Robust Sn24-Sn40 Plastic Conduit Pipe

Price $0.33 Compare
Min Order 100 Meters
Shipping From Jiangsu, China
Popularity 278 people viewed
Quantity
+-
 

Yangzhou Huawei Pipe Technology Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
DN100mm-250mm
Online After-Sales Service
1 Year
PP
<0.01%
<0.4%
Sn24, Sn32, Sn40
0.90-0.94
When The Deformation in The Vertical Direction of
≥36 MPa
to Be Agreed Upon by Supply and Demand
It Is Connected by Hot Melt Butt
Wilvida
Customized According to Customer Requirements
According to the customer can be customized
Jiangsu, China
3917210000
Product Description
Product Description
 

Our MPP Power Pipe, crafted from superior modified polypropylene, is the ultimate solution for your construction needs. This innovative pipe eliminates the need for road dredging, digging, and destruction, making it perfect for laying pipelines, cables, and other infrastructure in challenging sections such as roads, railways, buildings, and riverbeds.

Embrace the future of construction with trenchless pipe engineering! Unlike traditional methods that disrupt the environment with dust, traffic congestion, and excavation, our technology ensures seamless construction. Ideal for Heritage Conservation Districts, bustling downtown areas, protected farmlands, highways, and river crossings, this approach meets modern environmental protection standards effortlessly.

Our Robust Sn24-Sn40 Plastic Conduit Pipe boasts numerous advantages: unparalleled strength, excellent high-temperature resistance, easy installation, convenient construction, and cost-effectiveness. Experience the myriad benefits and superior performance of our conduit pipes today.

Detailed Photos
 
 
Product Parameters
 
 MPP Cable Conduit Pipe's Parameter Datas
Norminal
Diameter/IN(mm)
Norminal Wall Thickness (mm)Norminal Lenght (mm)
Ring Stiffness (3%) Grade (Normal Temperature)
SN24SN32SN40
10088106000/9000
12581012
150101214
175121416
200141618
225161820
250182020
 
Certifications
 
 
 
Packaging & Shipping
 
 
Installation Instructions
 

In the installation process of MPP power cable protection tube, the connection method is a crucial part. Choosing the correct connection method ensures the reliable operation of the power piping system. This section introduces several common MPP power cable protection tube connection methods to help you understand their characteristics and application scenarios.

01. Before installation, check if the power supply, hydraulic oil, and heating plate of the welding machine meet the welding requirements. Conduct an empty car test run on the milling cutter oil pump switch, and install the slips that match the pipe specifications into the rack. Set the heating plate temperature to the welding temperature. Before heating, clean the heating plate surface with clean soft paper or alcohol to remove oil stains.

02. Remove dirt from both ends of the pipe. Place the pipe into the frame clamp so that the length of the extension at both ends is equal. Ensure the parts outside the pipe rack are supported by supports. Align the pipe height with the centerline of the frame, then secure the slip. Insert a milling cutter and mill the pipe.

03. Mill the pipe until continuous cutting occurs at both ends. Remove the pressure and let the milling cutter idle for two or three weeks before retracting the movable frame and turning off the milling cutter switch.
 
04. Take out the milling cutter and close the pipes at both ends. Check the end face; the displacement at both ends should not exceed 10% of the pipe wall thickness. When closing, there should be no significant gap between the two end faces, and the gap width should comply with: 0.3MM (DN.<25MM); If 0.5MM (225MM400MM) does not meet the requirements, it should be milled again.

05. When the heating plate reaches the set temperature, quickly place it into the rack and apply the specified pressure until the pipe end circumference flips and the minimum curling reaches the specified height. Reduce the pressure to the specified value, so the pipe end contacts the heating plate, and continue heating until the specified time.

06. When the heat absorption time reaches the specified value, retract the movable frame and quickly remove the heating plate. Close the two pipe ends as quickly as possible, not exceeding the specified time. The closing pressure should not be too high, as it may squeeze out the molten material and reduce welding quality.07. Raise the pressure to the specified value and maintain it for cooling. After natural cooling to room temperature, release the pressure, loosen the slip, remove the pipe, and complete the welding.

 
 
Company Profile
 
Yangzhou Huawei Pipe Technology Co., Ltd. was established in the dynamic city of Yangzhou, China in 2018. We are passionately dedicated to delivering comprehensive, intelligent pipeline system solutions tailored to meet diverse needs and challenges.
Our company proudly offers a wide range of high-quality products including HDPE, PVC, PP-R, MPP, and other series. These products find extensive applications in construction engineering, municipal engineering, agricultural drainage and irrigation, gas transportation, home decoration, power cable sheathing, and more. With nearly 3,000 different varieties and specifications, our extensive catalog features pipes, fittings, and valve products expertly designed to cater to a wide array of requirements.

Our Advantages
We are steadfastly committed to international trade, providing customized services to pipeline dealers from across the globe. To support this commitment, we have invested in state-of-the-art mechanical equipment to establish a modern factory. With an impressive annual output capacity of 30,000 tons, we are equipped to fill up to 3,000 containers, meeting the demands of our diverse clientele with precision and efficiency.
Our advanced machinery and impeccable management system not only help reduce costs but also significantly shorten delivery times. This ensures that every product we deliver upholds the highest standards of quality, providing our customers with reliable and superior solutions.
FAQ
 

Are you a trading company or a factory?

We are a professional manufacturer, and we warmly invite you to visit our factory at your convenience.

How long is your delivery time? For small quantity orders, products are delivered via international couriers (DHL, FedEx, TNT, etc.) or by air, typically arriving within 3-5 days after dispatch. For large quantity orders, products are shipped by sea, taking several days to weeks to reach your destination port, depending on its location.

Can you provide samples?

Yes, samples are available. For standard products, samples are free; you only need to cover the freight. For high-value items, you will need to pay for both the freight and a portion of the product cost. After multiple collaborations or if you become our VIP customer, free samples can be provided upon request.

Do you offer OEM services?

Yes, we provide OEM services tailored to your requirements, including LOGO and packaging customizations.

What are your terms of payment?

We accept TT or L/C at sight. T/T 30% in advance, with the balance paid before shipment, or via L/C.

What is your MOQ (Minimum Order Quantity)?

As per the customers' requests.

Is it possible to use my appointed label or package?

Yes, we can use labels or packaging according to your specific requirements.

How can you guarantee the quality of the goods you offer?

We firmly believe that honesty and responsibility are the foundations of a company. Therefore, all the products we provide are fully qualified. We conduct thorough testing and provide a Certificate of Analysis (COA) before delivery to ensure quality.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA