Our MPP power pipe is crafted using advanced modified polypropylene as the primary material. This innovative solution eliminates the need to dredge, dig, or disrupt road surfaces, making it ideal for laying pipelines and cables across critical areas such as roads, railways, buildings, and riverbeds effortlessly.
Trenchless pipe engineering represents a significant advancement over traditional excavation methods. By adhering to stringent environmental standards, it avoids the dust, traffic disruptions, and other inconveniences typically associated with conventional construction. This cutting-edge technology is particularly indispensable for projects in heritage conservation districts, bustling downtown areas, protected farmlands, highways, and waterways where excavation is impossible.
Our resilient plastic conduit boasts numerous benefits, including exceptional strength, superior high-temperature resistance, effortless installation, and convenient construction, all at a remarkably low cost.



MPP Cable Conduit Pipe's Parameter Datas | ||||
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) | ||
Ring Stiffness (3%) Grade (Normal Temperature) | ||||
SN24 | SN32 | SN40 | ||
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 | |
150 | 10 | 12 | 14 | |
175 | 12 | 14 | 16 | |
200 | 14 | 16 | 18 | |
225 | 16 | 18 | 20 | |
250 | 18 | 20 | 20 |








In the installation process of MPP power cable protection tube, the connection method is crucial. The correct selection ensures the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods, detailing their characteristics and application scenarios to enhance your understanding.

02. Remove dirt from both pipe ends. Place the pipe into the frame clamp ensuring equal extension length at both ends. The parts outside the pipe rack should be supported. Align the pipe height with the centerline of the frame, then secure the slip. Insert a milling cutter and mill the pipe.
03. After continuous cutting occurs at both ends of the pipe, remove the pressure and let the milling cutter idle for two or three turns before retracting the movable frame and switching off the milling cutter.
05. When the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe ends are flipped and the minimum curling reaches the designated height. Reduce the pressure to the specified value, ensure the pipe end face contacts the heating plate, and continue heating for the required time.
06.When the heat absorption time reaches its specified value, retract the movable frame and swiftly remove the heating plate. Close the two pipe ends quickly, ensuring the switch time does not exceed the specified limit. The closing pressure should be moderate to prevent squeezing out molten material and compromising welding quality.
07.Raise the pressure to the specified value and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, completing the welding process.

Our extensive product line encompasses HDPE, PVC, PP-R, MPP, and more, serving a diverse range of applications from construction and municipal engineering to agricultural drainage, gas transportation, home decoration, and power cable sheathing. With nearly 3000 distinct varieties, our pipes, fittings, and valve products set new standards in versatility and reliability.

Our Advantages
We are dedicated to global trade, catering to pipeline dealers worldwide with bespoke services. Our investment in cutting-edge mechanical equipment has enabled the creation of a modern factory with an impressive annual output of 30,000 tons, equivalent to filling 3000 containers.
Our advanced machinery combined with an impeccable management system allows us to minimize costs, expedite delivery times, and guarantee the superior quality of every product we manufacture.
Q1: Are you a trading company or a factory?
We are a professional manufacturer. You are warmly welcome to visit our state-of-the-art factory at your convenience.
Q2: How long is your delivery time? For small quantity orders, we deliver via international couriers such as DHL, FedEx, TNT, etc., or by air. Typically, it takes 3-5 days for you to receive the goods after dispatch. For large quantity orders, delivery is by sea and the duration ranges from several days to weeks, depending on the destination port.
Q3: Can you provide samples?
Yes, samples are available. For standard products, samples are complimentary-you only need to cover the freight. For high-value products, both freight and a nominal product cost are required. Once we establish a long-term partnership or if you become our VIP customer, we will provide free samples as needed.
Q4: Do you supply OEM services?
Absolutely, we offer bespoke OEM services tailored to your specifications, including custom logos, packaging, and more.
Q5: What are your terms of payment?
We accept TT or L/C at sight. A 30% T/T advance payment is required, with the remaining balance payable before shipment, or via L/C.
Q6: What is your Minimum Order Quantity (MOQ)?
Our MOQ is flexible and can be adjusted according to your specific requirements.
Q7: Is it possible to use my appointed label or packaging?
Yes, we can accommodate your custom label or packaging requirements upon request.
Q8: How can you guarantee the quality of the goods you offer?
We firmly believe that honesty and responsibility are the foundations of our company. Therefore, all products provided are of the highest quality. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to ensure this.