Thermoplastic Road Paint Marking Material Density 1.8-2.1g/cm3

Price $700.00 Compare
Min Order 1 Ton
Shipping From Shandong, China
Popularity 386 people viewed
Quantity
+-
 

Shandong Baicheng Transportation Facilities Co., Ltd.

VIP   Audited Supplier 3 years
Profile Certified by SGS/BV
Titanium Dioxide, Glass Beads, Resin
Powder
White, Yellow, Other Options Will Be Available
Road Marking Paint, Parking Lot
Powder Coating
Mixture
Machine Brush
Powder Coating
Mark on The Road with Effects of Guidance and War
Normal Thermoplastic
25kg/Bag
180-200°c
High Dirty Pick-up Resistance
Bag
25kg/bag
China
Product Description
 
Thermoplastic road marking paint consists of C5 petroleum resin, EVA, PE wax, filler materials, which is solid powder state at normal temperatures. It will liquify if heated by pre-heater to 180-200ºC. Coating the paint onto the road, a hard film will form. With reflective glass beads sprinkled onto the surface, it has good reflective effect in the dark, making it widely applied to roads and highways. Paint can be customized according to your local environmental conditions, such as temperature and humidity.
Product Parameters

TECHNICAL SPECIFICATION

Product nameThermoplastic Paint for Road Marking
Ingredient C5 petroleum resin, titanium dioxide, PE wax and so on
ColorWhite/yellow/red/blue/green/customized
Packing25kg/bag
Density(g/cm3)1.8-2.3
Softening point(ºC)90-125  
Compressive strength(MPa)≥12  
Liquidity35±10  
Glass bead content0 / 20% / 25% / 30%
 
Product Description

 


 
Company Profile

 


 

Packaging & Shipping

FAQ

 


Q1: How can l get a quotation?
A1: Please send us your inquiry, our sales team will communicate with you and quote you as soon as possible.

Q2: Can I get a sample before place order?
A2: Yes, we could provide the sample of paint for free and it will be prepared within 3 days.  

Q3: Do you provide customized service?
A3: Yes, we have professional technical team. If you have special requirements, such as color of paint, glass bead content, please let us know.  

Q4: What is your leading time ?
A4: Generally , the leading time is within 7 days, also depending on your quantity. 

Q5: What is your terms of payment?
A5: Payment terms vary depending on countries. Generally, payment≤10,000 USD, 100% T/T in advance; payment>10,000 USD, 30% T/T in advance, balance before shipment.

 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA