500mm HDPE Double Wall Corrugated Pipe Extrusion Line with Aluminum Mold

Price $10.00 Compare
Min Order 1 Piece
Shipping From Shanghai, China
Popularity 304 people viewed
Quantity
+-
 

Shanghai Hannshine Plastic Machinery Co., Ltd

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
500mm
One Year
PVC and PE Pipe
Single-screw
Automatic
Computerized
Customized
New
After Good Service
Steel
Cast-Aluminium Heating Plates
40cr/3cr17, 304SUS
Forming Mould
Extruder
10m/Min
Water Pipe
HDPE, PVC
CNC-Plastic Mould
Hot Runner\ Cold Runner
40cr or Steel
Shaping Pipes
20-630mm and Customized
Double Wall Screw
Aluminium
Hannshine
Wooden Cases
160mm
Shanghai Hannshine
84779000
Product Description
 
Product Description

It mainly forms a wave shape inside the extruded material and plays a cooling and shaping role.
We can customize the formed aluminum mold according to customer requirements, and the pipe material (ring stiffness, ring flexibility, weight) can be customized according to market requirements
.

As commonly used pipe, double wall corrugated pipe is important tool to dredge and drain.As the forming mould when producing the double wall corrugated pipe, it has a little difference with the common pipe mould. The double wall corrugated pipe mould is consist of former model, later mold, insert items, row bit, slant, thimble, flow gate and so on.The shape and thickness of mould can infulence the final products.

Product Parameters
 
Model
Type
cooling method
Module width
Number of modules
110-250mm
Horizontal type;Standard speed
Air cooling
132mm
48 pairs/set
200-500mm
157mm
40 pairs/set
200-500mm
Horizontal type;High speed
Water cooling
175.5mm
36 pairs/set
200-800mm
175.5mm
36 pairs/set
100-300mm
175.5mm
36 pairs/set
200-800mm
Vertical type;Standard speed
Air cooling
203.2mm
32 pairs/set
Detailed Photos

 

Sample Display

 

 
Our Advantages

1. Regardless of material viscosity variation ,widely applicable for HDPE/MDPE,PERT,PP/PPR,PPR-FIBER,PB,PS/ABS and HMW-PE pipe production with reliable processing property .
2. High output but rather low pressure drop and melt temperature 
3. Capacious and smooth runner reduces the pipe stress to the minimum
4.High quality cermic heater with long service life
5.Pipe with scratch-free smooth surface finishing

6. Die head raw material with special surface treament.
7. Different die head design especially for its inner stucture to make sure pipe extrusion sucessfully.
8. Heating system to keep the pipe extrusion at proplery temperature during extrusion.
9. Choose properly material for Calibrating sleeve to make its longer service life and better pipe surface.

High output but rather low pressure drop and melt temperature 
. Capacious and smooth runner reduces the pipe stress to the minimum
High quality cermic heater with long service life
Pipe with scratch-free smooth surface finishing
Product process

Production process of our Plastic extrusion mould extrusion die head,
1. Quality Control for income Raw material.
2. Material Heat treatment.
3. Raw material will do Wire-electrode cutting, CNC machining,drilling,etc.
4.Finished components will do pre-assembly, after that, polishing components to make sure all components match together perfect and with smooth surface. Lastly, extrusion die head will do Chrome-plating process.
5. Plastic Extrusoin mould extrusion die head will do assembly again.
6. Ready Package and delivery.

FAQ

What's The Main Business In Your Company? The main products are PE/PPR/PVC pipe production lines,WPC/PVC profile produciton lines,PET bottles and PP/PE films recycling line,Plastic wastes pelletizing lines, and all kinds of otherauxiliary equipments,such as Mixer,Crusher,Pulverizer,Shredder,Water Chiller and so on.

Can you tell me your payment way and delivery and guarantee time?
1. Delivery Time: 30 working days after receiving your down payment.
2. Payment Condition: 30% by T/T for deposit and 70% by T/T before delivery time.
3.Guarantee: 12 months for the machine (the electric parts for 6 months).

 How about your arrangement for inspection,installation and testing work?
1. After all machines are delivered to customer's factory;
2.We will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
3.The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance for each engineer.
4.Engineer will give free training lessons to labors in buyer's factory.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA