90% Solid Content Solvent Based Polyurethane Water Proofing Coatings (Supplier From China)

Price $1.95 Compare
Min Order 2000 kg
Shipping From Liaoning, China
Popularity 224 people viewed
Quantity
+-
 

Eonzeal Construction Materials Co., Ltd.

VIP   Audited Supplier 7 years
Profile Certified by SGS/BV
PU-1
ISO, MSDS
Polyurethane, PU
90% Solid Content Solvent Based Polyurethane Water
Waterproofing
Roof
Yes
UV Resistant
Waterproof Paint
Liquid
Film Coated
Waterproof
Grey
Indoor
3-5years
3-5years
Color: Red, Grey, Black
Polyurethane
EONZEAL
Pails
20kg/pail
China
Product Description
   90% Solid Content Solvent Based Polyurethane Water Proofing Coatings Supplier From China



DESCRIPTION


PU Polyurethane Waterproofing Coating is a moisture-cured waterproof coating, form a seamless film by absorbing moisture from the air; with high flexibility and elongation, strong ability to substrates deformation, waterproof life up to 15 years.


FEATURES
  • Ready to use straight from the pail
  • Stable performance
  • 540% high elongation
  • Solvent based, can be compounded with high polymer membrane and self-adhesive modified bitumen waterproof membrane
  • Non-toxic, environmentally-friendly
  • Available in red, black or grey

TECHNICAL DATA
ITEMSTANDARDRESULT
AppearanceRed or grey or black liquid/
   
Solid content,% ≥8590.4
   
Elongation,%≥500542
   
Surface drying time, h≤128
   
Fully drying time, h≤2420
   
Tensile strength, MPa≥22.97
   
Tear strength, N/mm≥1526
   
Low temperature flexibility,ºC≤-35 ºC no crackingPass
   
All measurements are taken at 22ºC and 50% relative humidity. Specifications vary
according to site conditions and should be taken as a guide only.



COVERAGE

Recommend dosage: 1.65 kg/sqm, 1mm thickness, total thickness no less than 1.5mm.


SHELF LIFE

Do not store product exposed to weather and sun. When kept in a cool, dry and protect area, sealed pail have a 12-months shelf life.



SURFACE PREPARATION
  • All surfaces must  be structurally sound, dry, clean and free from movement, oil, grease, wax, curing compounds, release agents and any other loose or contaminating material
  • Prior to application, remove all sharp protrusions, which may pierce the membrane
  • The external and internal corner are made to be arc.
         Internal corner: D≥ 50mm
         External corner: D≥ 10mm

APPLICATION GUIDANCE
  • LEVELINGSubstrate should be smooth and firm.
  • CLEANINGNo garbage, floating pulp on the substrate, keep it dry. Prime the concrete surface
  • FIRST COATINGThe first layer should be very thin, covering the substrate is enough, less than 0.5mm thickness.
  • SECOND & THIRD COATINGApply the second layer provided the first layer is cured. Coating direction is vertical to the first one and then the third layer`s direction is the same as the first one.



PRECAUTION
  • Second layer is the thickest one, the third one is very thin, just for leveling.
  • Interval time depends on the application site, but typically full drying time is about 20 hours.
  • Fiber reinforcing layer is necessary for inside corner internal corner, floor drain, pipe joints etc, the lap width should not be less than 100mm, extensive application after joints treatment.
  • Use PU out after opening, time within 8 hours. Long-term storage will cause the forming of a thin film on the surface. Remove this when application. Does not affect the performance of product.


 


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA