Innovative Sn24-Sn40 Electric Cable Pipe

Price $0.33 Compare
Min Order 100 Meters
Shipping From Jiangsu, China
Popularity 468 people viewed
Quantity
+-
 

Yangzhou Huawei Pipe Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
DN100mm-250mm
Online After-Sales Service
1 Year
PP
<0.01%
<0.4%
Sn24, Sn32, Sn40
0.90-0.94
When The Deformation in The Vertical Direction of
≥36 MPa
to Be Agreed Upon by Supply and Demand
It Is Connected by Hot Melt Butt
Wilvida
Customized According to Customer Requirements
According to the customer can be customized
Jiangsu, China
3917210000
Product Description
Product Description
 

The MPP power pipe from Yangzhou Huawei Pipe Technology Co., Ltd. leverages modified polypropylene as its primary material. Notably, this state-of-the-art pipe eliminates the need for dredging or disturbing the road surface. This makes it ideal for laying pipelines, cables, and managing construction projects in challenging sections such as roads, railways, buildings, and riverbeds.

Trenchless pipe engineering, as employed in our MPP power pipe, significantly surpasses traditional digging methods by aligning with modern environmental protection standards. While traditional methods often generate dust, cause traffic congestion, and other nuisances, our advanced technology ensures seamless pipeline installation even in sensitive areas like heritage conservation sites, downtown regions, protected farmland, highways, and rivers.

Our MPP power pipe boasts numerous advantages, including exceptional strength, superior high-temperature resistance, easy installation, convenient construction, and cost-effectiveness. These attributes make it a preferred choice for a variety of applications.

Detailed Photos
 
 
Product Parameters
 
 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm)Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24SN32SN40
10088106000/9000
12581012
150101214
175121416
200141618
225161820
250182020
 
Certifications
 
 
 
Packaging & Shipping
 
 
Installation Instructions
 

In the installation process of the MPP power cable protection tube, the connection method is crucial. Selecting the appropriate connection method ensures the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.

01. Before installation, verify that the power supply, hydraulic oil, and the heating plate of the welding machine meet the welding requirements. Conduct an empty test run on the milling cutter oil pump switch, etc. Install the slips that match the pipe specifications into the rack. Set the heating plate temperature to the welding temperature, and clean the heating plate surface with clean soft paper or alcohol to remove any oil stains before heating.

02. Remove dirt from both ends of the pipe. Place the pipe into the frame clamp, ensuring the length of the extension at both ends is equal. Support the parts outside the pipe rack. Align the pipe at the same height as the centerline of the frame, and then secure the slip. Insert a milling cutter and mill the pipe.

03. After milling the pipe until continuous cutting occurs at both ends, release the pressure. Allow the milling cutter to idle for two or three cycles before retracting the movable frame and turning off the milling cutter switch.
 
04. Remove the milling cutter and close the pipes at both ends. Check the end faces, ensuring the displacement of both ends does not exceed 10% of the pipe wall thickness. Upon closing, there should be no noticeable gap between the two end faces of the pipe, and the gap width should comply with: 0.3MM (DN).<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05. Once the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe ends' circumference flips and the minimum curling reaches the specified height. Reduce the pressure to the specified value, allowing the pipe end faces to contact the heating plate, and continue heating until the specified time.

06.Upon reaching the specified heat absorption time, retract the movable frame and swiftly remove the heating plate. Close the two pipe ends, ensuring the switching time is as brief as possible and does not exceed the specified value. The closing pressure should not be too high to avoid squeezing out the molten material, which would reduce the welding quality.

07.Increase the pressure to the specified value and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
 
Company Profile
 
Founded in the vibrant city of Yangzhou, China, in 2018, Yangzhou Huawei Pipe Technology Co., Ltd. is passionately committed to delivering comprehensive, one-stop intelligent pipeline system solutions.
Our diverse product portfolio features premium HDPE, PVC, PP-R, and MPP series, expertly designed for a myriad of applications across construction engineering, municipal projects, agricultural drainage, gas transport, home decoration, and power cable sheathing. Boasting nearly 3000 varieties and specifications, our range includes an extensive selection of pipes, fittings, and valve products to meet every need.

Our Advantages
Continuously striving for excellence in international trade, we pride ourselves on offering customized services to pipeline dealers across the globe. Our state-of-the-art facility, equipped with cutting-edge mechanical equipment, ensures an impressive annual output of 30,000 tons, filling up to 3000 containers.
Leveraging top-tier machinery and an impeccable management system, we achieve significant cost reductions, expedited delivery times, and uncompromised product quality, ensuring each item meets the highest standards.
FAQ
 

Are you a trading company or a factory?

We are a professional manufacturer. We warmly invite you to visit our factory at your convenience.

How long is your delivery time? For small quantity products, they will be delivered to you by international courier (DHL, FedEx, TNT, etc.) or by air. Usually, it takes 3-5 days for you to receive the goods after dispatch. For large quantity products, shipping is done by sea. The transit time ranges from several days to weeks, depending on the destination port.

Can you provide samples?

Yes, samples are available. For standard products, samples are free; you only need to cover the freight cost. For high-value products, you need to pay the freight and a certain product cost. After multiple collaborations or once you become our VIP customer, free samples will be provided upon request.

Do you supply OEM services?

Yes, we offer OEM services tailored to your requests, including logo, packaging, etc.

What are your terms of payment?

We accept TT or L/C at sight, with T/T 30% in advance and the balance before shipment or by L/C.

What is your Minimum Order Quantity (MOQ)?

We accommodate our customers' requests regarding MOQ.

Is it possible to use my appointed label or package?

Absolutely. We can use the label or package according to your specifications.

How can you guarantee the quality of the goods you offer?

We firmly believe that honesty and responsibility are the foundations of our company. All products we provide are of high quality. We test the goods and provide a Certificate of Analysis (COA) before delivery to assure quality.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA