Our Modern MPP Conduit for Wiring harnesses the power of modified polypropylene as its core material. This innovative piping solution negates the need for dredging, excavation, or surface disruption, making it ideal for laying pipelines, cables, and other essential infrastructures under roads, railways, buildings, and riverbeds.
Trenchless pipe engineering, a hallmark of our Modern MPP Conduit, surpasses traditional excavation methods in its environmental friendliness. It eliminates dust, reduces traffic congestion, and circumvents other nuisances associated with conventional construction. This advanced technology is invaluable in areas where excavation is impractical, such as heritage conservation districts, bustling downtown areas, crop farmland protection zones, highways, and rivers.
Our Modern MPP Conduit boasts numerous advantages: exceptional strength, superior high-temperature resistance, straightforward installation, convenient construction, and cost efficiency. Experience unparalleled performance and ease with our state-of-the-art conduit solution.



MPP Cable Conduit Pipe's Parameter Datas | ||||
Norminal Diameter/IN(mm) | Norminal Wall Thickness (mm) | Norminal Lenght (mm) | ||
Ring Stiffness (3%) Grade (Normal Temperature) | ||||
SN24 | SN32 | SN40 | ||
100 | 8 | 8 | 10 | 6000/9000 |
125 | 8 | 10 | 12 | |
150 | 10 | 12 | 14 | |
175 | 12 | 14 | 16 | |
200 | 14 | 16 | 18 | |
225 | 16 | 18 | 20 | |
250 | 18 | 20 | 20 |








In the installation process of the MPP power cable protection tube, choosing the right connection method is crucial. The proper connection ensures the reliable operation of the power piping system. Here, we introduce several common MPP power cable protection tube connection methods, detailing their unique characteristics and specific application scenarios to help you make an informed decision.

02, Remove any dirt from both ends of the pipe. Place the pipe into the frame clamp, ensuring equal extension lengths at both ends. Support the parts outside the pipe rack with supports. Align the pipe height with the centerline of the frame, then secure the slip. Insert the milling cutter and proceed to mill the pipe.
03, Mill the pipe until continuous cutting occurs at both ends, then remove the pressure and let the milling cutter idle for two to three revolutions before retracting the movable frame and turning off the milling cutter switch.
05, When the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe ends' circumference flips and the minimum curling reaches the specified height. Reduce the pressure to the prescribed value, allowing the pipe ends to contact the heating plate. Continue heating until the specified duration is reached.
06, When the heat absorption time reaches the specified value, retract the movable frame and swiftly remove the heating plate. Close the two pipe ends immediately, ensuring the switching time is as short as possible, not exceeding the specified limit. The closing pressure should be optimal to prevent squeezing out molten material and compromising welding quality.07, Raise the pressure to the specified value and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding process.
08, Final inspection: Ensure all connections are secure and free of defects. Your MPP conduit system is now ready for reliable and efficient operation.Raise the pressure to the specified value and maintain pressure for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.

Our extensive product range features HDPE, PVC, PP-R, MPP, and other series, which find applications across a variety of sectors, including construction engineering, municipal projects, agricultural drainage and irrigation, gas transportation, home decoration, and power cable sheathing. We boast nearly 3,000 different varieties and specifications of pipes, fittings, and valve products.

Our Advantages
We are dedicated to international trade, offering customized services to pipeline dealers around the globe. To support our modern manufacturing efforts, we have invested in state-of-the-art mechanical equipment. With an impressive annual output of 30,000 tons, we are capable of filling up to 3,000 containers each year.
Our advanced machinery and refined management system allow us to minimize costs, expedite delivery times, and ensure the highest quality in every product we produce.
Are you trading company or factory?
We are a professional manufacturer and welcome to visit our factory at your convenience.
How long is your delivery time? For small quantity products, they will be delivered to you by international courier (DHL, FedEx, TNT etc.) or by air. Typically, it will take 3-5 days for you to receive the goods after dispatch. For large quantity products, shipping is done by sea. The transit time varies from days to weeks, depending on the destination port.
Can you provide samples?
Yes, samples are available. For standard products, samples are free; you only need to cover the freight costs. For premium products, you will need to pay for both the freight and a portion of the product cost. After multiple collaborations or if you become a VIP customer, we will offer free samples upon request.
Do you supply OEM service?
Yes, we offer OEM services tailored to your specifications, including LOGO and packaging.
What are your terms of payment?
TT or L/C at sight. Typically, T/T 30% in advance, with the balance due before shipment, or by L/C.
What is your MOQ?
As per customers' requests.
Is it possible to use my own label or packaging?
Yes. We are happy to use your specified label or packaging requirements.
How can you guarantee the quality of the goods you offer?
We firmly believe that honesty and responsibility form the cornerstone of our company. Thus, all products we provide are of high quality. Each product is tested and a Certificate of Analysis (COA) is provided before delivery.