Whole Duck Filling and Sealing Packing Machine for Doypack

Price $33000.00 Compare
Min Order 1 Set
Shipping From Zhejiang, China
Popularity 492 people viewed
Quantity
+-
 

Wenzhou Echo Machinery Co., Ltd.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
MR8-200
1 Year
1 Year
Automatic
Fish, Meat
Filling and Sealing Machine
Heat Sealing
Filling, Seal
Mechanical
Piece of Food
Bag
Composite Materials
SS304/SS316
7 Days/Engineer with training
Tt 30%Down Payment and 70%Balance Before Shipping
Yes
Customize Made
30-60 Days for Gluten Flour Bag Given Packing Mach
CE/ISO9001
ECHO
Standard Wooden Box
2500*1460*1400mm (L*W*H)
China
8422303090
Product Description
 

Product Description

1) Automatic rotary packing machine adopt precision indexing device and PLC to control each action and working station to make sure the machine operates easily and does accurately. 
2) The speed of this machine is adjusted by frequency conversion with the range, and the actual speed depends on type of products and pouch.. 
3) Automatic checking system can check bag situation, filling and sealing situation.
The system shows 1.no bag feeding, no filling and no sealing. 2.no bag opening/opening error, no filling and no sealing 3.no filling, no sealing.. 
4) The product and pouch contact parts are adopted stainless steel and other advanced material to guarantee the hygiene of products. 

Product Parameters

 
ModelMR8-200R/MR8-300R/MR8-400R
Bags SizeWidth: 80-200mm Length: 100-300mm/Width: 180-300mm Length: 180-450mm/Width: 300-400mm Length: 180-580mm
Filling Volume10-2500g (Depending on type of products)
Capacity25-60 bags/min (The speed depends on type of products)
25-40 bags/min (For zipper bag)
Package AccuracyError≤ ±1
Total Power6.9KW (220V/380V, 3PH, 50HZ)
Demension2500*1460*1400mm (L*W*H)
Weight1400KGS
Compress air requirement≥ 0.6m³/min supply by user
Pouch typeAll type of heat sealable preformed side seal bags, block bottom bags,zip-lock recloseable bags, stand-up pouch with or without spout etc.
 

Detailed Photos

Working Process

Station 1: bag feeding---the machine holder will catch the bag from bag magazine

Station 2: date printing---the color ribbon printer will print date or the words into bag

Station 3: open bag---the bag is opened by air and vacuum sucker

Station 4: Filling---the machine finger will keep the bag opening and the filler will filling material into bag

Station 5: Filling 2---this station can be filling second step or option such as  vibration...

Station 6: Sealing 1----this station can be sealing or option such as buffer,nitrogen flush...

Station 7: Sealing 2---Sealing bag

Station 8: output
 

Packaging & Shipping

Company Profile

ECHO MACHINERY COMPNAY is specialized in packing machine for 24 years. Since 2000, the factory of ECHO began to R&P pre-made packing machine.
We have a very strong team in research, design and production. ECHO is China's largestpre-made packing machine manufacturer which covering an area of 10000 square meters, and more than 150 employees. The the annual output reached more than 1000 units. And ourmachine also got 1S09001 certification, CE approval and many utility model patents.
We provide nice pre-sales consultation,program design and optimization product recommendatioSimultaneously, we also have perfect production progress tracking service, timely after-salessolving solution, excellent one-to-one service and establishing comprehen sive customer files.

We Provide:

Not Only Products But Also Services And Design
Customer Service:Consulting, Design, Solution And So On.

 

After Sales Service

On-purchase Serive:Training, Technical Support;Expericed QC Team, Progress Tracking;Shipping Door To Door.

After Service:   Warranty ls 14months From Bl Date;
                          7x24 Hours On Line;
                          Experice Technical With Apec Car

 

FAQ

Q:What's your delivery date?
A: Usually finish the production within 40 working days after your 30% advanced payment, actually needto check according our stock & production plan.

Q:Terms of payment?
A: We accept T/T,30% in advance and 70% balanced against B/L copy.
We accept L/C at sight. We accept Cash.

Q: How many days will you finish installing ?
A: We will finish installation and training within 15days.

Q: How long is your machine's warranty period?
A: All our machine have one year guarantee, starting from finished installation

Q: How could we do after one year warranty period?
A: We also can do service for you, however, if require overseas service, you need pay salary toour technician 200USD/day.

Q: How could we do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.

Q: How many worker do we need running those machines?
A: For flexo printing, slitting, die-cutting machine, only need one person for each.

Q:What should we charge for your engineer?
A: You should charge for the cost of our engineer's visa , air tickets, hotel, food ,and also theirsalary 200USD one day per person.

 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA