Calibrating Sleeves Vacuum Copper Calibrator for PP Pex PE Pipe

Price $10.00 Compare
Min Order 1 Piece
Shipping From Shanghai, China
Popularity 211 people viewed
Quantity
+-
 

Shanghai Hannshine Plastic Machinery Co., Ltd

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
One Year
PE Pipe
Single-screw
Automatic
Computerized
Customized
New
After Good Service
Mold Steel/Mould Steel
Cast-Aluminium Heating Plates
40cr/3cr17, 304SUS
3cr17monov
Mirror Polish
1*2
HDPE, PVC, PP, PE Pipe
CNC-Plastic Mould
Hot Runner\ Cold Runner
40cr/3cr17/304SUS
Shaping Pipes
20-630mm and Customized
10m/Min
Hannshine
Wooden Cases
160mm
Shanghai Hannshine
84779000
Product Description
Product Description

Plastic Pipe Extrusion mold is a kind of molding mold, but his way of discharging is to achieve through the action of extrusion.It is widely used in aluminum shaped structure and also in plastic parts.In the front end of the extruder, used for making pipe, or profile. In short, the mold is used to shape the tool, this tool is composed of various parts, different mold is composed of different parts, it mainly through the formation of material physical state change to achieve the shape of the object processing.
The mould is the main processing tool for manufacturing parts in industrial departments such as machinery manufacturing, radio instrument, motor and electric appliance.The quality of die directly affects the quality of pressure processing technology, the precision output of products and production cost. Besides rational structure design and machining accuracy, the quality and service life of molds are mainly affected by mold materials and heat treatment.

 
Product Parameters
MaterialPipe Outer diameter(mm)
PVCØ16-Ø63(high-speed)Ø50-Ø160Ø50- Ø250Ø160-Ø400Ø315-Ø630Ø710- Ø1000Ø800-Ø1200  
PEØ16-Ø63(high-speed)Ø20-Ø110Ø40-Ø160Ø50-Ø250Ø110-Ø450Ø250-Ø630Ø500-Ø800Ø710-Ø1200Ø1000-Ø1600
PPR PPØ16-Ø63(high-speed )Ø20-Ø110Ø40-Ø160Ø50-Ø250    
Detailed Photos
Our Advantages

1. Regardless of material viscosity variation ,widely applicable for HDPE/MDPE,PERT,PP/PPR,PPR-FIBER,PB,PS/ABS and HMW-PE pipe production with reliable processing property .
2. High output but rather low pressure drop and melt temperature 
3. Capacious and smooth runner reduces the pipe stress to the minimum
4.High quality cermic heater with long service life
5.Pipe with scratch-free smooth surface finishing

6. Die head raw material with special surface treament.
7. Different die head design especially for its inner stucture to make sure pipe extrusion sucessfully.
8. Heating system to keep the pipe extrusion at proplery temperature during extrusion.
9. Choose properly material for Calibrating sleeve to make its longer service life and better pipe surface.

High output but rather low pressure drop and melt temperature 
. Capacious and smooth runner reduces the pipe stress to the minimum
High quality cermic heater with long service life
Pipe with scratch-free smooth surface finishing
Product process

Production process of our Plastic extrusion mould extrusion die head,
1. Quality Control for income Raw material.
2. Material Heat treatment.
3. Raw material will do Wire-electrode cutting, CNC machining,drilling,etc.
4.Finished components will do pre-assembly, after that, polishing components to make sure all components match together perfect and with smooth surface. Lastly, extrusion die head will do Chrome-plating process.
5. Plastic Extrusoin mould extrusion die head will do assembly again.
6. Ready Package and delivery.

FAQ

What's The Main Business In Your Company? The main products are PE/PPR/PVC pipe production lines,WPC/PVC profile produciton lines,PET bottles and PP/PE films recycling line,Plastic wastes pelletizing lines, and all kinds of otherauxiliary equipments,such as Mixer,Crusher,Pulverizer,Shredder,Water Chiller and so on.

Can you tell me your payment way and delivery and guarantee time?
1. Delivery Time: 30 working days after receiving your down payment.
2. Payment Condition: 30% by T/T for deposit and 70% by T/T before delivery time.
3.Guarantee: 12 months for the machine (the electric parts for 6 months).

 How about your arrangement for inspection,installation and testing work?
1. After all machines are delivered to customer's factory;
2.We will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
3.The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance for each engineer.
4.Engineer will give free training lessons to labors in buyer's factory.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA