Lightweight Mpp Conduit Plastic Tube

Price $0.33 Compare
Min Order 100 Meters
Shipping From Jiangsu, China
Popularity 395 people viewed
Quantity
+-
 

Yangzhou Huawei Pipe Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
DN100mm-250mm
Online After-Sales Service
1 Year
PP
<0.01%
<0.4%
Sn24, Sn32, Sn40
0.90-0.94
When The Deformation in The Vertical Direction of
≥36 MPa
to Be Agreed Upon by Supply and Demand
It Is Connected by Hot Melt Butt
Wilvida
Customized According to Customer Requirements
According to the customer can be customized
Jiangsu, China
3917210000
Product Description
Product Description
 

The MPP power pipe, crafted from modified polypropylene, offers an innovative solution for laying pipelines and cables without the need for dredging, digging, or damaging road surfaces. Ideal for specialized sections such as roads, railways, buildings, and river beds, this advanced conduit system redefines efficiency and convenience in construction projects.

In stark contrast to the traditional 'digging method,' trenchless pipe engineering meets modern environmental protection standards. Unlike conventional construction that often results in dust, traffic congestion, and other disruptions, this cutting-edge technology excels in scenarios where excavation is impractical or prohibited. It is perfect for Heritage Conservation Districts, bustling downtown areas, crop farmland protection zones, highways, rivers, and more.

With a plethora of advantages, our MPP conduit boasts high strength, excellent high-temperature resistance, straightforward installation, and ease of construction-all at a low cost. These features make it an unparalleled choice for any construction and engineering projects.

Detailed Photos
 
 
Product Parameters
 
 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm)Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24SN32SN40
10088106000/9000
12581012
150101214
175121416
200141618
225161820
250182020
 
Certifications
 
 
 
Packaging & Shipping
 
 
Installation Instructions
 

In the installation process of MPP power cable protection tube, the connection method is a very important part. The correct selection of the appropriate connection method can ensure the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.

01,Before installation, check whether the power supply, hydraulic oil, and heating plate of the welding machine meet the welding requirements; Conduct an empty car test run on the milling cutter oil pump switch, etc; Install the slips that match the specifications of the pipe into the rack; Set the temperature of the heating plate to the welding temperature, and before heating, wipe the surface of the heating plate with clean soft paper or alcohol to clean its oil stains.

02,Remove dirt from both ends of the pipe. Place the pipe into the frame clamp so that the length of the extension at both ends is equal. The parts outside the pipe rack should be supported by supports. Place the pipe at the same height as the centerline of the frame, and then secure the slip. Insert a milling cutter and mill the pipe.

03,After milling the pipe until continuous cutting occurs at both ends of the pipe, remove the pressure and let the milling cutter idle for two or three weeks before retracting the movable frame and turning off the milling cutter switch.
 
04,Take out the milling cutter and close the pipes at both ends. Check the end face, and the displacement of both ends of the pipe should not exceed 10% of the pipe wall thickness. When closing, there should be no obvious gap between the two end faces of the pipe, and the gap width should comply with: 0.3MM (DN<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05,When the temperature of the heating plate reaches the set value, quickly place it into the rack and apply the specified pressure until the circumference of the pipe ends is flipped and the minimum curling reaches the specified height. Reduce the pressure to the specified value, so that the end face of the pipe is in contact with the heating plate, and continue heating until the specified time.

06,When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends, and the switching time should be as short as possible, not exceeding the specified value. The closing pressure should not be too high, otherwise it will squeeze out the molten material and cause a decrease in welding quality.

07,Raise the pressure to the specified value and maintain pressure for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
 
Company Profile
 
Yangzhou Huawei Pipe Technology Co., Ltd., established in the vibrant city of Yangzhou, China, in 2018, is at the forefront of providing comprehensive, intelligent pipeline system solutions.
Our company specializes in an extensive range of products including HDPE, PVC, PP-R, MPP, and more. These products play pivotal roles in a myriad of applications from construction engineering and municipal projects to agricultural drainage, gas transportation, home decoration, and power cable sheathing. With nearly 3000 diverse varieties and specifications of pipes, fittings, and valve products, we cater to a wide array of industry needs.

Our Advantages
At Yangzhou Huawei, we are dedicated to global trade, delivering tailored services to pipeline dealers worldwide. Our investment in state-of-the-art mechanical equipment enables us to operate a modern factory with an impressive annual output of 30,000 tons, equivalent to filling 3000 containers.
Leveraging cutting-edge machinery and an impeccable management system, we are able to minimize costs, accelerate delivery times, and uphold the superior quality of each product we produce.
FAQ
 

Are you a trading company or a factory?

We are a professional manufacturer, and we warmly welcome you to visit our factory at your convenience.

How long is your delivery time? For small quantity orders, products are delivered via international couriers (DHL, FedEx, TNT, etc.) or by air, usually arriving within 3-5 days after dispatch. For large quantity orders, products are shipped by sea, taking from several days to weeks to reach your destination port, depending on its location.

Can you provide samples?

Yes, samples are available. For standard products, samples are free-you only need to cover the shipping cost. For high-value products, you need to pay for both shipping and product costs. After multiple collaborations or when you become our VIP customer, we will offer free samples upon request.

Do you supply OEM services?

Yes, we offer OEM services as per your requests, including LOGO customization, packaging, and more.

What are your terms of payment?

TT or L/C at sight, with T/T 30% in advance and the balance due before shipment or via L/C.

What is your MOQ (Minimum Order Quantity)?

We accommodate customers' requests.

Is it possible to use my appointed label or packaging?

Yes. If required, we can use labels or packaging according to your specifications.

How can you guarantee the quality of the goods you offer?

We firmly believe that honesty and responsibility are the foundation of our company. Therefore, all products we provide are of high quality. We conduct thorough testing and supply a Certificate of Analysis (COA) before delivery to ensure the products meet your standards.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA