame and turning off the milling cutter switch.
 
04,Take out the milling cutter and close the pipes at both ends. Check the end face, and the displacement of both ends of the pipe should not exceed 10% of the pipe wall thickness. When closing, there should be no obvious gap between the two end faces of the pipe, and the gap width should comply with: 0.3MM (DN<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05,When the temperature of the heating plate reaches the set value, quickly place it into the rack and apply the specified pressure until the circumference of the pipe ends is flipped and the minimum curling reaches the specified height. Reduce the pressure to the specified value, so that the end face of the pipe is in contact with the heating plate, and continue heating until the specified time.

06,When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends, and the switching time should be as short as possible, not exceeding the specified value. The closing pressure should not be too high, otherwise it will squeeze out the molten material and cause a decrease in welding quality.

07,Raise the pressure to the specified value and maintain pressure for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
 
Company Profile
 
Founded in 2018 in the picturesque city of Yangzhou, China, Yangzhou Huawei Pipe Technology Co., Ltd. is a trailblazer in providing comprehensive, intelligent pipeline system solutions.
Our diverse product lineup includes HDPE, PVC, PP-R, MPP, and more, addressing a wide array of needs in construction engineering, municipal projects, agricultural irrigation, gas transportation, home decoration, and power cable sheathing. With nearly 3000 distinct varieties and specifications, our pipes, fittings, and valve products are engineered to meet the highest standards.

Our Advantages
Committed to excellence in international trade, we provide tailored services to pipeline dealers worldwide. To ensure top-notch quality, we invest in advanced mechanical equipment, enabling an impressive annual output of 30,000 tons, capable of filling 3,000 containers.
Our state-of-the-art machinery and sophisticated management system not only reduce costs but also accelerate delivery times, all while guaranteeing the unparalleled quality of each product.
FAQ
 

Are you a trading company or a manufacturing factory?

We are a professional manufacturer, and we warmly welcome you to visit our factory at your convenience.

How long is your delivery time? For small quantity orders, products will be delivered to you by international courier (DHL, FedEx, TNT, etc.) or by air. Typically, it will take 3-5 days for you to receive the goods after dispatch. For large quantity orders, products will be shipped by sea, taking anywhere from a few days to several weeks to reach your destination port, depending on the location of the port.

Can you provide samples?

Yes, samples are available. For standard products, samples are free, and you only need to cover the freight. For high-value products, you need to pay for both the freight and a portion of the product cost. Once we have established a long-term cooperation or if you become a VIP customer, free samples will be provided as needed.

Do you supply OEM services?

Yes, we offer OEM services tailored to your specific requirements, such as logo customization and packaging.

What are your terms of payment?

We accept TT or L/C at sight. Typically, we require a 30% advance payment by T/T, with the balance payable before shipment or via L/C.

What is your MOQ (Minimum Order Quantity)?

Our MOQ is flexible and can be tailored to meet your specific requirements.

Is it possible to use my designated label or packaging?

Yes, we can accommodate your request to use your appointed label or packaging.

How can you ensure the quality of the goods you offer?

We hold honesty and responsibility as the cornerstones of our company. All products provided to you are guaranteed to be of high quality. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to ensure your satisfaction.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA