The Premium MPP Conduit Plastic Tube is expertly crafted using modified polypropylene as its primary material. This innovative product eliminates the need for dredging, excavation, and road surface disruption, making it ideal for laying pipelines, cables, and other essential infrastructure projects in challenging locations like roads, railways, buildings, and riverbeds.
Trenchless pipe engineering, as opposed to traditional excavation methods, significantly enhances environmental protection. While conventional construction can result in dust emissions, traffic congestion, and other inconveniences, this advanced technology allows for seamless pipeline installation in areas where digging is impractical. Ideal for Heritage Conservation Districts, bustling urban centers, protected farmlands, highways, and river crossings, it ensures minimal disruption and maximum efficiency.
Our Premium MPP Conduit Plastic Tube offers numerous benefits, including exceptional high strength, superior resistance to high temperatures, ease of installation, convenient construction, and cost efficiency. These features make it the optimal choice for a wide range of applications.



MPP Cable Conduit Pipe's Parameter Datas | ||||
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) | ||
Ring Stiffness (3%) Grade (Normal Temperature) | ||||
SN24 | SN32 | SN40 | ||
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 | |
150 | 10 | 12 | 14 | |
175 | 12 | 14 | 16 | |
200 | 14 | 16 | 18 | |
225 | 16 | 18 | 20 | |
250 | 18 | 20 | 20 |








In the installation process of the MPP power cable protection tube, the connection method is a crucial aspect. Proper selection of the appropriate connection method ensures the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand the characteristics and application scenarios of each method.

02. Remove dirt from both ends of the pipe. Place the pipe into the frame clamp ensuring equal extension length at both ends. The parts outside the pipe rack should be supported. Align the pipe height with the centerline of the frame and secure the slip. Insert a milling cutter to mill the pipe.
03. After milling the pipe until continuous cutting occurs at both ends, relieve the pressure and let the milling cutter idle for two or three weeks before retracting the movable frame and turning off the milling cutter switch.
05. Once the heating plate reaches the set temperature, quickly place it into the rack. Apply the specified pressure until the pipe ends' circumference flips and the minimum curling reaches the designated height. Reduce the pressure to the specified value, ensuring the pipe end face contacts the heating plate, and continue heating for the specified time.
06. Upon reaching the heat absorption time, retract the movable frame and promptly remove the heating plate. Close the two pipe ends quickly, keeping switching time minimal and within specified limits. Avoid excessive closing pressure to prevent squeezing out molten material and compromising welding quality.07. Increase the pressure to the specified value and maintain it during cooling. After allowing natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.
08. Final checks and adjustments.09. Raise the pressure to the specified value and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.

Our diverse product range includes HDPE, PVC, PP-R, MPP, and other series, catering to a broad spectrum of applications in construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. We proudly offer nearly 3000 distinct varieties and specifications of pipes, fittings, and valve products.

Our Advantages
Committed to advancing international trade, we offer tailored services to pipeline dealers worldwide. Our state-of-the-art factory, equipped with cutting-edge machinery, boasts an impressive annual output of 30,000 tons, capable of filling 3000 containers.
Leveraging our top-tier machinery and impeccable management system, we are able to minimize costs, accelerate delivery times, and guarantee the unparalleled quality of each product.
Are you a trading company or a factory?
We are a professional manufacturer, and we warmly welcome you to visit our factory at your convenience.
What is your delivery time? For small quantity orders, products are shipped via international couriers (DHL, FedEx, TNT, etc.) or by air, typically arriving within 3-5 days after dispatch. For larger orders, delivery is by sea, which can range from several days to weeks, depending on the destination port.
Do you provide samples?
Yes, we provide samples. For standard products, samples are free-you only need to cover the shipping costs. For high-value items, both the shipping and a portion of the product cost apply. After multiple collaborations or if you become a VIP customer, we will offer free samples when needed.
Do you offer OEM services?
Yes, we provide OEM services tailored to your requests, including logo, packaging, and more.
What are your terms of payment?
We accept TT or L/C at sight. For T/T, 30% payment is required in advance, with the remaining balance payable before shipment.
What is your Minimum Order Quantity (MOQ)?
Our MOQ is determined based on customer requirements.
Can I use my own label or packaging?
Yes, we can use labels or packaging as per your specifications.
How do you ensure the quality of your products?
We firmly believe that honesty and responsibility are the cornerstones of our company. All products we supply are fully qualified. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to guarantee quality.